Risk Assessment Methodology for Underground Construction Projects
The DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.
Abstract
This paper presents a risk assessment methodology for underground construction projects. A formalized procedure and associated tools were developed to assess and manage the risks involved in underground construction. The suggested risk assessment procedure is composed of four steps of identifying, analyzing, evaluating, and managing the risks inherent in construction projects. The main tool of the proposed risk assessment methodology is the risk analysis software. The risk analysis software is built upon an uncertainty model based on fuzzy concept. The fuzzy-based uncertainty model is designed to consider the uncertainty range that represents the degree of uncertainties involved in both (1) probabilistic parameter estimates and (2) subjective judgments. Other tools developed in this study include the survey sheets for collecting risk-related information and the detail check sheets for risk identification and analysis. The paper finally discusses a detailed case study of the developed risk assessment methodology performed for a subway construction project in Korea.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,857
Watson, S. R., Weiss, J. J., & Donnell, M. L. (1979) · IEEE Transactions on Systems Man and Cybernetics · doi:10.1109/tsmc.1979.4310067 · Cited by 265
The nature of structural design and safety
Blockley, D. (1981) · Journal of Constructional Steel Research · doi:10.1016/0143-974x(81)90032-8 · Cited by 251
Political Risks in International Construction
Ashley, D. B., & Bonner, J. J. (1987) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1987)113:3(447 · Cited by 137
A risk assessment methodology for incorporating uncertainties using fuzzy concepts
Cho, H.-N., Choi, H., & Kim, Y.-B. (2002) · Reliability Engineering & System Safety · doi:10.1016/s0951-8320(02)00158-8 · Cited by 111
Self-citation
Cited by
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Using fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, I., Birgonul, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 374
Cyber security risk assessment for SCADA and DCS networks
Ralston, P. A. S., Graham, J. H., & Hieb, J. L. (2007) · ISA Transactions · doi:10.1016/j.isatra.2007.04.003 · Cited by 267
Risk assessment model selection in construction industry
KarimiAzari, A., Mousavi, N., Mousavi, S. F., & Hosseini, S. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.12.110 · Cited by 232
“Choi, Cho, and Seo (2004) presents fuzzy risk assessment methodology for underground construction projects.”
BackgroundOverview of the Application of “Fuzzy Techniques” in Construction Management Research
Chan, A. P. C., Chan, D. W. M., & Yeung, J. F. Y. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000099 · Cited by 178
Metadata
- Authors
- Choi, H.-H., Cho, H.-N., & Seo, J. W.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2004-04
- Volume
- 130
- Issue
- 2
- Pages
- 258-272
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2004)130:2(258
- OpenAlex
- W2145292327
- Cited by
- 178
- References
- 6
- FWCI
- 3.67
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.