Abstract
Variations in labor productivity are the result of multiple influential factors. This paper attempts to develop a labor productivity model based on multilayer feedforward neural networks trained with a backpropagation algorithm by which complex mapping of factors to labor productivity is performed. To prevent networks from overfitting and improve their generalization, early stopping and Bayesian regularization are implemented and compared. The results proved a better prediction performance for Bayesian regularization than early stopping. To demonstrate the prediction performance of the presented models, the developed models are implemented at two real power plant construction projects. Moreover, in order to extract the influence rate of each factor on the predictive behavior of the neural network models and to identify the most influential factors a sensitivity analysis is conducted. This paper focuses on the work involved in installing the concrete foundations of gas, steam, and combined cycle power plant construction projects in the developing country of Iran. This study contributes to the construction project management body of knowledge by investigating the influential factors on labor productivity and developing an artificial neural network to measure and predict labor productivity in developing countries using the Bayesian regularization and early stopping methods. This approach provides insight into better ways of modeling labor productivity.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Coefficient Alpha and the Internal Structure of Tests
Cronbach, L. J. (1951) · Psychometrika · doi:10.1007/bf02310555 · Cited by 43,931
Neural Networks: A Comprehensive Foundation
Haykin, S. (1998) · Cited by 30,070
SPSS for Windows Step by Step: A Simple Guide and Reference
Mallery, P., & George, D. (1998) · Cited by 10,394
Practical Research: Planning and Design
Brent, E., & Leedy, P. D. (1990) · Teaching Sociology · doi:10.2307/1318509 · Cited by 9,309
Hagan, M., Demuth, H. B., Beale, M. H., & Jes?s, O. D. (2016) · Institutional Repository of the National University Open and Distance UNAD (Universidad Nacional Abierta y a Distancia) · Cited by 5,133
MacKay, D. J. C. (1992) · Neural Computation · doi:10.1162/neco.1992.4.3.415 · Cited by 4,388
A scaled conjugate gradient algorithm for fast supervised learning
Møller, M. F. (1993) · Neural Networks · doi:10.1016/s0893-6080(05)80056-5 · Cited by 4,052
Neural computing: theory and practice
(1989) · Choice Reviews Online · doi:10.5860/choice.27-1569 · Cited by 1,663
Introduction to multi-layer feed-forward neural networks
Svozil, D., Kvasnicka, V., & Pospichal, J. (1997) · Chemometrics and Intelligent Laboratory Systems · doi:10.1016/s0169-7439(97)00061-0 · Cited by 1,600
Connectionist learning procedures
Hinton, G. E. (1989) · Artificial Intelligence · doi:10.1016/0004-3702(89)90049-0 · Cited by 1,430
Cited by
Machine learning algorithms for construction projects delay risk prediction
Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001736 · Cited by 327
Metadata
- Authors
- Heravi, G., & Eslamdoost, E.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2015-10
- Volume
- 141
- Issue
- 10
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2171861768
- Cited by
- 162
- References
- 26
- FWCI
- 10.39
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0001006
- The paper
- Heravi, G., & Eslamdoost, E. (2015). Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0001006
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.