Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Abstract
This study compares and analyzes the relationship of design-build (DB) and design-bid-build (DBB) project delivery methods with performance metrics of large highway projects ( >$50 million ). Project performance is measured in cost, schedule, and change orders on these two types of highway projects. This study also investigates associations between project characteristics (input variables) and project performance (output variables) of large highway projects. The performance comparison methodology used here is derived from work done on a Texas Department of Transportation study of the State Highway 130 Project. The study results show that the construction speed and project delivery speed per lane mile (or lane kilometer) of DB projects were significantly faster than that of DBB projects for this sample. The study also showed that out of 21 inputs analyzed, 14 inputs have statistically significant associations with one or more outputs of these projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods
Hale, D. R., Shrestha, P. P., Gibson, G. E., & Migliaccio, G. C. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000017 · Cited by 284
Self-citationProject Delivery Systems and Project Change: Quantitative Analysis
Ibbs, C. W., Kwak, Y. H., Ng, T., & Odabasi, A. M. (2003) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2003)129:4(382 · Cited by 262
Effect of Delivery Methods on Design Performance in Multifamily Housing Projects
Hyun, C.-T., Cho, K., Koo, K.-J., Hong, T., & Moon, H. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:7(468 · Cited by 65
Cited by
Circular public procurement through integrated contracts in the infrastructure sector
Lingegård, S., Havenvid, M. I., & Eriksson, P.-E. (2021) · Sustainability · doi:10.3390/su132111983 · Cited by 20
Metadata
- Authors
- Shrestha, P. P., O’Connor, J. T., & Gibson, G. E.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2012-01
- Volume
- 138
- Issue
- 1
- Pages
- 1-13
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2156066818
- Cited by
- 163
- References
- 3
- FWCI
- 7.37
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000390
- The paper
- Shrestha, P. P., O’Connor, J. T., & Gibson, G. E. (2012). Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000390
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.