ICRAM-1: Model for International Construction Risk Assessment
The DOI matches its Crossref record; 15 of the 15 references it cites were found in a registry or an index.
Abstract
This paper presents a risk assessment model for international construction projects. The International Construction Risk Assessment Model (ICRAM-1) assists the user in evaluating the potential risk involved in expanding operations in an international market by analyzing risk at the macro (or country environment), market, and project levels. The paper discusses some of the existing models for country risk assessment, presents potential risk indicators at the macro, market, and project levels, and explains the ICRAM-1 methodology through an applied example. The ICRAM-1 provides a structured approach for evaluating the risk indicators involved in an international construction operation and is designed to examine a specific project in a foreign country. It can be used as a tool to quantify the risk involved in an international construction investment as one of the preliminary steps in project evaluation. Four main results are obtained from the ICRAM-1 analysis: (1) High-risk indicators; (2) impact of country environment on a specific project; (3) impact of market environment on a specific project; and (4) overall project risk.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Analytic Hierarchy Process
SAATY, T. L., & KEARNS, K. P. (1985) · Analytical Planning · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,357
How to Make a Decision: The Analytic Hierarchy Process
Saaty, T. L. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90057-i · Cited by 9,605
Saaty, T. L. (1985) · IEEE Transactions on Systems Man and Cybernetics · doi:10.1109/tsmc.1985.6313384 · Cited by 1,344
An overview of the analytic hierarchy process and its applications
Vargas, L. G. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90056-h · Cited by 1,290
Risk Management and Construction
Flanagan, R. (1993) · Medical Entomology and Zoology · Cited by 910
Loudenback, L. J. (1984) · Industrial Marketing Management · doi:10.1016/0019-8501(84)90013-0 · Cited by 475
Systematic Risk Management Approach for Construction Projects
Al‐Bahar, J. F., & Crandall, K. C. (1990) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1990)116:3(533 · Cited by 414
Risk Management Perceptions and Trends of U.S. Construction
Kangari, R. (1995) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1995)121:4(422 · Cited by 203
Human Resources Management in International Joint Ventures: Directions for Research
Shenkar, O., & Zeira, Y. (1987) · The Academy of Management Review · doi:10.2307/258520 · Cited by 176
Factors Affecting Contractors' Risk of Cost Overburden
Akinci, B., & Fischer, M. A. (1998) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(1998)14:1(67 · Cited by 155
Decision‐Support System for Modeling Bid/No‐Bid Decision Problem
Ahmad, I. U. (1990) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1990)116:4(595 · Cited by 138
Political Risks in International Construction
Ashley, D. B., & Bonner, J. J. (1987) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1987)113:3(447 · Cited by 137
Advanced automation or conventional construction process?
Hastak, M. (1998) · Automation in Construction · doi:10.1016/s0926-5805(98)00047-8 · Cited by 67
Self-citationPolitical assessment by international firms: Models or methodologies?
Kobrin, S. J. (1981) · Journal of Policy Modeling · doi:10.1016/0161-8938(81)90030-2 · Cited by 48
Human resources systems in an international alliance: The undoing of a done deal?
Cascio, W. E., & Serapio, M. G. (1991) · Organizational Dynamics · doi:10.1016/0090-2616(91)90094-p · Cited by 36
Cited by
Preferred risk allocation in China’s public–private partnership (PPP) projects
Ke, Y., Wang, S., Chan, A. P. C., & Lam, P. T. I. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.08.007 · Cited by 449
Risk management framework for construction projects in developing countries
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004) · Construction Management and Economics · doi:10.1080/0144619032000124689 · Cited by 445
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Using fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, I., Birgonul, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 374
Factors Affecting International Construction
Gunhan, S., & Arditi, D. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:3(273 · Cited by 239
Metadata
- Authors
- Hastak, M., & Shaked, A.
- Venue
- Journal of Management in Engineering
- Published
- 2000-01
- Volume
- 16
- Issue
- 1
- Pages
- 59-69
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- DOI
- 10.1061/(asce)0742-597x(2000)16:1(59
- OpenAlex
- W2085974941
- Cited by
- 285
- References
- 15
- FWCI
- 3.51
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.