Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity
The DOI matches its Crossref record; 26 of the 26 references it cites were found in a registry or an index.
Abstract
Variations in labor productivity are the result of multiple influential factors. This paper attempts to develop a labor productivity model based on multilayer feedforward neural networks trained with a backpropagation algorithm by which complex mapping of factors to labor productivity is performed. To prevent networks from overfitting and improve their generalization, early stopping and Bayesian regularization are implemented and compared. The results proved a better prediction performance for Bayesian regularization than early stopping. To demonstrate the prediction performance of the presented models, the developed models are implemented at two real power plant construction projects. Moreover, in order to extract the influence rate of each factor on the predictive behavior of the neural network models and to identify the most influential factors a sensitivity analysis is conducted. This paper focuses on the work involved in installing the concrete foundations of gas, steam, and combined cycle power plant construction projects in the developing country of Iran. This study contributes to the construction project management body of knowledge by investigating the influential factors on labor productivity and developing an artificial neural network to measure and predict labor productivity in developing countries using the Bayesian regularization and early stopping methods. This approach provides insight into better ways of modeling labor productivity.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Coefficient Alpha and the Internal Structure of Tests
Cronbach, L. J. (1951) · Psychometrika · doi:10.1007/bf02310555 · Cited by 43,931
Neural Networks: A Comprehensive Foundation
Haykin, S. (1998) · Cited by 30,070
SPSS for Windows Step by Step: A Simple Guide and Reference
Mallery, P., & George, D. (1998) · Cited by 10,394
Practical Research: Planning and Design
Brent, E., & Leedy, P. D. (1990) · Teaching Sociology · doi:10.2307/1318509 · Cited by 9,309
Hagan, M., Demuth, H. B., Beale, M. H., & Jes?s, O. D. (2016) · Institutional Repository of the National University Open and Distance UNAD (Universidad Nacional Abierta y a Distancia) · Cited by 5,133
MacKay, D. J. C. (1992) · Neural Computation · doi:10.1162/neco.1992.4.3.415 · Cited by 4,388
A scaled conjugate gradient algorithm for fast supervised learning
Møller, M. F. (1993) · Neural Networks · doi:10.1016/s0893-6080(05)80056-5 · Cited by 4,052
Neural computing: theory and practice
(1989) · Choice Reviews Online · doi:10.5860/choice.27-1569 · Cited by 1,663
Introduction to multi-layer feed-forward neural networks
Svozil, D., Kvasnicka, V., & Pospichal, J. (1997) · Chemometrics and Intelligent Laboratory Systems · doi:10.1016/s0169-7439(97)00061-0 · Cited by 1,600
Connectionist learning procedures
Hinton, G. E. (1989) · Artificial Intelligence · doi:10.1016/0004-3702(89)90049-0 · Cited by 1,430
Neural computing: Theory and practice
O'Toole, A. J. (1990) · Neural Networks · doi:10.1016/0893-6080(90)90059-t · Cited by 1,044
Neural Networks in Civil Engineering. I: Principles and Understanding
Flood, I., & Kartam, N. (1994) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(1994)8:2(131 · Cited by 581
Factors Affecting Construction Labor Productivity in Kuwait
Jarkas, A. M., & Bitar, C. G. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000501 · Cited by 433
Construction productivity: Issues encountered by contractors in Singapore
Lim, E., & Alum, J. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)95704-h · Cited by 294
Research Validation: Challenges and Opportunities in the Construction Domain
Lucko, G., & Rojas, E. M. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000025 · Cited by 244
FACTORS AFFECTING THE PRODUCTIVITY OF BUILDING CRAFTSMEN ‐ STUDIES OF UGANDA
Alinaitwe, H. M., Mwakali, J. A., & Hansson, B. (2007) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2007.9636434 · Cited by 240
Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity
Dai, J., Goodrum, P. M., & Maloney, W. F. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:3(217 · Cited by 232
Neural Networks as Tools in Construction
Moselhi, O., Hegazy, T., & Fazio, P. (1991) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1991)117:4(606 · Cited by 197
Construction Labor Productivity Modeling with Neural Networks
Sönmez, R., & Rowings, J. E. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:6(498 · Cited by 170
Measuring and Modeling Labor Productivity Using Historical Data
Song, L., & AbouRizk, S. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:10(786 · Cited by 148
A survey of constraints on Iranian construction operatives' productivity
Zakeri, M., Olomolaiye, P. O., Holt, G. D., & HARRIS, F. C. (1996) · Construction Management and Economics · doi:10.1080/014461996373287 · Cited by 130
Impact of Shift Work on Labor Productivity for Labor Intensive Contractor
Hanna, A. S., Chang, C.-K., Sullivan, K. T., & Lackney, J. A. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:3(197 · Cited by 129
The JIT materials management system in developing countries
Polat, G., & Arditi, D. (2005) · Construction Management and Economics · doi:10.1080/01446190500041388 · Cited by 100
Estimating Labor Production Rates for Industrial Construction Activities
AbouRizk, S., Knowles, P., & Hermann, U. (2001) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2001)127:6(502 · Cited by 94
An Introduction to Neural Networks and a Comparison with Artificial Intelligence and Expert Systems
Zahedi, F. M. (1991) · INFORMS Journal on Applied Analytics · doi:10.1287/inte.21.2.25 · Cited by 81
Improving Labor Productivity Through Production Control
Liu, M., & Ballard, G. (2008) · Cited by 53
Cited by
Machine learning algorithms for construction projects delay risk prediction
Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001736 · Cited by 327
Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model
Yaseen, Z. M., Ali, Z. H., Salih, S. Q., & Al-Ansari, N. (2020) · Sustainability · doi:10.3390/su12041514 · Cited by 194
“Heravi and Eslamdoost (2015) investigated the potential of an ANN model for the prediction of labor productivity in construction projects [27].”
Background
Metadata
- Authors
- Heravi, G., & Eslamdoost, E.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2015-10
- Volume
- 141
- Issue
- 10
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2171861768
- Cited by
- 162
- References
- 26
- FWCI
- 10.39
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.