Systematic Risk Management Approach for Construction Projects
The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Abstract
Risk is inherently present in all construction projects. Quite often, construction projects fail to achieve their time, quality, and budget goals. A risk model entitled construction risk management system (CRMS) is introduced to help contractors identify project risks and systematically to analyze and manage them. The CRMS model is a logical substitute for the traditional intuitive unsystematic approach currently used by most contractors. The influence diagramming technique and Monte Carlo simulation are used as tools to analyze and evaluate project risks. Alternative risk management strategies are suggested. Such strategies include: risk avoidance, risk transfer, risk retention, loss reduction, and risk prevention and insurance.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Readings on the Principles and Applications of Decision Analysis
Howard, R. A., & Matheson, J. E. (1989) · Cited by 685
Risk Analysis and Its Applications
Carter, H. (1984) · Journal of the Operational Research Society · doi:10.1057/jors.1984.90 · Cited by 219
Assessment and evaluation of subjective probability distributions
von Holstein, S., & Carl-Axel, S. (1970) · Medical Entomology and Zoology · Cited by 131
Causes of Delay in the Construction Industry
Baldwin, J. R., Manthei, J. M., Rothbart, H. A., & Harris, R. B. (1971) · Journal of the Construction Division · doi:10.1061/jcceaz.0000305 · Cited by 118
METHODS FOR QUANTIFYING SUBJECTIVE PROBABILITIES AND MULTI‐ATTRIBUTE UTILITIES*†
Huber, G. P. (1974) · Decision Sciences · doi:10.1111/j.1540-5915.1974.tb00630.x · Cited by 117
Development of Automated Aids for Decision Analysis
Miller, A. C., III, M., Miley W., H., Ronald A., M., James E., R., & Thomas, R. (1976) · doi:10.21236/ada026379 · Cited by 73
Measurement of subjective probability
von Holstein, C.-A. S. S. (1970) · Acta Psychologica · doi:10.1016/0001-6918(70)90013-2 · Cited by 69
Cited by
The allocation of risk in PPP/PFI construction projects in the UK
Bing, L., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.04.006 · Cited by 901
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Identifying and assessing critical risk factors for BIM projects: Empirical study
Chien, K.-F., Wu, Z.-H., & Huang, S.-C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.012 · Cited by 317
ICRAM-1: Model for International Construction Risk Assessment
Hastak, M., & Shaked, A. (2000) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2000)16:1(59 · Cited by 285
A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects
Zhao, X., Hwang, B.-G., & Gao, Y. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.11.042 · Cited by 279
Metadata
- Authors
- Al‐Bahar, J. F., & Crandall, K. C.
- Venue
- Journal of Construction Engineering and Management
- Published
- 1990-09
- Volume
- 116
- Issue
- 3
- Pages
- 533-546
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(1990)116:3(533
- OpenAlex
- W2040629268
- Cited by
- 414
- References
- 7
- FWCI
- 0.56
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.