Big decisions, big risks. Improving accountability in mega projects
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Table 1 identifies all the issues involved with public sector projects after investigating various projects/samples from Bangladesh, Denmark, Germany, Hong Kong, India, Malaysia, Myanmar, Nigeria, the Netherlands, the OECD, Pakistan, the Philippines, Singapore, South Korea, Sri Lanka, Taiwan, Thailand, and Vietnam [9,27,34-41].”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [35]
In the citing paper
“A lack of transparency is one of the main reasons for delaying public sector infrastructure-related projects in developing countries [35,36,57].”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [35]
Citations
Cites
Cost overruns in public projects
Arditi, D., Akan, G. T., & Gurdamar, S. (1985) · International Journal of Project Management · doi:10.1016/0263-7863(85)90053-5 · Cited by 114
Mandel, B., Gaudry, M. J. I., & Rothengatter, W. (1997) · The Annals of Regional Science · doi:10.1007/s001680050041 · Cited by 72
BRITISH UTILITY REGULATION: THEORY, PRACTICE, AND REFORM
Helm, D. R. (1994) · Oxford Review of Economic Policy · doi:10.1093/oxrep/10.3.17 · Cited by 64
Accuracy of Traffic Forecasts and Cost Estimates on Large Transportation Projects
Skamris, M. K., & Flyvbjerg, B. (1996) · Transportation Research Record Journal of the Transportation Research Board · doi:10.3141/1518-12 · Cited by 41
Methods for Strategic Environmental Assessment of Transport Infrastructure Plans
Gühnemann, A. (2000) · elib (German Aerospace Center) · Cited by 7
Research works printed but not linked: 1
- Arrow, 1970, Uncertainty and the evaluation of public investment decisions, American Economic Review, 60, 364
Cited by
Sorted by citations
What Causes Cost Overrun in Transport Infrastructure Projects?
Flyvbjerg, B., Holm, M. S., & Buhl, S. L. (2004) · Transport Reviews · doi:10.1080/0144164032000080494a · Cited by 649
Denicol, J., Davies, A. C., & Krystallis, I. (2020) · Project Management Journal · doi:10.1177/8756972819896113 · Cited by 284
Maddaloni, F. D., & Davis, K. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.08.011 · Cited by 254
Flexible contracts to cope with uncertainty in public–private partnerships
Cruz, C. O., & Marques, R. C. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.09.006 · Cited by 242
Cost Overruns and Demand Shortfalls in Urban Rail and Other Infrastructure
Flyvbjerg, B. (2007) · Transportation Planning and Technology · doi:10.1080/03081060701207938 · Cited by 211
Fellows, R. F., & Liu, A. M. M. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.668199 · Cited by 204
Giezen, M. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.01.010 · Cited by 189
Maddaloni, F. D., & Davis, K. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.11.003 · Cited by 159
Follmann, A. (2014) · Habitat International · doi:10.1016/j.habitatint.2014.02.007 · Cited by 122
Sovacool, B. K., Rio, D. D. F. D., Herman, K. S., Iskandarova, M., Uratani, J. M., & Griffiths, S. (2024) · Energy & Environmental Science · doi:10.1039/d3ee03270a · Cited by 121
ENTREPRENEURIAL GOVERNANCE: CHALLENGES OF LARGE‐SCALE PROPERTY‐LED URBAN REGENERATION PROJECTS
Taşan‐Kok, T. (2009) · Tijdschrift voor Economische en Sociale Geografie · doi:10.1111/j.1467-9663.2009.00521.x · Cited by 109
Large Infrastructure Projects: A Review of the Quality of Demand Forecasts and Cost Estimations
van Wee, B. (2007) · Environment and Planning B Planning and Design · doi:10.1068/b32110 · Cited by 107
Transparency matters: The concept of organizational transparency in the academic discourse
Wehmeier, S., & Raaz, O. (2012) · Public Relations Inquiry · doi:10.1177/2046147x12448580 · Cited by 105
Challenges of mega construction projects in developing countries
Ezzat Othman, A. A. (2013) · Organization, Technology & Management in Construction: An International Journal · doi:10.5592/otmcj.2013.1.10 · Cited by 105
Locatelli, G., Invernizzi, D. C., & Brookes, N. J. (2017) · Transportation Research Part A Policy and Practice · doi:10.1016/j.tra.2017.01.024 · Cited by 108
Program management organization maturity integrated model for mega construction programs in China
Jia, G., Chen, Y., Xue, X., Chen, J., Cao, J., & Tang, K. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.03.003 · Cited by 96
Financing eco cities and low carbon cities: The case of Shenzhen International Low Carbon City
Zhan, C., & de Jong, M. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.01.097 · Cited by 90
Banerjee, D., Jagadeesh, P., & Pannem, R. M. R. (2021) · Buildings · doi:10.3390/buildings11040172 · Cited by 89
Risk Identification in Megaprojects as a Crucial Phase of Risk Management: A Literature Review
Sánchez-Cazorla, Á., Alfalla-Luque, R., & Diéguez, A. I. I. (2016) · Project Management Journal · doi:10.1177/875697281604700606 · Cited by 83
A realistic look at CO2 emissions, climate change and the role of sustainable chemistry
Rothenberg, G. (2023) · Sustainable Chemistry for Climate Action · doi:10.1016/j.scca.2023.100012 · Cited by 74
Evaluating megaprojects: From the ‘iron triangle’ to network mapping
Lehtonen, M. (2014) · Evaluation · doi:10.1177/1356389014539868 · Cited by 64
Giezen, M., Bertolini, L., & Salet, W. G. M. (2014) · European Planning Studies · doi:10.1080/09654313.2014.916254 · Cited by 63
Owner organization design for mega industrial construction projects
Sun, J., & Zhang, P. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.04.005 · Cited by 63
Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management
Khalfan, M., Azizi, N., Haass, O., Maqsood, T., & Ahmed, I. (2022) · Sustainability · doi:10.3390/su14105791 · Cited by 57
Identifying the antecedents of megaproject crises in China
Wang, A., & Pitsis, T. S. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.05.003 · Cited by 56
Cultural sense-making integration into risk mitigation strategies towards megaproject success
Dyer, R. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.11.005 · Cited by 53
Delivering complex engineering projects: Reexamining organizational control theory
Liu, L., Borman, M., & Gao, J. L. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.10.006 · Cited by 57
Understanding pitfalls in the application of PPPs in transport infrastructure in Portugal
Macário, R., Ribeiro, J. A. M., & Costa, J. D. (2015) · Transport Policy · doi:10.1016/j.tranpol.2015.03.013 · Cited by 51
Keivani, R., & Mattingly, M. (2007) · International Journal of Urban and Regional Research · doi:10.1111/j.1468-2427.2007.00718.x · Cited by 52
Good practices for environmental assessment
Joseph, C., Gunton, T., & Rutherford, M. B. (2015) · Impact Assessment and Project Appraisal · doi:10.1080/14615517.2015.1063811 · Cited by 51
Mega-projects and sustainability in Durban, South Africa: Convergent or divergent agendas?
Hannan, S., & Sutherland, C. (2014) · Habitat International · doi:10.1016/j.habitatint.2014.02.002 · Cited by 50
Risk Management in Megaprojects
Diéguez, A. I. I., Sánchez-Cazorla, Á., & Alfalla-Luque, R. (2014) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2014.03.046 · Cited by 49
Reconciling the Views of Project Success
Davis, K. (2018) · Project Management Journal · doi:10.1177/8756972818786663 · Cited by 46
Cost Underestimation in Public Works Projects: Error or Lie?
Flyvbjerg, B., Holm, M. S., & Buhl, S. L. (2004) · VBN Forskningsportal (Aalborg Universitet) · Cited by 46
Szentes, H., & Eriksson, P. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001081 · Cited by 38
Liu, L., & Napier, Z. (2010) · Construction Management and Economics · doi:10.1080/01446190903431525 · Cited by 44
Reckoning construction cost overruns in building projects through methodological consequences
Devi, A. C., & Kuppuswamy, A. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2019.1683689 · Cited by 46
Collaboration Networks and Bidding Competitiveness in Megaprojects
Lu, Y., Liu, B., & Li, Y. (2021) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000961 · Cited by 42
Governing Large Projects: A Three-Stage Process to Get It Right
Lovallo, D. P., Cristofaro, M., & Flyvbjerg, B. (2023) · Academy of Management Perspectives · doi:10.5465/amp.2021.0129 · Cited by 41
Transport appraisal and Monte Carlo simulation by use of the CBA-DK model
Salling, K. B., & Leleur, S. (2010) · Transport Policy · doi:10.1016/j.tranpol.2010.08.007 · Cited by 41
Cost overruns and delays in infrastructure projects: the case of Stuttgart 21
Steininger, B. I., Groth, M., & Weber, B. L. (2020) · Journal of Property Investment and Finance · doi:10.1108/jpif-11-2019-0144 · Cited by 49
Managing Cost Risks: Toward a Taxonomy of Cost Overrun Factors in Building Construction Projects
Devi, A. C., & Kuppuswamy, A. (2021) · ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering · doi:10.1061/ajrua6.0001132 · Cited by 45
Schöttle, A., & Arroyo, P. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001342 · Cited by 37
Critical factors affecting the performance of large construction projects in developing countries
Santoso, D. S., & Gallage, P. G. M. P. (2019) · Journal of Engineering Design and Technology · doi:10.1108/jedt-05-2019-0130 · Cited by 37
Port Investment: Towards an Integrated Planning of Port Capacity
Dekker, S. (2005) · Data Archiving and Networked Services (DANS) · Cited by 37
Hoseini, E., van Veen, P., Bosch-Rekveldt, M. G. C., & Hertogh, M. J. C. M. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000772 · Cited by 34
Iftikhar, R., Müller, R., & Ahola, T. (2021) · Project Management Journal · doi:10.1177/87569728211015850 · Cited by 34
Mazher, K. M., Chan, A. P. C., Choudhry, R. M., Zahoor, H., Edwards, D. J., Ghaithan, A. M., Mohammed, A., & Aziz, M. (2022) · Sustainability · doi:10.3390/su142114149 · Cited by 33
Liu, L., Wehbe, G. M., & Sisovic, J. (2010) · The Engineering Economist · doi:10.1080/0013791x.2010.502962 · Cited by 33
Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Conceptual Governance Framework
Hussain, O. A. I., Moehler, R., Walsh, S. D. C., & Ahiaga-Dagbui, D. D. (2024) · Buildings · doi:10.3390/buildings14020478 · Cited by 35
Machiels, T., Compernolle, T., & Coppens, T. (2020) · European Planning Studies · doi:10.1080/09654313.2020.1742665 · Cited by 30
van der Heijden, J. (2010) · Canadian Public Administration · doi:10.1111/j.1754-7121.2010.00138.x · Cited by 29
Risk management in a mega-project: the Universal EXPO 2015 case
Locatelli, G., & Mancini, M. (2010) · International Journal of Project Organisation and Management · doi:10.1504/ijpom.2010.035342 · Cited by 29
Pechlaner, H., Thees, H., Manske-Wang, W., & Scuttari, A. (2019) · Service Industries Journal · doi:10.1080/02642069.2019.1623204 · Cited by 33
The construction of urgency discourse around mega-projects: the Israeli case
van Wijk, J., & Fischhendler, I. (2016) · Policy Sciences · doi:10.1007/s11077-016-9262-0 · Cited by 29
Cost and schedule overruns in large hydropower dams: an assessment of projects completed since 2000
Braeckman, J. P., Disselhoff, T., & Kirchherr, J. (2019) · International Journal of Water Resources Development · doi:10.1080/07900627.2019.1568232 · Cited by 29
van der Heijden, J. (2009) · Research Repository (Delft University of Technology) · Cited by 28
Portfolio management: A new direction in public sector strategic management research and practice
Roberts, P., & Edwards, L. H. (2023) · Public Administration Review · doi:10.1111/puar.13633 · Cited by 26
Factors influencing cost over-run in Indian construction projects
Devi, A. C., & Ananthanarayanan, K. (2017) · MATEC Web of Conferences · doi:10.1051/matecconf/201712002023 · Cited by 29
Economic impact assessment of mega infrastructure pipeline projects
Dimitriou, D., Mourmouris, J. C., & Sartzetaki, M. F. (2015) · Applied Economics · doi:10.1080/00036846.2015.1026591 · Cited by 25
Lehtonen, M. (2019) · Ecological Economics · doi:10.1016/j.ecolecon.2019.01.018 · Cited by 25
Taylor, B. D., Kim, E. J., & Gahbauer, J. (2009) · Journal of Planning Education and Research · doi:10.1177/0739456x09344718 · Cited by 24
Oliomogbe, G. O., & Smith, N. J. (2012) · Organization Technology and Management in Construction An International Journal · doi:10.5592/otmcj.2012.3.5 · Cited by 23
Interplay of power and learning in planning processes: A dynamic view
Schmidt‐Thomé, K., & Mäntysalo, R. (2013) · Planning Theory · doi:10.1177/1473095213490302 · Cited by 26
Competitive Precinct Projects: The Five Consistent Criticisms of “Global” Mixed-Use Megaprojects
Harris, M. S. (2017) · Project Management Journal · doi:10.1177/875697281704800607 · Cited by 23
Knotting the net: From ‘design by deception’ to an object oriented politics
Revellino, S., & Mouritsen, J. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.10.006 · Cited by 22
Assessment of Large-Scale Projects Based on CBA
Korytářová, J., & Papežíková, P. (2015) · Procedia Computer Science · doi:10.1016/j.procs.2015.08.602 · Cited by 22
Senesi, C., Javernick‐Will, A. N., & Molenaar, K. R. (2015) · Engineering Management Journal · doi:10.1080/10429247.2015.1035965 · Cited by 22
Cantarelli, C. C., Flyvbjerg, B., van Wee, B., & Molin, E. J. E. (2008) · International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future · doi:10.1109/infra.2008.5439650 · Cited by 24
Liu, N., & Zhou, G. (2022) · International Journal of Strategic Property Management · doi:10.3846/ijspm.2022.17151 · Cited by 21
Cross-sector Analysis of Four Renegotiated Transport PPPs in Portugal
Macário, R., Costa, J. D., & Ribeiro, J. A. M. (2015) · Transport Reviews · doi:10.1080/01441647.2015.1012755 · Cited by 21
Testing the application of participatory MCA: The case of the South Fylde Line
Dean, M., Hickman, R., & Chen, C.-L. (2018) · Transport Policy · doi:10.1016/j.tranpol.2018.10.007 · Cited by 20
Owner-dominated building information modeling and lean construction in a megaproject
Li, M., Ma, Z., & Tang, X. (2019) · Frontiers of Engineering Management · doi:10.1007/s42524-019-0042-3 · Cited by 20
What does it mean for a transitioning urban waterfront to “work” from a sustainability perspective?
Evans, C., Harris, M. S., Taufen, A., Livesley, S. J., & Crommelin, L. (2022) · Journal of Urbanism International Research on Placemaking and Urban Sustainability · doi:10.1080/17549175.2022.2142648 · Cited by 20
On Peanuts and Monkeys: Private Sector Involvement in Australian Building Control
van der Heijden, J. (2010) · Urban Policy and Research · doi:10.1080/08111141003712776 · Cited by 20
Mukhopadhyay, C. (2015) · Progress in Planning · doi:10.1016/j.progress.2015.02.001 · Cited by 20
Tynan, G. R., & Abdulla, A. (2020) · Philosophical Transactions of the Royal Society A Mathematical Physical and Engineering Sciences · doi:10.1098/rsta.2020.0009 · Cited by 19
Aisheh, Y. I. A. (2021) · Sustainability · doi:10.3390/su131910678 · Cited by 19
Addressing ecological connectivity in the development of roads, railways and canals
IUCN World Commission on Protected Areas (WCPA), C. C. S. G., Ament, R., Clevenger, A. P., & van der Ree, R. (2023) · doi:10.53847/iucn.ch.2023.patrs.5.en · Cited by 19
Reducing risks in megaprojects: The potential of reference class forecasting
Bärenbold, R. (2023) · Project Leadership and Society · doi:10.1016/j.plas.2023.100103 · Cited by 24
Iftikhar, R., & Sergeeva, N. (2024) · International Journal of Project Management · doi:10.1016/j.ijproman.2024.102593 · Cited by 22
A Leap from Negative to Positive Bond. A Step towards Project Sustainability
Maddaloni, F. D., & Derakhshan, R. (2019) · Administrative Sciences · doi:10.3390/admsci9020041 · Cited by 16
Renegotiating Public-Private PartnershipsPreprint
Sarmento, J. M., & Renneboog, L. D. R. (2016) · SSRN Electronic Journal · doi:10.2139/ssrn.2737858 · Cited by 18
Understanding the critical success factors for delivery of megaprojects in Colombia
Cepeda, D. M., Sohail, M., & Ogunlowo, O. O. (2017) · Proceedings of the Institution of Civil Engineers - Management Procurement and Law · doi:10.1680/jmapl.17.00005 · Cited by 17
Cantarelli, C. C., Chorus, C. G., & Cunningham, S. W. (2011) · Transportmetrica A Transport Science · doi:10.1080/18128602.2011.565817 · Cited by 16
Boveldt, G. T., Raemdonck, K. V., & Macharis, C. (2018) · Transport Policy · doi:10.1016/j.tranpol.2018.03.002 · Cited by 16
Risk factor prioritization in infrastructure handover to operations
Rodrigues, T. D. A., Ojiako, U., Marshall, A. J., Mota, C. M. D. M., Dweiri, F. T., Chipulu, M., Ika, L. A., & AlRaeesi, E. J. H. (2023) · International Journal of Project Management · doi:10.1016/j.ijproman.2023.102558 · Cited by 15
Latent geotechnical pathogens inducing cost overruns in highway projects
Amadi, A. I., & Higham, A. P. (2017) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-03-2017-0008 · Cited by 15
Othman, A. A. E. (2014) · The Journal of Engineering Research [TJER] · Cited by 15
Amandin, M. M., & Kule, J. W. (2016) · ABC Journal of Advanced Research · doi:10.18034/abcjar.v5i1.819 · Cited by 14
Yun, J., Ryu, K. R., & Ham, S. P. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.104007 · Cited by 13
An Ex-Ante Method to Verify Commercial U.S. Nuclear Power Plant Decommissioning Cost Estimates
Lordan-Perret, R., Bärenbold, R., Weigt, H., & Rosner, R. (2022) · Energy Economics · doi:10.1016/j.eneco.2023.107023 · Cited by 14
The Four Coordination Roles of Clients When Designing Megaproject Organizations
Zani, C. M., Denicol, J., & Broyd, T. (2024) · Project Management Journal · doi:10.1177/87569728241248033 · Cited by 17
VULNERABILITY ASSESSMENT OF CIVIL INFRASTRUCTURE SYSTEMS: A NETWORK APPROACH
Moselhi, O., Hammad, A., Alkass, S. T., Debbabi, M., & Haider, M. Z. (2005) · Cited by 13
Leung, M., Wei, X., & Wang, C. (2023) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12990 · Cited by 12
Towards Local Sustainability of Mega Infrastructure: Reviewing Research on the New Silk Road
Thees, H. (2020) · Sustainability · doi:10.3390/su122410612 · Cited by 14
Cost overruns on the Norwegian continental shelf: The element of surprise
Lorentzen, S., Øglend, A., & Osmundsen, P. (2017) · Energy · doi:10.1016/j.energy.2017.05.106 · Cited by 12
Fernando, N. G., Kasun Dilshan, T. A., & Zhang, H. (2023) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-09-2022-0048 · Cited by 12
Misuraca, P. (2014) · Cited by 12
Hübscher, M., & Ringel, J. (2021) · Urban Science · doi:10.3390/urbansci5010032 · Cited by 12
Metadata
- Authors
- Bruzelius, N., Flyvbjerg, B., & Rothengatter, W.
- Affiliations
- Lund University (SE)
- Aalborg University (DK)
- Karlsruhe Institute of Technology (DE)
- Corresponding author
- Rothengatter, Werner
- Venue
- Transport Policy
- Publisher
- Elsevier BV
- Published
- 2002-04
- Volume
- 9
- Issue
- 2
- Pages
- 143-154
- ISSN
- 0967-070X (ISSN-L)
- OpenAlex
- W1997655726
- Cited by
- 220
- References
- 6
- Citations by year
- 2026: 7 · 2025: 11 · 2024: 12 · 2023: 15 · 2022: 11 · 2021: 13 · 2020: 16 · 2019: 14 · 2018: 9 · 2017: 15 · 2016: 8 · 2015: 12 · 2014: 12 · 2013: 6 · 2012: 8
- FWCI
- 17.06
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Transport Policy (publishedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public-Private Partnership Projects
- Social Sciences › Transportation › Railways and European Transport Policy
- Social Sciences › Transportation › Transport and Economic Policies
- Keywords
- megaprojects, accountability, infrastructure investment, project risk, decision-making, transparency, performance specifications, regulatory regimes, risk capital, magnetic levitation, project failure, Denmark, Germany
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review