CoChat

Evaluation of project success: a structured literature review

Albert, Matthias, Balve, Patrick, Spang, Konrad · 2017 · International Journal of Managing Projects in Business
Cited by 166

The DOI matches its Crossref record; 84 of the 84 references it cites were found in a registry or an index.

Abstract

Purpose: Barnes’ Iron Triangle was one of the first attempts to evaluate project success based on time, cost and performance, which were portrayed as interdependent dimensions. Over time, these criteria were expanded and especially criteria taking the satisfaction of stakeholder groups into account are becoming more and more popular. The purpose of this paper is to find out whether specific patterns for the selection of project success criteria across various fields of applications emerged which has not been regarded in literature before. Furthermore, the authors seek to identify of additional key factors influencing project success assessment next to the choice of project success criteria. Design/methodology/approach: The paper uses a review of recent literature published in academic journals, in standard references and in widespread project management frameworks (Organisational Competence Baseline, PRINCE2 and PMBoK Guide). Findings: The findings show that Barnes’ ideas are an integral part of all approaches investigated in the study. Additionally, the relevance of the so-called “soft criteria” related to the satisfaction of stakeholder groups, could be substantiated. However, the authors found no indications that patterns for the selection of project success criteria have emerged across various fields of applications. Factors influencing project success assessment are not taken into account in the examined articles in a systematic manner. This motivates for further research in this field. Research limitations/implications: Access limitations, papers not yet digitally available or the interpretations have an impact on the results. Practical implications: For appropriate project assessment the sound and well-rounded selection of hard and soft criteria and the consideration that not the field of application, but influencing factors yet to be analysed influence the selection of project success criteria are crucial. Project management professionals should choose the criteria suitable for their projects individually on a project-by-project basis. Originality/value: This paper reveals that no patterns have so far been developed to assess project success in various fields of application. Furthermore, factors influencing project success assessment are not considered in a systematic manner.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1108/ijmpb-01-2017-0004

Cites

84 of 84 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 84 references

Cited by

See all 166

Metadata

Authors
Albert, M., Balve, P., & Spang, K.
Venue
International Journal of Managing Projects in Business
Publisher
Emerald
Published
2017-09-05
Volume
10
Issue
4
Pages
796-821
ISSN
1753-8378 (ISSN-L)
OpenAlex
W2737976786
Cited by
166
References
84
FWCI
7.50
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Evaluation of project success: a structured literature review. https://app.cochat.ai/papers/10.1108/ijmpb-01-2017-0004
The paper
Albert, M., Balve, P., & Spang, K. (2017). Evaluation of project success: a structured literature review. International Journal of Managing Projects in Business. https://doi.org/10.1108/ijmpb-01-2017-0004

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.