The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Organizational Divisions in BIM-Enabled Commercial Construction
Abstract
Proponents claim that the adoption of building information modeling (BIM) will lead to greater efficiencies through increased collaboration. In this paper, we present research that examines the use of BIM technologies for mechanical, electrical, plumbing, and fire life safety systems (often referred to as MEP) coordination and how the introduction of BIM influences collaboration and communication. Using data from over 12 months of ethnographic observations of the MEP coordination process for two commercial construction projects and interviews with 65 industry leaders across the United States, we find that BIM-enabled projects are often tightly coupled technologically, but divided organizationally. This means that while BIM makes visible the connections among project members, it is not fostering closer collaboration across different companies. We outline the competing obligations to scope, project, and company as one cause for this division. Obligations to an individual scope of work or to a particular company can conflict with project goals. Individual leadership, especially that of the MEP coordinator in the teams we studied, often substitutes for stronger project cohesion and organization. Organizational forces and structures must be accounted for in order for BIM to be implemented successfully.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Orlikowski, W. J. (2000) · Organization Science · doi:10.1287/orsc.11.4.404.14600 · Cited by 4,760
Differentiation and Integration in Complex Organizations
Lawrence, P. R., & Lorsch, J. W. (1967) · Administrative Science Quarterly · doi:10.2307/2391211 · Cited by 3,937
Barley, S. R. (1986) · Administrative Science Quarterly · doi:10.2307/2392767 · Cited by 2,315
Cited by
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Miettinen, R., & Paavola, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.03.009 · Cited by 480
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
Understanding effects of BIM on collaborative design and construction: An empirical study in China
Liu, Y., van Nederveen, S., & Hertogh, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.007 · Cited by 411
Liu, X., Wang, X., Wright, G., Cheng, J., Li, X., & Liu, R. (2017) · ISPRS International Journal of Geo-Information · doi:10.3390/ijgi6020053 · Cited by 398
Metadata
- Authors
- Dossick, C. S., & Neff, G.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2010-04
- Volume
- 136
- Issue
- 4
- Pages
- 459-467
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2110018436
- Cited by
- 312
- References
- 3
- FWCI
- 18.95
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Organizational Divisions in BIM-Enabled Commercial Construction. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000109
- The paper
- Dossick, C. S., & Neff, G. (2010). Organizational Divisions in BIM-Enabled Commercial Construction. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000109
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.