Production planning and control for remanufacturing: industry practice and research needs
The DOI matches its Crossref record; 26 of the 26 references it cites were found in a registry or an index.
Abstract
Remanufacturing represents a higher form of reuse by focusing on value‐added recovery, rather than materials recovery (i.e., recycling). Remanufacturing systems are widespread in the United States and are profitable. However, the management of production planning and control activities can differ greatly from management activities in traditional manufacturing. We report on managerial remanufacturing practices via a survey of production planning and control activities at remanufacturing firms in the United States. Production planning and control activities are more complex for remanufacturing firms due to uncertainties from stochastic product returns, imbalances in return and demand rates, and the unknown condition of returned products. We identify and discuss seven complicating characteristics that require significant changes in production planning and control activities. We also describe the research opportunities that exist for each of the complicating characteristics.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
(2005) · Proceedings of the Water Environment Federation · doi:10.2175/193864705783867675 · Cited by 6,678
Quantitative models for reverse logistics: A review
Fleischmann, M., Bloemhof-Ruwaard, J. M., Dekker, R., van der Laan, E., van Nunen, J. A. E. E., & Van Wassenhove, L. N. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00230-0 · Cited by 1,902
Strategic Issues in Product Recovery Management
Thierry, M., Salomon, M., Van Nunen, J., & Van Wassenhove, L. (1995) · California Management Review · doi:10.2307/41165792 · Cited by 1,437
Issues in environmentally conscious manufacturing and product recovery: a survey
Gungor, A., & Gupta, S. M. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00167-9 · Cited by 1,107
A closed-loop logistics model for remanufacturing
Jayaraman, V, Guide, V. D. R., & Srivastava, R. (1999) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600716 · Cited by 537
Self-citationReturnable containers: an example of reverse logistics
Kroon, L., & Vrijens, G. (1995) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600039510083934 · Cited by 397
Production planning and inventory control with remanufacturing and disposal
van der Laan, E., & Salomon, M. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00108-2 · Cited by 304
The EOQ repair and waste disposal model with variable setup numbers
Richter, K. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00276-6 · Cited by 258
GUPTA, S. M., & TALEB, K. N. (1994) · International Journal of Production Research · doi:10.1080/00207549408957046 · Cited by 227
Forecasting the returns of reusable containers
Kelle, P., & Silver, E. A. (1989) · Journal of Operations Management · doi:10.1016/s0272-6963(89)80003-8 · Cited by 210
Production planning and control for remanufacturing: a state-of-the-art survey
Guide, V. D. R., Jayaraman, V., & Srivastava, R. (1999) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/s0736-5845(99)00020-4 · Cited by 191
Self-citationThe economics of tire remanufacturing
Ferrer, G. (1997) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(96)01181-0 · Cited by 187
Planning product disassembly for material recovery opportunities
JOHNSON, M. R., & WANG, M. H. (1995) · International Journal of Production Research · doi:10.1080/00207549508904864 · Cited by 186
An analysis of single item inventory systems with returns
Muckstadt, J. A., & Isaac, M. H. (1981) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800280207 · Cited by 176
Determination of a disassembly strategy
Penev, K. D., & de Ron, A. J. (1996) · International Journal of Production Research · doi:10.1080/00207549608904915 · Cited by 166
van der Laan, E., Salomon, M., & Dekker, R. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00108-8 · Cited by 159
Scheduling policies for remanufacturing
Guide, V. D. R., Kraus, M. E., & Srivastava, R. V. (1997) · International Journal of Production Economics · doi:10.1016/s0925-5273(96)00091-6 · Cited by 159
Self-citationAn (s, Q) inventory model with remanufacturing and disposal
van der Laan, E., Dekker, R., Salomon, M., & Ridder, A. (1996) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00020-8 · Cited by 147
Inventory buffers in recoverable manufacturing
Guide, V. D. R., & Srivastava, R. V. (1998) · Journal of Operations Management · doi:10.1016/s0272-6963(97)00024-7 · Cited by 145
Self-citationProduct remanufacturing and disposal: A numerical comparison of alternative control strategies
van der Laan, E., Dekker, R., & Salomon, M. (1996) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00137-9 · Cited by 129
Product structure complexity and scheduling of operations in recoverable manufacturing
Guide, V. D. R., Srivastava, R., & Kraus, M. E. (1997) · International Journal of Production Research · doi:10.1080/002075497194345 · Cited by 125
Self-citationThe economics of personal computer remanufacturing
Ferrer, G. (1997) · Resources Conservation and Recycling · doi:10.1016/s0921-3449(97)00030-x · Cited by 118
An evaluation of capacity planning techniques in a remanufacturing environment
Guide, V. D. R., Srivastava, R., & Spencer, M. S. (1997) · International Journal of Production Research · doi:10.1080/002075497195984 · Cited by 115
Self-citationA Statistical Methodology for the Analysis of the Life-Cycle of Reusable Containers
Goh, T. N., & Varaprasad, N. (1986) · IIE Transactions · doi:10.1080/07408178608975328 · Cited by 112
Buffering from Material Recovery Uncertainty in a Recoverable Manufacturing Environment
Guide, V. D. R., & Srivastava, R. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600402 · Cited by 79
Self-citationThe role of supply chain management within the industrial ecosystem
Sarkis, J., Darnall, N., Nehman, G. I., & Priest, J. W. (2002) · IEEE International Symposium on Electronics and the Environment (ISEE) · doi:10.1109/isee.1995.514981 · Cited by 32
Cited by
Green supply-chain management: a state-of-the-art literature review
Srivastava, S. K. (2007) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2007.00202.x · Cited by 3,984
“Blumberg (1999) conducted in-depth surveys of logistics and purchasing executives in more than 400 firms, while Guide (2000) carried out surveys on production planning and control in remanufacturing; Zhu and Sarkis (2004) carried out a survey of 186 respondents in Chinese manufacturing enterprises,…”
BackgroundInfluentialSustainable supply chains: An introduction
Linton, J. D., Klassen, R., & Jayaraman, V. (2007) · Journal of Operations Management · doi:10.1016/j.jom.2007.01.012 · Cited by 1,746
Targets for a circular economy
Morseletto, P. (2020) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2019.104553 · Cited by 1,414
OR FORUM—The Evolution of Closed-Loop Supply Chain Research
Guide, V. D. R., & Van Wassenhove, L. N. (2009) · Operations Research · doi:10.1287/opre.1080.0628 · Cited by 1,408
Self-citationA review of Internet of Things (IoT) embedded sustainable supply chain for industry 4.0 requirements
Manavalan, E., & Jayakrishna, K. (2019) · Computers & Industrial Engineering · doi:10.1016/j.cie.2018.11.030 · Cited by 1,054
Metadata
- Authors
- Guide, V. D. R.
- Venue
- Journal of Operations Management
- Publisher
- Wiley
- Published
- 2000-06
- Volume
- 18
- Issue
- 4
- Pages
- 467-483
- ISSN
- 0272-6963 (ISSN-L)
- 1873-1317
- OpenAlex
- W2029123070
- Cited by
- 1,098
- References
- 26
- FWCI
- 43.61
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.