Risk and risk management in construction: a review and future directions for research
The DOI matches its Crossref record; 28 of the 28 references it cites were found in a registry or an index.
Abstract
The literature on construction and project risk management published during the period from 1960 to 1997 is reviewed and analysed to identify trends and foci in research and practice. This analysis is used to identify gaps and inconsistencies in the knowledge and treatment of construction and project risk. The findings suggested that political, economic, financial and cultural categories of construction risk deserve greater research attention, as do those associated with quality assurance, and occupational health and safety. Temporal aspects of risk, and risk communication, are also important fields for investigation.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Soft Systems Methodology in Action
Gough, T. G. (1991) · Journal of the Operational Research Society · doi:10.1057/jors.1991.157 · Cited by 3,414
Journal of Construction Engineering and Management
de la Garza, J., Jahren, C. T., Jaselskis, E. J., Rowings, J. E., & Harris, R. B. (1983) · Cited by 969
Soft Systems Methodology in Action
Rosenhead, J. (1991) · European Journal of Information Systems · doi:10.1057/ejis.1991.37 · Cited by 958
Risk Management and Construction
Flanagan, R. (1993) · Medical Entomology and Zoology · Cited by 910
(2018) · Project Management Journal · doi:10.1002/(issn)1938-9507 · Cited by 834
Risk analysis and management in construction
Akintoye, A. S., & MacLeod, M. J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00035-x · Cited by 755
Project Risk Management: Processes, Techniques and Insights
Smith, J. U. M. (1998) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600022 · Cited by 555
Bidding Strategies and Probabilities
Gates, M. (1967) · Journal of the Construction Division · doi:10.1061/jcceaz.0000192 · Cited by 262
Construction risk assessment by linguistics
Kangari, R., & Riggs, L. S. (1989) · IEEE Transactions on Engineering Management · doi:10.1109/17.18829 · Cited by 246
Behavior-based safety management in Hong Kong's construction industry
Lingard, H., & Rowlinson, S. (1997) · Journal of Safety Research · doi:10.1016/s0022-4375(97)00010-8 · Cited by 188
Cited by
A fuzzy approach to construction project risk assessment
Nieto-Morote, A., & Ruz-Vila, F. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.002 · Cited by 464
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Rowlinson, S., YunyanJia, A., Li, B., & ChuanjingJu, C. (2014) · Accident Analysis & Prevention · doi:10.1016/j.aap.2013.08.011 · Cited by 176
Metadata
- Authors
- Edwards, P. J., & Bowen, P. A.
- Venue
- Engineering Construction and Architectural Management
- Publisher
- Emerald
- Published
- 1998-12
- Volume
- 5
- Issue
- 4
- Pages
- 339-349
- ISSN
- 0969-9988 (ISSN-L)
- 1365-232X
- OpenAlex
- W2004576484
- Cited by
- 160
- References
- 28
- FWCI
- 1.79
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Risk and risk management in construction: a review and future directions for research. https://app.cochat.ai/papers/10.1046/j.1365-232x.1998.54072.x
- The paper
- Edwards, P. J., & Bowen, P. A. (1998). Risk and risk management in construction: a review and future directions for research. Engineering Construction and Architectural Management. https://doi.org/10.1046/j.1365-232x.1998.54072.x
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.