Resource-constrained project scheduling: Notation, classification, models, and methods
The DOI matches its Crossref record; 52 of the 52 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Consistency in networks of relations
Mackworth, A. K. (1977) · Artificial Intelligence · doi:10.1016/0004-3702(77)90007-8 · Cited by 2,498
Brucker, P. (2004) · Springer eBooks · doi:10.1007/978-3-540-24804-0 · Cited by 2,064
Self-citationA new approach to the maximum-flow problem
Goldberg, A. V., & Tarjan, R. E. (1988) · Journal of the ACM · doi:10.1145/48014.61051 · Cited by 1,882
Foundations of Constraint Satisfaction
(1993) · Elsevier eBooks · doi:10.1016/c2013-0-07627-x · Cited by 1,629
Scheduling subject to resource constraints: classification and complexity
Blazewicz, J., Lenstra, J. K., & Kan, A. H. G. R. (1983) · Discrete Applied Mathematics · doi:10.1016/0166-218x(83)90012-4 · Cited by 1,436
Networks of constraints: Fundamental properties and applications to picture processing
Montanari, U. (1974) · Information Sciences · doi:10.1016/0020-0255(74)90008-5 · Cited by 1,275
Constraint satisfaction in logic programming
Hentenryck, P. V. (1989) · Medical Entomology and Zoology · Cited by 1,218
An Algorithm for Solving the Job-Shop Problem
Carlier, J., & Pinson, É. (1989) · Management Science · doi:10.1287/mnsc.35.2.164 · Cited by 922
Understanding Line drawings of Scenes with Shadows
Waltz, D. L. (1975) · Cited by 917
Critical-Path Planning and Scheduling: Mathematical Basis
Kelley, J. E. (1961) · Operations Research · doi:10.1287/opre.9.3.296 · Cited by 910
A Sufficient Condition for Backtrack-Free Search
Freuder, E. C. (1982) · Journal of the ACM · doi:10.1145/322290.322292 · Cited by 660
Activity networks: Project planning and control by network models
Elmaghraby, S. E. (1977) · Medical Entomology and Zoology · Cited by 582
Critical-path planning and scheduling
Kelley, J. E., & Walker, M. R. (1959) · Papers presented at the December 1-3, 1959, eastern joint IRE-AIEE-ACM computer conference on - IRE-AIEE-ACM '59 (Eastern) · doi:10.1145/1460299.1460318 · Cited by 569
A competitive genetic algorithm for resource-constrained project scheduling
Hartmann, S. (1998) · Naval Research Logistics · doi:10.1002/(sici)1520-6750(199810)45:7<733::aid-nav5>3.0.co;2-c · Cited by 568
The job shop scheduling problem: Conventional and new solution techniques
Błażewicz, J., Domschke, W., & Pesch, E. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00362-2 · Cited by 536
Self-citationThe one-machine sequencing problem
Carlier, J. (1982) · European Journal of Operational Research · doi:10.1016/s0377-2217(82)80007-6 · Cited by 528
A branch and bound algorithm for the job-shop scheduling problem
Brucker, P., Jurisch, B., & Sievers, B. (1994) · Discrete Applied Mathematics · doi:10.1016/0166-218x(94)90204-6 · Cited by 499
Self-citationResource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
Talbot, F. B. (1982) · Management Science · doi:10.1287/mnsc.28.10.1197 · Cited by 456
A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
Davis, E. W., & Patterson, J. H. (1975) · Management Science · doi:10.1287/mnsc.21.8.944 · Cited by 454
Letter to the Editor—Monte Carlo Methods and the PERT Problem
Slyke, R. M. V. (1963) · Operations Research · doi:10.1287/opre.11.5.839 · Cited by 272
Substitution Decomposition for Discrete Structures and Connections with Combinatorial Optimization
Möhring, R. H., & Radermacher, F. J. (1984) · North-Holland Mathematics Studies · doi:10.1016/s0304-0208(08)72966-9 · Cited by 258
Self-citationMONTE CARLO METHODS AND THE PERT PROBLEM
Slyke, V., & Richard, M. (1963) · Cited by 240
A practical use of Jackson's preemptive schedule for solving the job shop problem
Carlier, J., & Pinson, É. (1990) · Annals of Operations Research · doi:10.1007/bf03543071 · Cited by 217
Talbot, F. B., & Patterson, J. H. (1978) · Management Science · doi:10.1287/mnsc.24.11.1163 · Cited by 209
Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
Möhring, R. H. (1984) · Operations Research · doi:10.1287/opre.32.1.89 · Cited by 202
Self-citationChapter 11 Network reliability
Ball, M. O., Colbourn, C. J., & Provan, J. S. (1995) · Handbooks in operations research and management science · doi:10.1016/s0927-0507(05)80128-8 · Cited by 189
Bounding the Project Completion Time Distribution in PERT Networks
Dodin, B. (1985) · Operations Research · doi:10.1287/opre.33.4.862 · Cited by 179
Project network models with discounted cash flows a guided tour through recent developments
Herroelen, W. S., Dommelen, P. V., & Demeulemeester, E. L. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(96)00112-9 · Cited by 173
Pape, C. L. (1994) · Intelligent Systems Engineering · doi:10.1049/ise.1994.0009 · Cited by 172
A new approach to computing optimal schedules for the job-shop scheduling problem
Martin, P., & Shmoys, D. B. (1996) · Lecture notes in computer science · doi:10.1007/3-540-61310-2_29 · Cited by 169
Computational complexity of PERT problems
Hagstrom, J. N. (1988) · Networks · doi:10.1002/net.3230180206 · Cited by 169
Project Scheduling under Resource Constraints
Kolisch, R. (1995) · Physica-Verlag eBooks · doi:10.1007/978-3-642-50296-5 · Cited by 168
Igelmund, G., & Radermacher, F. J. (1983) · Networks · doi:10.1002/net.3230130102 · Cited by 163
AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS
PATTERSON, J. H., SŁOWIŃSKI, R., TALBOT, F. B., & WĘGLARZ, J. (1989) · Advances in Project Scheduling · doi:10.1016/b978-0-444-87358-3.50005-5 · Cited by 162
Stochastic scheduling problems I — General strategies
Möhring, R. H., Radermacher, F. J., & Weiss, G. (1984) · Zeitschrift für Operations Research · doi:10.1007/bf01919323 · Cited by 159
Self-citationProject Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes
Kolisch, R. (1995) · Medical Entomology and Zoology · Cited by 157
Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis
Burt, J. M., & Garman, M. B. (1971) · Management Science · doi:10.1287/mnsc.18.3.207 · Cited by 154
Klein, R., & Schöll, A. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00442-6 · Cited by 152
The multi-mode resource-constrained project scheduling problem with generalized precedence relations
Reyck, B. D., & Herroelen, W. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00151-4 · Cited by 147
Project scheduling: The effects of problem structure on heuristic performance
Patterson, J. H. (1976) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800230110 · Cited by 141
DSS for multiobjective project scheduling
Słowiński, R., Soniewicki, B., & Węglarz, J. (1994) · European Journal of Operational Research · doi:10.1016/0377-2217(94)90353-0 · Cited by 139
The scheduling of activities to maximize the net present value of projects
Elmaghraby, S. E., & Herroelen, W. S. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90118-u · Cited by 124
Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case
Sprecher, A. (1994) · Cited by 113
Cumulative Scheduling with Task Intervals.
Caseau, Y., & Laburthe, F. (1996) · Cited by 98
Bounding distributions for a stochastic pert network
Shogan, A. W. (1977) · Networks · doi:10.1002/net.3230070407 · Cited by 91
Resource-Constrained Project Scheduling
Sprecher, A. (1994) · Lecture notes in economics and mathematical systems · doi:10.1007/978-3-642-48397-4 · Cited by 72
The job-shop problem and immediate selection
Brucker, P., Jurisch, B., & Krämer, A. (1994) · Annals of Operations Research · doi:10.1007/bf02085636 · Cited by 53
Self-citationThe Job-Shop Problem and Immediate Selection
Brucker, P., Jurisch, B., & Krämer, A. (1994) · Physica-Verlag eBooks · doi:10.1007/978-3-642-46955-8_20 · Cited by 47
Self-citationElmaghraby, S. E. (1989) · Elsevier eBooks · doi:10.1016/b978-0-444-87358-3.50021-3 · Cited by 39
THE ORDER-THEORETIC APPROACH TO SCHEDULING: THE STOCHASTIC CASE
Möhring, R. H., & Radermacher, F. J. (1989) · Elsevier eBooks · doi:10.1016/b978-0-444-87358-3.50024-9 · Cited by 21
Self-citationRisk taking in stochastic PERT networks
Soroush, H. M. (1993) · European Journal of Operational Research · doi:10.1016/0377-2217(93)90063-s · Cited by 14
Cited by
Mladenović, N., & Hansen, P. (1997) · Computers & Operations Research · doi:10.1016/s0305-0548(97)00031-2 · Cited by 4,254
Network Function Virtualization: State-of-the-Art and Research Challenges
Mijumbi, R., Serrat, J., Gorricho, J.-L., Bouten, N., De Turck, F., & Boutaba, R. (2016) · IEEE Communications Surveys & Tutorials · doi:10.1109/comst.2015.2477041 · Cited by 1,933
On Uncertainty, Ambiguity, and Complexity in Project Management
Pich, M. T., Loch, C. H., & Meyer, A. D. (2002) · Management Science · doi:10.1287/mnsc.48.8.1008.163 · Cited by 942
Ant colony optimization for resource-constrained project scheduling
Merkle, D., Middendorf, M., & Schmeck, H. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2002.802450 · Cited by 759
Chandra Mohan, B., & Baskaran, R. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.09.076 · Cited by 381
Metadata
- Authors
- Brucker, P., Drexl, A., Möhring, R., Neumann, K., & Pesch, E.
- Venue
- European Journal of Operational Research
- Publisher
- Elsevier BV
- Published
- 1999-01
- Volume
- 112
- Issue
- 1
- Pages
- 3-41
- ISSN
- 0377-2217 (ISSN-L)
- OpenAlex
- W2038345112
- Cited by
- 1,500
- References
- 52
- FWCI
- 46.33
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.