Overview of the Application of “Fuzzy Techniques” in Construction Management Research
The DOI matches its Crossref record; 38 of the 38 references it cites were found in a registry or an index.
Abstract
During the last decade, “fuzzy techniques” have been increasingly applied to the research area of construction management discipline. To date, however, no paper has attempted to summarize and present a critique of the existing “fuzzy” literature. This paper, therefore, aims to comprehensively review the fuzzy literature that has been published in eight selected top quality journals from 1996 to 2005, these being Journal of Construction Engineering and Management, ASCE; Journal of Management in Engineering, ASCE; Construction Management and Economics; Engineering, Construction and Architectural Management; International Journal of Project Management; Building Research and Information; Building and Environment; and Benchmarking: An International Journal. It has been found that fuzzy research, as applied in construction management discipline in the past decade, can be divided into two broad fields, encompassing: (1) fuzzy set/fuzzy logic; and (2) hybrid fuzzy techniques, with the applications in four main categories, including: (1) decision making; (2) performance; (3) evaluation/assessment; and (4) modeling. The comprehensive review provided in this paper offers new directions for fuzzy research and its application in construction management. Based on a comprehensive literature review on the applications of fuzzy set/fuzzy logic, and hybrid fuzzy techniques in construction management research, an increasing trend of applying these techniques in construction management research is observed. Therefore, it is suggested that future research studies related to fuzzy techniques can be continuously applied to these four major categories. Fuzzy membership functions and linguistic variables in particular can be used to suit applications to solving problems encountered in the construction industry based on the nature of construction, which are widely regarded as complicated, full of uncertainties, and contingent on changing environments. Moreover, hybrid fuzzy techniques, such as neurofuzzy and fuzzy neural networks, can be more widely applied because they can better tackle some problems in construction that fuzzy set/fuzzy logic alone may not best suit. For example, neural networks are strong in pattern recognition and automatic learning while fuzzy set and fuzzy logic are strong in modeling certain uncertainties. Their combination can assist in developing models with uncertainty under some forms of pattern. Finally, an increasing trend of applying fuzzy techniques in the building science and environmental disciplines is also observed; it is believed that the application of fuzzy techniques will go beyond the construction management area into these disciplines as well.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,857
(2000) · Cited by 9,198
Fuzzy Set Theory—and Its Applications
Zimmermann, H.-J. (2001) · Springer eBooks · doi:10.1007/978-94-010-0646-0 · Cited by 7,526
Meta-analysis in social research
(1982) · Evaluation and Program Planning · doi:10.1016/0149-7189(82)90011-8 · Cited by 3,853 · cited 1×
“The essential character of metaanalysis is that it is the statistical analysis of the summary findings of many empirical studies Glass et al. 1981 .”
MethodResearch methods for construction
Fellowa, R., & Liu, A. M. M. (2003) · Cited by 1,448
Fuzzy MCDM approach for planning and design tenders selection in public office buildings
Hsieh, T.-Y., Lu, S.-T., & Tzeng, G.-H. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.01.002 · Cited by 694 · cited 1×
“Hsieh et al. 2004 adopted a fuzzy multicriteria analysis approach to select planning and design alternatives in public office buildings.”
MethodModelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 587
Research Methods for Construction (3rd ed.)
Fellows, R., & Liu, A. (2008) · Wiley-Blackwell eBooks · Cited by 510
A proposal for construction project risk assessment using fuzzy logic
Tah, J. H. M., & Carr, V. (2000) · Construction Management and Economics · doi:10.1080/01446190050024905 · Cited by 374
Cited by
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Pärn, E., & Edwards, D. J. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 721
Self-citationAMEYAW, E. E., HU, Y., SHAN, M., CHAN, A. P. C., & LE, Y. (2016) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/13923730.2014.945953 · Cited by 307
Self-citationHe, Q., Luo, L., Hu, Y., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.009 · Cited by 243
“Therefore, measuring qualitative factors by using fuzzy numbers helps in speeding up decision making processes and in obtaining highly realistic results (Chan et al., 2009).”
BackgroundSelf-citationAfzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Islam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163
Data mining in the construction industry: Present status, opportunities, and future trends
Yan, H., Yang, N., Peng, Y., & Ren, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103331 · Cited by 161
Metadata
- Authors
- Chan, A. P. C., Chan, D. W. M., & Yeung, J. F. Y.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2009-11
- Volume
- 135
- Issue
- 11
- Pages
- 1241-1252
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2019613054
- Cited by
- 178
- References
- 38
- FWCI
- 6.77
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.