The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Analysis of cost and schedule performance of international development projects
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00055-8 · Cited by 796
Project Management: Strategic Design and Implementation
Cleland, D. I. (1990) · Cited by 721
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997) · Construction Management and Economics · doi:10.1080/014461997373132 · Cited by 698
Cost escalation and schedule delays in road construction projects in Zambia
Kaliba, C., Muya, M., & Mumba, K. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.07.003 · Cited by 596
Turner, J. R., & Cochrane, R. A. (1993) · International Journal of Project Management · doi:10.1016/0263-7863(93)90017-h · Cited by 529
Causes of delay and cost overruns in Nigerian construction projects
Mansfield, N., Ugwu, O., & Doran, T. (1994) · International Journal of Project Management · doi:10.1016/0263-7863(94)90050-7 · Cited by 457
What Causes Cost Overrun in Transport Infrastructure Projects?
FLYVBJERG, B., SKAMRIS HOLM, M. K., & BUHL, S. L. (2004) · Transport Reviews · doi:10.1080/0144164032000080494a · Cited by 455
Success Criteria and Factors for International Development Projects: A Life-Cycle-Based Framework
Khang, D. B., & Moe, T. L. (2008) · Project Management Journal · doi:10.1002/pmj.20034 · Cited by 394
Cost overruns in road construction—what are their sizes and determinants?
Odeck, J. (2004) · Transport Policy · doi:10.1016/s0967-070x(03)00017-9 · Cited by 385
Crawford, P., & Bryce, P. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00060-1 · Cited by 347
Cited by
Analysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745
Critical success factors for World Bank projects: An empirical investigation
Ika, L. A., Diallo, A., & Thuillier, D. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.03.005 · Cited by 448
Park, Y., & Papadopoulou, T. C. (2012) · Built Environment Project and Asset Management · doi:10.1108/20441241211280873 · Cited by 91
The cost performance and causes of overruns in infrastructure development projects in Asia
Andrić, J. M., Mahamadu, A.-M., Wang, J., Zou, P. X. W., & Zhong, R. (2019) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2019.8646 · Cited by 61
Construction delays in privately funded large building projects in Bangladesh
Islam, M. S., & Suhariadi, B. T. (2018) · Asian Journal of Civil Engineering · doi:10.1007/s42107-018-0034-3 · Cited by 44
Metadata
- Authors
- Ahsan, K., & Gunawan, I.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2010-01
- Volume
- 28
- Issue
- 1
- Pages
- 68-78
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2090595148
- Cited by
- 375
- References
- 25
- FWCI
- 14.88
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Analysis of cost and schedule performance of international development projects. https://app.cochat.ai/papers/10.1016/j.ijproman.2009.03.005
- The paper
- Ahsan, K., & Gunawan, I. (2010). Analysis of cost and schedule performance of international development projects. International Journal of Project Management. https://doi.org/10.1016/j.ijproman.2009.03.005
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.