Resource-constrained project scheduling: Notation, classification, models, and methods
The DOI matches its Crossref record; 52 of the 52 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Consistency in networks of relations
Mackworth, A. K. (1977) · Artificial Intelligence · doi:10.1016/0004-3702(77)90007-8 · Cited by 2,498
Brucker, P. (2004) · Springer eBooks · doi:10.1007/978-3-540-24804-0 · Cited by 2,064
Self-citationA new approach to the maximum-flow problem
Goldberg, A. V., & Tarjan, R. E. (1988) · Journal of the ACM · doi:10.1145/48014.61051 · Cited by 1,882
Foundations of Constraint Satisfaction
(1993) · Elsevier eBooks · doi:10.1016/c2013-0-07627-x · Cited by 1,629
Scheduling subject to resource constraints: classification and complexity
Blazewicz, J., Lenstra, J. K., & Kan, A. H. G. R. (1983) · Discrete Applied Mathematics · doi:10.1016/0166-218x(83)90012-4 · Cited by 1,436
Networks of constraints: Fundamental properties and applications to picture processing
Montanari, U. (1974) · Information Sciences · doi:10.1016/0020-0255(74)90008-5 · Cited by 1,275
Constraint satisfaction in logic programming
Hentenryck, P. V. (1989) · Medical Entomology and Zoology · Cited by 1,218
An Algorithm for Solving the Job-Shop Problem
Carlier, J., & Pinson, É. (1989) · Management Science · doi:10.1287/mnsc.35.2.164 · Cited by 922
Understanding Line drawings of Scenes with Shadows
Waltz, D. L. (1975) · Cited by 917
Cited by
Mladenović, N., & Hansen, P. (1997) · Computers & Operations Research · doi:10.1016/s0305-0548(97)00031-2 · Cited by 4,254
Network Function Virtualization: State-of-the-Art and Research Challenges
Mijumbi, R., Serrat, J., Gorricho, J.-L., Bouten, N., De Turck, F., & Boutaba, R. (2016) · IEEE Communications Surveys & Tutorials · doi:10.1109/comst.2015.2477041 · Cited by 1,933
On Uncertainty, Ambiguity, and Complexity in Project Management
Pich, M. T., Loch, C. H., & Meyer, A. D. (2002) · Management Science · doi:10.1287/mnsc.48.8.1008.163 · Cited by 942
Ant colony optimization for resource-constrained project scheduling
Merkle, D., Middendorf, M., & Schmeck, H. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2002.802450 · Cited by 759
Chandra Mohan, B., & Baskaran, R. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.09.076 · Cited by 381
Cross dock scheduling: Classification, literature review and research agenda
Boysen, N., & Fliedner, M. (2010) · Omega · doi:10.1016/j.omega.2009.10.008 · Cited by 363
Peteghem, V. V., & Vanhoucke, M. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.03.034 · Cited by 310
A Robust Genetic Algorithm for Resource Allocation in Project Scheduling
Alcaraz, J., & Maroto, C. (2001) · Annals of Operations Research · doi:10.1023/a:1010949931021 · Cited by 275
A taxonomy for task allocation problems with temporal and ordering constraints
Nunes, E., Manner, M., Mitiche, H., & Gini, M. (2017) · Robotics and Autonomous Systems · doi:10.1016/j.robot.2016.10.008 · Cited by 252
Hansen, P., & Mladenović, N. (2003) · International Series in Operations Research & Management Science · doi:10.1007/0-306-48056-5_6 · Cited by 227
A Survey of Activity Network‐Based Process Models for Managing Product Development Projects
Browning, T. R., & Ramasesh, R. V. (2007) · Production and Operations Management · doi:10.1111/j.1937-5956.2007.tb00177.x · Cited by 210
“Accounting for the effects of resource constraints and allocations, Brucker et al. (1999) and Herroelen (2005) review the vast literature on resource-constrained project scheduling.”
BackgroundA Constraint-Based Method for Project Scheduling with Time Windows
Cesta, A., Oddi, A., & Smith, S. F. (2002) · Journal of Heuristics · doi:10.1023/a:1013617802515 · Cited by 206
“The Resource Constrained Project Scheduling Problem (RCPSP) has been widely studied in Operations Research (OR) literature (see [4] for a recent survey).”
BackgroundGenetic algorithm solution for a risk-based partner selection problem in a virtual enterprise
Ip, W. H., Huang, M., Yung, K. L., & Wang, D. (2003) · Computers & Operations Research · doi:10.1016/s0305-0548(01)00092-2 · Cited by 190
Lova, A., Tormos, P., Cervantes, M., & Barber, F. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.11.002 · Cited by 186
Six decades of project management research: Thematic trends and future opportunities
Padalkar, M., & Gopinath, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.006 · Cited by 182
Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler
Chen, W.-N., & Zhang, J. (2013) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2012.17 · Cited by 180
“With this strategy, the proposed method enables the modeling of resource conflict and task preemption and preserves the flexibility in human resource allocation.”
MethodA framework for collaborative planning and state-of-the-art
Stadtler, H. (2009) · OR Spectrum · doi:10.1007/s00291-007-0104-5 · Cited by 174
“for the RCPSP see Brucker et al. (1999) and for lot-sizing see Drexl and Kimms (1997)].”
BackgroundScheduling an operating theatre under human resource constraints
Roland, B., Di Martinelly, C., Riane, F., & Pochet, Y. (2010) · Computers & Industrial Engineering · doi:10.1016/j.cie.2009.01.005 · Cited by 170
“This is where we join up with classical RCPSP.”
MethodComplexity, uncertainty-reduction strategies, and project performance
Floricel, S., Michela, J. L., & Piperca, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.11.007 · Cited by 169
“hierarchies and temporal sequences assume that a representation is somehow able to constrain actors’ behavior, and all that’s left is to maximize the efficiency of its structure and sequence, in light of number and diversity of participants, tasks and resources, precedence relations, and effort or duration uncertainti…”
BackgroundScheduling of deconstruction projects under resource constraints
Schultmann, F., & Rentz, O. (2002) · Construction Management and Economics · doi:10.1080/01446190210135913 · Cited by 24
“Several further criteria, like minimizing the average completion time, the average weighted tardiness of the activities, and minimizing the net present value or levelling of resources, might also be considered (Slowinski et al., 1994; Sprecher, 1994; Brucker et al., 1999).”
Background
Metadata
- Authors
- Brucker, P., Drexl, A., Möhring, R., Neumann, K., & Pesch, E.
- Venue
- European Journal of Operational Research
- Publisher
- Elsevier BV
- Published
- 1999-01
- Volume
- 112
- Issue
- 1
- Pages
- 3-41
- ISSN
- 0377-2217 (ISSN-L)
- OpenAlex
- W2038345112
- Cited by
- 1,500
- References
- 52
- FWCI
- 46.33
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.