Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization
The DOI matches its Crossref record; 26 of the 26 references it cites were found in a registry or an index.
Abstract
Modularization is a well-established technique that can improve the construction industry by exporting a portion of site-based work to fabrication shops. However, its application in the industry is limited. The Engineering, Procurement and Construction (EPC) industry needs new approaches to reach higher levels of modularization. The purpose of this study is to determine what changes in current EPC processes are needed to create an optimal environment for a broader and more effective use of modularization. In creating such an nvironment, it is necessary to know the factors that lead to success. The most influential critical success factors (CSFs; 21 total) have been determined by the expertise of a research team who compiled a detailed list by adding CSF enablers. CSF enablers are additional steps that can facilitate accomplishment of the associated CSF. A closer look at the top five CSFs indicates that project teams should pay particular attention to module envelope limitations, team agreement on project drivers, adequate owner-planning resources and processes, timely freeze of scoping and design, and due recognition of possible early completion from modularization. This CSFs analysis and addition of enablers provide guidelines and ways to implement strategies for successful modularization in a project and leverages modularization to benefit capital projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Applied Multivariate Statistical Analysis.
Johnson, A. R., & Wichern, D. W. (1988) · Biometrics · doi:10.2307/2531616 · Cited by 11,353
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Lean Thinking—Banish Waste and Create Wealth in your Corporation
Womack, J. P., & Jones, D. T. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600967 · Cited by 2,122
An exploration towards a production theory and its application to construction
Koskela, L. (2000) · Aaltodoc (Aalto University) · Cited by 1,868
Multiagent systems: algorithmic, game-theoretic, and logical foundations
(2009) · Choice Reviews Online · doi:10.5860/choice.46-5662 · Cited by 1,756
Handbook in research and evaluation
(1971) · Behavior Therapy · doi:10.1016/s0005-7894(71)80129-6 · Cited by 1,487
Auction Theory: A Guide to the Literature
Klemperer, P. (1999) · Journal of Economic Surveys · doi:10.1111/1467-6419.00083 · Cited by 1,394
Fishman, G. S. (2001) · Springer eBooks · doi:10.1007/978-1-4757-3552-9 · Cited by 702
Experiences creating three implementations of the repast agent modeling toolkit
NORTH, M. J., Collier, N. T., & Vos, J. R. (2006) · ACM Transactions on Modeling and Computer Simulation · doi:10.1145/1122012.1122013 · Cited by 678
The auction algorithm: A distributed relaxation method for the assignment problem
Bertsekas, D. P. (1988) · Annals of Operations Research · doi:10.1007/bf02186476 · Cited by 634
ISSUES IN MULTI AGENT RESOURCE ALLOCATION
Chevaleyre, Y., Dunne, P. E. S., Endriss, U., Lang, J., Lemaître, M., Maudet, N., Padget, J. A., Phelps, S. C., Rodríguez-Aguilar, J. A., & Sousa, P. B. (2005) · Informatica · Cited by 584
Auction algorithms for network flow problems: A tutorial introduction
Bertsekas, D. P. (1992) · Computational Optimization and Applications · doi:10.1007/bf00247653 · Cited by 421
Re-engineering through pre-assembly: client expectations and drivers
Gibb, A., & Isack, F. (2003) · Building Research & Information · doi:10.1080/09613210302000 · Cited by 397
Controlling Design Variants: Modular Product Platforms
Ericsson, A., & Erixon, G. (1999) · Cited by 347
Effects of Lean Construction on Sustainability of Modular Homebuilding
Nahmens, I., & Ikuma, L. H. (2011) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000054 · Cited by 306
Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities
Eastman, C. M., & Sacks, R. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:7(517 · Cited by 197
Development of Lean Model for House Construction Using Value Stream Mapping
Yu, H., Tweed, T., Al-Hussein, M., & Nasseri, R. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:8(782 · Cited by 165
Value Stream Management: Eight Steps to Planning, Mapping and Sustaining Lean Improvements
Tapping, D., Luyster, T., & Shulzer, T. (2003) · Journal for Healthcare Quality · doi:10.1097/01445442-200311000-00016 · Cited by 135
Lean Management Model for Construction of High-Rise Apartment Buildings
Sacks, R., & Goldin, M. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:5(374 · Cited by 124
On prefabrication implementation for different project types and procurement methods in Hong Kong
Tam, V. W. Y., Tam, C. M., & Ng, W. C. Y. (2007) · Journal of Engineering Design and Technology · doi:10.1108/17260530710746614 · Cited by 108
Automation in the Prefab and Modular Construction Industry
Neelamkavil, J. (2009) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2009/0018 · Cited by 95
Advancing the Competitiveness and Efficiency of the U.S. Construction Industry
National Research Council (2009) · National Academies Press eBooks · doi:10.17226/12717 · Cited by 85
Flow Production of Pipe Spool Fabrication: Simulation to Support Implementation of Lean Technique
Wang, P., Mohamed, Y., AbouRizk, S., & Rawa, A. R. T. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000068 · Cited by 71
Considerations for assessing the benefits of standardisation and pre-assembly in construction
Pasquire, C., & Gibb, A. (2002) · Loughborough University Institutional Repository (Loughborough University) · Cited by 64
Multiagent Resource Allocation with K -additive Utility Functions
Chevaleyre, Y., Endriss, U., Estivie, S., Nicolas Maudet, B., & Paris-dauphine, U. (2004) · Cited by 58
Virtual Construction Automation for Modular Assembly Operations
Olearczyk, J., Al‐Hussein, M., Bouferguène, A., & Telyas, A. (2009) · ASCE Construction Research Congress (CRC) · doi:10.1061/41020(339)42 · Cited by 18
Cited by
Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.136 · Cited by 318
Critical success factors for modular integrated construction projects: a review
Wuni, I. Y., & Shen, G. Q. (2020) · Building Research & Information · doi:10.1080/09613218.2019.1669009 · Cited by 237
A study of literature in modular integrated construction - Critical review and future directions
Abdelmageed, S., & Zayed, T. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.124044 · Cited by 190
Wuni, I. Y., & Shen, G. Q. (2022) · Sustainable Production and Consumption · doi:10.1016/j.spc.2021.11.010 · Cited by 158
Metadata
- Authors
- O’Connor, J. T., O’Brien, W. J., & Choi, J. O.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2014-06
- Volume
- 140
- Issue
- 6
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2026229742
- Cited by
- 161
- References
- 26
- FWCI
- 8.82
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.