Cost overruns in road construction—what are their sizes and determinants?
The DOI matches its Crossref record; 5 of the 5 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Underestimating Costs in Public Works Projects:Error or Lie?
Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002) · Journal of the American Planning Association · doi:10.1080/01944360208976273 · Cited by 1,046
Theory of econometrics;: An introductory exposition of econometric methods
Koutsoyiannis, A. (1973) · Andalas University Repository (Andalas University) · Cited by 282
Ethics and Advocacy in Forecasting for Public Policy
Wachs, M., & Public Interest Enterprises, I. (1990) · Business and Professional Ethics Journal · doi:10.5840/bpej199091/215 · Cited by 201
THE PERFORMANCE AND IMPACT OF RAIL MASS TRANSIT IN DEVELOPING COUNTRIES
Fouracre, P. R., Allport, R. J., & Thomson, J. M. (1990) · Publication of: Transport and Road Research Laboratory · Cited by 71
Accuracy of Traffic Forecasts and Cost Estimates on Large Transportation Projects
Skamris, M. K., & Flyvbjerg, B. (1996) · Transportation Research Record Journal of the Transportation Research Board · doi:10.3141/1518-12 · Cited by 41
Cited by
The urgency of the development of CO 2 capture from ambient air
Lackner, K. S., Brennan, S., Matter, J. M., Park, A.-H. A., Wright, A., & van der Zwaan, B. (2012) · Proceedings of the National Academy of Sciences · doi:10.1073/pnas.1108765109 · Cited by 449
Analysis of cost and schedule performance of international development projects
Ahsan, K., & Gunawan, I. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.03.005 · Cited by 375
Cantarelli, C. C., Flyvbjerg, B., Molin, E. J. E., & Wee, B. V. (2010) · European Journal of Transport and Infrastructure Research · doi:10.18757/ejtir.2010.10.1.2864 · Cited by 251
“A more recent study on cost overruns by Odeck (2004) uses statistical analysis to derive the average cost overruns and to identify the factors that influence cost overruns.”
BackgroundFlexible contracts to cope with uncertainty in public–private partnerships
Cruz, C. O., & Marques, R. C. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.09.006 · Cited by 242
Cost overrun in the Malaysian construction industry projects: A deeper insight
Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.04.004 · Cited by 210
Different cost performance: different determinants?
Cantarelli, C. C., van Wee, B., Molin, E. J. E., & Flyvbjerg, B. (2012) · Transport Policy · doi:10.1016/j.tranpol.2012.04.002 · Cited by 179
Determining the Probability of Project Cost Overruns
Love, P. E. D., Wang, X., Sing, C.-P., & Tiong, R. L. K. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000575 · Cited by 169
Love, P. E. D., Ahiaga-Dagbui, D. D., & Irani, Z. (2016) · Transportation Research Part A: Policy and Practice · doi:10.1016/j.tra.2016.08.007 · Cited by 138
“Reported cost overruns have been found to vary significantly between studies in various countries ranging, for example, from -11 to 106% (Pickrell, 1990), -59% to 183% (Odeck, 2004), and -12% and 70% (Love et al ., 2014).”
InfluentialThe cost performance and causes of overruns in infrastructure development projects in Asia
Andrić, J. M., Mahamadu, A.-M., Wang, J., Zou, P. X. W., & Zhong, R. (2019) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2019.8646 · Cited by 61
“The current literature indicates that cost overruns have occurred in a significant number of infrastructure projects, such as Norwegian roadway projects (Odeck, 2004), road projects in the USA (Ellis, Pyeon, Herbsman, Minchin, & Molenaar, 2007), transport projects in Slovenia (Makovšek, Tominc, & Logožar, 2012), highw…”
Background
Metadata
- Authors
- Odeck, J.
- Venue
- Transport Policy
- Publisher
- Elsevier BV
- Published
- 2004-01
- Volume
- 11
- Issue
- 1
- Pages
- 43-53
- ISSN
- 0967-070X (ISSN-L)
- OpenAlex
- W2058827904
- Cited by
- 385
- References
- 5
- FWCI
- 3.86
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.