Neural Network Modeling of Highway Construction Costs
The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
The objective of this research was to develop a procedure that estimates the escalation of highway construction costs over time. An artificial neural network model was developed which relates overall highway construction costs, described in terms of a highway construction cost index, to the cost of construction material, labor, and equipment, the characteristics of the contract and the contracting environment prevailing at the time the contract was let. Results demonstrate that the model is able to replicate past highway construction cost trends in Louisiana with reasonable accuracy. Future construction input costs are estimated from commercially available forecasts of indicator variables closely associated with the price of construction labor, construction equipment, and a representative set of highway construction materials. Future contract characteristics and the contracting environment that is likely to exist in the future are estimated from past trends or stipulated to be consistent with policy decisions in the future. The predictions produced by the model estimate that highway construction costs in Louisiana will double between 1998 and 2015.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Neural Network Model for Parametric Cost Estimation of Highway Projects
Hegazy, T., & Ayed, A. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:3(210 · Cited by 388
Forecasting construction cost escalation
Blair, A. N., Lye, L. M., & Campbell, W. J. (1993) · Canadian Journal of Civil Engineering · doi:10.1139/l93-077 · Cited by 27
Cited by
Rafiei, M. H., & Adeli, H. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001570 · Cited by 269
Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review
Elmousalami, H. H. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001678 · Cited by 229
Tayefeh Hashemi, S., Ebadati, O. M., & Kaur, H. (2020) · SN Applied Sciences · doi:10.1007/s42452-020-03497-1 · Cited by 209
Estimation of the Escalation Factor in Construction Projects Using Value at Risk
Joukar, A., & Nahmens, I. (2016) · Construction Research Congress 2016 · doi:10.1061/9780784479827.234 · Cited by 6
Metadata
- Authors
- Wilmot, C. G., & Mei, B.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2005-07
- Volume
- 131
- Issue
- 7
- Pages
- 765-771
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2005)131:7(765
- OpenAlex
- W2087122156
- Cited by
- 188
- References
- 2
- FWCI
- 2.09
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.