Overview of the Application of “Fuzzy Techniques” in Construction Management Research
The DOI matches its Crossref record; 38 of the 38 references it cites were found in a registry or an index.
Abstract
During the last decade, “fuzzy techniques” have been increasingly applied to the research area of construction management discipline. To date, however, no paper has attempted to summarize and present a critique of the existing “fuzzy” literature. This paper, therefore, aims to comprehensively review the fuzzy literature that has been published in eight selected top quality journals from 1996 to 2005, these being Journal of Construction Engineering and Management, ASCE; Journal of Management in Engineering, ASCE; Construction Management and Economics; Engineering, Construction and Architectural Management; International Journal of Project Management; Building Research and Information; Building and Environment; and Benchmarking: An International Journal. It has been found that fuzzy research, as applied in construction management discipline in the past decade, can be divided into two broad fields, encompassing: (1) fuzzy set/fuzzy logic; and (2) hybrid fuzzy techniques, with the applications in four main categories, including: (1) decision making; (2) performance; (3) evaluation/assessment; and (4) modeling. The comprehensive review provided in this paper offers new directions for fuzzy research and its application in construction management. Based on a comprehensive literature review on the applications of fuzzy set/fuzzy logic, and hybrid fuzzy techniques in construction management research, an increasing trend of applying these techniques in construction management research is observed. Therefore, it is suggested that future research studies related to fuzzy techniques can be continuously applied to these four major categories. Fuzzy membership functions and linguistic variables in particular can be used to suit applications to solving problems encountered in the construction industry based on the nature of construction, which are widely regarded as complicated, full of uncertainties, and contingent on changing environments. Moreover, hybrid fuzzy techniques, such as neurofuzzy and fuzzy neural networks, can be more widely applied because they can better tackle some problems in construction that fuzzy set/fuzzy logic alone may not best suit. For example, neural networks are strong in pattern recognition and automatic learning while fuzzy set and fuzzy logic are strong in modeling certain uncertainties. Their combination can assist in developing models with uncertainty under some forms of pattern. Finally, an increasing trend of applying fuzzy techniques in the building science and environmental disciplines is also observed; it is believed that the application of fuzzy techniques will go beyond the construction management area into these disciplines as well.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,857
(2000) · Cited by 9,198
Fuzzy Set Theory—and Its Applications
Zimmermann, H.-J. (2001) · Springer eBooks · doi:10.1007/978-94-010-0646-0 · Cited by 7,526
Meta-analysis in social research
(1982) · Evaluation and Program Planning · doi:10.1016/0149-7189(82)90011-8 · Cited by 3,853 · cited 1×
“The essential character of metaanalysis is that it is the statistical analysis of the summary findings of many empirical studies Glass et al. 1981 .”
MethodResearch methods for construction
Fellowa, R., & Liu, A. M. M. (2003) · Cited by 1,448
Fuzzy MCDM approach for planning and design tenders selection in public office buildings
Hsieh, T.-Y., Lu, S.-T., & Tzeng, G.-H. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.01.002 · Cited by 694 · cited 1×
“Hsieh et al. 2004 adopted a fuzzy multicriteria analysis approach to select planning and design alternatives in public office buildings.”
MethodModelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 587
Research Methods for Construction (3rd ed.)
Fellows, R., & Liu, A. (2008) · Wiley-Blackwell eBooks · Cited by 510
A proposal for construction project risk assessment using fuzzy logic
Tah, J. H. M., & Carr, V. (2000) · Construction Management and Economics · doi:10.1080/01446190050024905 · Cited by 374
Which contractor selection methodology?
Holt, G. D. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00035-5 · Cited by 358 · cited 1×
“Holt 1998 pointed out that the need for judicious construction contractor selection is increasing.”
BackgroundMethods and techniques to help quality function deployment (QFD)
Bouchereau, V., & Rowlands, H. (2000) · Benchmarking An International Journal · doi:10.1108/14635770010314891 · Cited by 331 · cited 2×
“Quality function deployment is a management tool that provides a visual connective process to help teams focus on the needs of the customers throughout the total development cycle of a product or process Bouchereau and Rowlands 2000 .”
BackgroundMethodLarge-Scale Systems: Modeling, Control and Fuzzy Logic
Jamshidi, M. (1996) · Cited by 238
Fuzzy sets, fuzzy logic, fuzzy methods with applications
(1997) · Choice Reviews Online · doi:10.5860/choice.34-3907 · Cited by 216 · cited 3×
“…natural language computation; 4 linguistic approximation; 5 fuzzy set arithmetic operations; 6 set operations; and 7 fuzzy weighted average Zimmermann 2001; Bandemer and Gottwald 1995; Baloi and Price 2003; Jamshidi 1997; Grima 2000; Piegat 2001; Ng et al. 2002; Seo et al. 2004; Zheng and Ng 2005 .”
BackgroundThe ranking of construction management journals
Wing, C. K. (1997) · Construction Management and Economics · doi:10.1080/014461997372953 · Cited by 198 · cited 2×
“In fact, with reference to a research study on journal ranking in construction management conducted by Chau 1997 , the first six journals were assessed by respondents to have very high rankings among 22 relevant journal assessed.”
MethodBid/no-bid decision-making – a fuzzy linguistic approach
Lin, C.-T., & Chen, Y.-T. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.01.005 · Cited by 182 · cited 1×
“Lin and Chen 2004 studied bid/no-bid decision making and stated that they were associated with uncertainty and complexity.”
BackgroundA GA-based fuzzy optimal model for construction time–cost trade-off
Leu, S.-S., Chen, A.-T., & Yang, C.-H. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00035-6 · Cited by 181 · cited 1×
“Leu et al. 2001 proposed a new optimal construction time-cost trade-off model in which the effects of both uncertain activity duration and time-cost trade-off were taken into consideration.”
BackgroundRisk Assessment Methodology for Underground Construction Projects
Choi, H.-H., Cho, H.-N., & Seo, J. W. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:2(258 · Cited by 178
A comprehensive framework for selecting an ERP system
Wei, C.-C., & Wang, M.-J. J. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00064-9 · Cited by 176 · cited 1×
“Wong et al. 2000 explained that by incorporating fuzzy analysis into multiattribute utility theory, project selection problems can be dealt with when some project attributes are subject to random variations.”
BackgroundGermain, R. S. (2006) · Springer eBooks · doi:10.1007/0-306-47044-6_15 · Cited by 150
Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems
Fayek, A. R., & Oduba, A. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:8(938 · Cited by 119
Neuro-fuzzy modeling in engineering geology
Grima, M. A. (2000) · Cited by 105
An energy-efficient controller for shading devices self-adapting to the user wishes
Guillemin, A., & Molteni, S. (2002) · Building and Environment · doi:10.1016/s0360-1323(01)00113-5 · Cited by 98
A fuzzy neural network approach for contractor prequalification
Lam, K. C., Hu, T., Ng, S. T., Skitmore, M., & Cheung, S. O. (2001) · Construction Management and Economics · doi:10.1080/01446190150505108 · Cited by 96
Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front
Zheng, D. X. M., & Ng, S. T. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:2(176 · Cited by 94 · cited 4×
“Zheng and Ng 2005 opined that the duration and cost of each construction activity could change dynamically as a result of many uncertain variables, such as productivity, resource availability, and weather.”
BackgroundInfluentialSite Layout Planning using Nonstructural Fuzzy Decision Support System
Tam, C. M., Tong, T. K. L., Leung, A. W. T., & Chiu, G. W. C. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:3(220 · Cited by 89 · cited 2×
“…neur y sets y analy rchy p y neur lar fuz ith fu SCE; C al of nonpolynomial hard problems, and solutions can only be derived INEERING AND MANAGEMENT © ASCE / NOVEMBER 2009 / 1249 ASCE license or copyright; see http://pubs.asce.org/copyright through repeated trials and errors Tong and Tam 2003 .”
BackgroundMethodNovel approach to multi-functional project team formation
Tseng, T.-L., Huang, C.-C., Chu, H.-W., & Gung, R. R. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00058-9 · Cited by 86 · cited 1×
“Wang et al. 1996 investigated the possibility of developing a knowledge-based system to assist in choosing an appropriate contract strategy for a specific project.”
BackgroundModeling a Contractor’s Markup Estimation
Liu, M., & Ling, F. Y. Y. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:4(391 · Cited by 75
Fuzzy control for the illumination and temperature comfort in a test chamber
Lah, M. T., Zupančič, B., & Krainer, A. (2005) · Building and Environment · doi:10.1016/j.buildenv.2004.11.008 · Cited by 60
Neuro-fuzzy modeling in engineering geology
Rosenbaum, M. S. (2001) · Quarterly Journal of Engineering Geology and Hydrogeology · doi:10.1144/qjegh.34.4.415 · Cited by 57
Quasi-adaptive fuzzy heating control of solar buildings
Gouda, M. M., Danaher, S., & Underwood, C. P. (2005) · Building and Environment · doi:10.1016/j.buildenv.2005.07.008 · Cited by 56 · cited 2×
“…et al. 2001 ; 2 sulfate expansion Inan et al. 2007 ; 3 user acceptance and adaptation Guillemin and Molteni 2002 ; 4 car-parking guidance Leephakpreeda 2007 ; 5 thermal conductivity Singh et al. 2007 ; 6 heating control Gouda et al. 2006 ; and 7 thermal and illumination control Lah et al. 2005 .”
BackgroundMethodAn intelligent risk assessment system for distributed construction teams
Shang, H., Anumba, C. J., Bouchlaghem, D. M., Miles, J. C., Cen, M., & Taylor, M. (2005) · Engineering Construction & Architectural Management · doi:10.1108/09699980510608839 · Cited by 46 · cited 1×
“Shang et al. 2005 developed an innovative risk assessment approach for distributing project teams.”
BackgroundUsing fuzzy neural network approach to estimate contractors’ markup
Liu, M., & Ling, F. Y. Y. (2003) · Building and Environment · doi:10.1016/s0360-1323(03)00135-5 · Cited by 43 · cited 2×
“…that hybrid fuzzy techniques, such as neurofuzzy and fuzzy neural networks Boussabaine 2001a,b; Lam et al. 2001a; Cheng and Ko 2003; Liu and Ling 2003, 2005 , are increasingly applied in construction management research and they can be more widely adopted in this field because they can…”
BackgroundMethodEvaluating project teaming strategies for construction of Taipei 101 using resource-based theory
Dzeng, R., & Wen, K.-S. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.02.004 · Cited by 42 · cited 1×
“Oliveros and Fayek 2005 developed a fuzzy logic model that integrates daily site reporting of activity progress and delays, with a schedule updating and forecasting system for construction project monitoring and control.”
BackgroundUsing the principal component analysis method as a tool in contractor pre‐qualification
Lam, K. C., Hu, T. S., & Ng, S. T. (2005) · Construction Management and Economics · doi:10.1080/01446190500041263 · Cited by 41 · cited 1×
“Lam et al. 2005 conducted a study on construction site layout planning and discovered that the actual closeness of relationships between site facilities ultimately governed the site layout.”
BackgroundMultiple-Criteria Evaluation for Value Management in Civil Engineering
Sánchez, M., Prats, F., Agell, N., & Ormazábal, G. (2005) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2005)21:3(131 · Cited by 33
Modelling financial decisions in construction firms
Lam, K. C., & Runeson, G. (1999) · Construction Management and Economics · doi:10.1080/014461999371204 · Cited by 28 · cited 1×
“Lam and Runeson 1999 established a decision model for a contracting firm.”
BackgroundFuzzy optimisation of labour allocation by genetic algorithms
Tong, T. K. L., & Tam, C. M. (2003) · Engineering Construction & Architectural Management · doi:10.1108/09699980310466613 · Cited by 11
Cited by
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Pärn, E., & Edwards, D. J. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 721
Self-citationAMEYAW, E. E., HU, Y., SHAN, M., CHAN, A. P. C., & LE, Y. (2016) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/13923730.2014.945953 · Cited by 307
Self-citationHe, Q., Luo, L., Hu, Y., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.009 · Cited by 243
“Therefore, measuring qualitative factors by using fuzzy numbers helps in speeding up decision making processes and in obtaining highly realistic results (Chan et al., 2009).”
BackgroundSelf-citationLi, T. H. Y., Ng, S. T., & Skitmore, M. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.007 · Cited by 219
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Metadata
- Authors
- Chan, A. P. C., Chan, D. W. M., & Yeung, J. F. Y.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2009-11
- Volume
- 135
- Issue
- 11
- Pages
- 1241-1252
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2019613054
- Cited by
- 178
- References
- 38
- FWCI
- 6.77
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.