A novel two-phase group decision making approach for construction project selection in a fuzzy environment
Open accessThe claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Fuzzy-AHP and Fuzzy-ANP require many tedious pairwise comparisons.
“However, Fuzzy-AHP and Fuzzy-ANP have similar drawbacks, requiring many tedious pairwise comparisons [40,41].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [40]
Section 3.1 (ANP; page unavailable) describes repeated pairwise comparisons, and Section 5.2 (Discussion; page unavailable) calls manipulations in conventional fuzzy ANP comparisons “boring.” The copy does not establish that fuzzy AHP shares this drawback, so it supports the fuzzy-ANP part but not the claim about both methods. (LLM, conf=0.84)
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Cites
The Analytic Hierarchy Process
Saaty, T. L., & Kearns, K. P. (1985) · Elsevier eBooks · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,407 · see citing works
The Concept of a Linguistic Variable and Its Application to Approximate Reasoning—I
Zadeh, L. A. (1975) · Information Sciences · doi:10.1016/0020-0255(75)90036-5 · Cited by 12,187 · see citing works
The concept of a linguistic variable and its application to approximate reasoning-III
Zadeh, L. A. (1975) · Information Sciences · doi:10.1016/0020-0255(75)90017-1 · Cited by 12,172 · see citing works
Multiple Attribute Decision Making: Methods and Applications
Chen, S.-J. J., Hwang, C. L., Beckmann, M. J., & Krelle, W. E. (1981) · Medical Entomology and Zoology · Cited by 8,207 · see citing works
Fuzzy Set Theory—and Its Applications
Zimmermann, H. ‐. (2001) · Springer eBooks · doi:10.1007/978-94-010-0646-0 · Cited by 7,547 · see citing works
Fuzzy Logic with Engineering Applications
Ross, T. J. (2010) · Wiley eBooks · doi:10.1002/9781119994374 · Cited by 6,620 · see citing works
Fuzzy Sets and Systems - Theory and Applications
Dubois, D., & Prade, H. M. (1980) · Mathematics in Science and Engineering/Mathematics in science and engineering · doi:10.1016/s0076-5392(09)x6008-x · Cited by 6,416 · see citing works
Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS
Opricovic, S. C., & Tzeng, G. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(03)00020-1 · Cited by 5,006 · see citing works
Matrix Analysis and Applied Linear Algebra
Meyer, C. (2000) · doi:10.1137/1.9780898719512 · Cited by 3,565 · see citing works
Matrix analysis and applied linear algebra
Meyer, C. D. (2001) · Choice Reviews Online · doi:10.5860/choice.38-5065 · Cited by 3,384 · see citing works
Decision making with dependence and feedback : the analytic network process
Saaty, T. L. (1996) · Medical Entomology and Zoology · Cited by 3,381 · see citing works
Fundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process
Saaty, T. L. (2000) · Medical Entomology and Zoology · Cited by 2,649 · see citing works
The Concept of a Linguistic Variable and Its Application to Approximate Reasoning—II
Zadeh, L. A. (1975) · Information Sciences · doi:10.1016/0020-0255(75)90046-8 · Cited by 2,555 · see citing works
Fuzzy Multiple Attribute Decision Making
Chen, S., & Hwang, C.-L. (1992) · Lecture notes in economics and mathematical systems · doi:10.1007/978-3-642-46768-4 · Cited by 1,888 · see citing works
A procedure for ordering fuzzy subsets of the unit interval
Yager, R. R. (1981) · Information Sciences · doi:10.1016/0020-0255(81)90017-7 · Cited by 1,447 · see citing works
Understanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 858 · see citing works
Real Analysis and Probability.
Ross, K. A., & ASH, R. B. (1975) · American Mathematical Monthly · doi:10.2307/2319153 · Cited by 727 · see citing works
Fuzzy VIKOR with an application to water resources planning
Opricovic, S. C. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.04.097 · Cited by 585 · see citing works
Büyüközkan, G., & Çifçi, G. (2010) · Computers in Industry · doi:10.1016/j.compind.2010.10.009 · Cited by 513 · see citing works
Extension of VIKOR method for decision making problem with interval numbers
Sayadi, M. K., Heydari, M., & Shahanaghi, K. (2008) · Applied Mathematical Modelling · doi:10.1016/j.apm.2008.06.002 · Cited by 493 · see citing works
(1972) · Elsevier eBooks · doi:10.1016/c2013-0-07155-1 · Cited by 450 · see citing works
Managing Risk in Construction Projects
Smith, N. J. T., Merna, T., & Jobling, P. E. (1998) · Cited by 422 · see citing works
A comprehensive VIKOR method for material selection
Jahan, A., Mustapha, F. B., Ismail, M. Y., et al. (2010) · Materials & Design (1980-2015) · doi:10.1016/j.matdes.2010.10.015 · Cited by 399 · see citing works
Fuzzy AHP approach for selecting the suitable bridge construction method
Pan, N.-F. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.03.005 · Cited by 351 · see citing works
An approach to ordinal decision making
Yager, R. R. (1995) · International Journal of Approximate Reasoning · doi:10.1016/0888-613x(94)00035-2 · Cited by 324 · see citing works
A VIKOR technique based on DEMATEL and ANP for information security risk control assessment
Yang, Y.-P. O., Shieh, H., & Tzeng, G. (2011) · Information Sciences · doi:10.1016/j.ins.2011.09.012 · Cited by 321 · see citing works
Diagnosis with Dependent Symptoms: Bayes Theorem and the Analytic Hierarchy Process
Saaty, T. L., & Vargas, L. G. (1998) · Operations Research · doi:10.1287/opre.46.4.491 · Cited by 298 · see citing works
Karsak, E. E., & Tolga, E. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00081-5 · Cited by 278 · see citing works
Development of a fuzzy ANP based SWOT analysis for the airline industry in Turkey
Şevkli, M., Oztekin, A., Uysal, Ö., Torlak, N. G., Türkyılmaz, A., & Delen, D. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.06.047 · Cited by 267 · see citing works
A fuzzy set approach for R&D portfolio selection using a real options valuation model
Wang, J., & Hwang, W.-L. (2005) · Omega · doi:10.1016/j.omega.2005.06.002 · Cited by 262 · see citing works
A simple method to improve the consistency ratio of the pair-wise comparison matrix in ANP
Ergu, D., Kou, G., Peng, Y., et al. (2011) · European Journal of Operational Research · doi:10.1016/j.ejor.2011.03.014 · Cited by 249 · see citing works
Chen, J.-K., & Chen, I.-S. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.06.079 · Cited by 229 · see citing works
A modified VIKOR multiple-criteria decision method for improving domestic airlines service quality
Liou, J. J. H., Tsai, C.-Y., Lin, R.-H., & Tzeng, G. (2010) · Journal of Air Transport Management · doi:10.1016/j.jairtraman.2010.03.004 · Cited by 222 · see citing works
Extension of VIKOR method in intuitionistic fuzzy environment for robot selection
Devi, K. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.04.227 · Cited by 205 · see citing works
Analytic Network Process Applied to Project Selection
Cheng, E. W. L., & Li, H. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:4(459 · Cited by 195 · see citing works
Analytic network process in risk assessment and decision analysis
Ergu, D., Kou, G., Shi, Y., & Shi, Y. (2011) · Computers & Operations Research · doi:10.1016/j.cor.2011.03.005 · Cited by 183 · see citing works
Bid/no-bid decision-making – a fuzzy linguistic approach
Lin, C., & Chen, Y.-T. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.01.005 · Cited by 183 · see citing works
Key Factors in Bid Reasoning Model
Chua, D. K. H., & Li, D. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:5(349 · Cited by 173 · see citing works
Group decision making based on novel fuzzy modified TOPSIS method
Vahdani, B., Mousavi, S. M., & Tavakkoli-Moghaddam, R. R. (2011) · Applied Mathematical Modelling · doi:10.1016/j.apm.2011.02.040 · Cited by 169 · see citing works
Self-citationUsing a hybrid MCDM model to evaluate firm environmental knowledge management in uncertainty
Tseng, M. (2010) · Applied Soft Computing · doi:10.1016/j.asoc.2010.04.006 · Cited by 163 · see citing works
Karpak, B., & Topçu, Y. İ. (2010) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.01.001 · Cited by 151 · see citing works
A fuzzy hybrid MCDM approach for professional selection
Kabak, M., Burmaoğlu, S., & Kazançoğlu, Y. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.09.042 · Cited by 151 · see citing works
Extension of VIKOR method based on interval-valued fuzzy sets
Vahdani, B., Hadipour, H., Sadaghiani, J. S., et al. (2009) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-009-2241-2 · Cited by 150 · see citing works
Self-citationTQM consultant selection in SMEs with TOPSIS under fuzzy environment
Saremi, M., Mousavi, S. F., & Sanayei, A. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.01.034 · Cited by 145 · see citing works
Self-citationRisk and confidence analysis for fuzzy multicriteria decision making
Fenton, N., & Wang, W. (2006) · Knowledge-Based Systems · doi:10.1016/j.knosys.2006.03.002 · Cited by 123 · see citing works
A fuzzy risk assessment model for hospital information system implementation
Yücel, G., Çebi, S., Höge, B., & Özok, A. F. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.07.129 · Cited by 114 · see citing works
Product Mix Optimization for Semiconductor Manufacturing Based on AHP and ANP Analysis
Chung, S., Lee, A. H. I., & Pearn, W. L. (2004) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-003-1956-8 · Cited by 103 · see citing works
Chuu, S.-J. (2009) · Computers & Industrial Engineering · doi:10.1016/j.cie.2009.04.011 · Cited by 102 · see citing works
A fuzzy ANP model for supplier selection as applied to IC packaging
Kang, H., Lee, A. H. I., & Yang, C.-Y. (2010) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-010-0448-6 · Cited by 98 · see citing works
An effectiveness evaluation model for the web-based marketing of the airline industry
Tsai, W.-H., Chou, W.-C., & Leu, J.-D. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.06.009 · Cited by 96 · see citing works
Wang, W.-P. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.02.015 · Cited by 95 · see citing works
Construction project selection using fuzzy TOPSIS approach
Tan, Y., Shen, L., Langston, C., & Liu, Y. (2010) · Journal of Modelling in Management · doi:10.1108/17465661011092669 · Cited by 92 · see citing works
A Fuzzy Stochastic Multi-Attribute Group Decision-Making Approach for Selection Problems
Mousavi, S. M., Jolai, F., & Tavakkoli-Moghaddam, R. R. (2011) · Group Decision and Negotiation · doi:10.1007/s10726-011-9259-1 · Cited by 87 · see citing works
Self-citationLiou, J. J. H., Tzeng, G., Tsai, C.-Y., et al. (2011) · Applied Soft Computing · doi:10.1016/j.asoc.2011.01.024 · Cited by 68 · see citing works
Use of the analytic hierarchy process to measure the initial viability of industrial projects
Alidi, A. S. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00076-3 · Cited by 65 · see citing works
Mohanty, R. (1992) · International Journal of Project Management · doi:10.1016/0263-7863(92)90070-p · Cited by 57 · see citing works
Developing new products in a network with efficiency and innovation
Lee, A. H. I., Chen, H. H., & Tong, Y. (2008) · International Journal of Production Research · doi:10.1080/00207540701233484 · Cited by 54 · see citing works
Smith-Perera, A., García‐Melón, M., Poveda-Bautista, R., et al. (2010) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2010.01.022 · Cited by 49 · see citing works
A novel hybrid decision-making model for selecting locations in a fuzzy environment
Kuo, M.-S., & Liang, G. (2011) · Mathematical and Computer Modelling · doi:10.1016/j.mcm.2011.01.038 · Cited by 49 · see citing works
A hybrid ANP evaluation model for electronic service quality
Hsu, T., Hung, L., & Tang, J. (2011) · Applied Soft Computing · doi:10.1016/j.asoc.2011.09.008 · Cited by 48 · see citing works
AN INTEGRATED AHP-VIKORMETHODOLOGY FOR PLANT LOCATION SELECTION
Tavakkoli-Moghaddam, R. R., Mousavi, S. M., & Heydar, M. (2011) · International Journal of Engineering, Transactions B: Applications · Cited by 47 · see citing works
Self-citationHybrid fuzzy MADM project-selection model for diversified construction companies
Ravanshadnia, M., Rajaie, H., & Abbasian, H. R. (2010) · Canadian Journal of Civil Engineering · doi:10.1139/l10-048 · Cited by 45 · see citing works
Sağır, M., & Öztürk, Z. K. (2010) · Mathematical and Computer Modelling · doi:10.1016/j.mcm.2010.05.029 · Cited by 44 · see citing works
Project appraisal and selection using the analytic network process
Dikmen, İ., Birgönül, M. T., & Özorhon, B. (2007) · Canadian Journal of Civil Engineering · doi:10.1139/l07-006 · Cited by 35 · see citing works
A Use of Analytic Network Process for Supply Chain Management
Nakagawa, T., & Sekitani, K. (2004) · Asia Pacific Management Review · doi:10.6126/apmr.2004.9.5.02 · Cited by 33 · see citing works
Tavakkoli-Moghaddam, R. R., Mousavi, S. M., & Hashemi, H. (2011) · InTech eBooks · doi:10.5772/16247 · Cited by 26 · see citing works
Self-citationAn effective Markov based approach for calculating the Limit Matrix in the analytic network process
Kirytopoulos, K. A., Voulgaridou, D., Platis, A. Ν., et al. (2011) · European Journal of Operational Research · doi:10.1016/j.ejor.2011.03.043 · Cited by 21 · see citing works
From Construction Project Success to Integrated Construction Project Selection
Shokri-Ghasabeh, M., Chileshe, N., & Zillante, G. (2010) · ASCE Construction Research Congress (CRC) · doi:10.1061/41109(373)102 · Cited by 2 · see citing works
Flagged first, then by citations
Research works printed but not linked: 1
- J.F. Seydel, D.L. Olson, An AHP-based system to support construction bidding with multiple objectives, in: Proceedings DSI, Miami, November, 1991.
Cited by
Sorted by citations
Islam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163 · see citing works
Ashtari, M. A., Ansari, R., Hassannayebi, E., & Jeong, J. (2022) · Buildings · doi:10.3390/buildings12101660 · Cited by 65 · see citing works
Islam, M. S., Nepal, M. P., & Skitmore, M. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001593 · Cited by 60 · see citing works
- Authors
- Ebrahimnejad, S., Mousavi, S. M., Tavakkoli-Moghaddam, R., Hashemi, H., & Vahdani, B.
- Affiliations
- Islamic Azad University, Karaj (IR)
- University of Tehran (IR)
- University of Zanjan (IR)
- Corresponding author
- Ebrahimnejad, S.
- Venue
- Applied Mathematical Modelling
- Publisher
- Elsevier BV
- Published
- 2012-09
- Volume
- 36
- Issue
- 9
- Pages
- 4197-4217
- ISSN
- 0307-904X (ISSN-L)
- OpenAlex
- W1966601769
- Cited by
- 156
- References
- 68
- Citations by year
- 2026: 3 · 2025: 4 · 2024: 6 · 2023: 7 · 2022: 7 · 2021: 11 · 2020: 14 · 2019: 15 · 2018: 19 · 2017: 14 · 2016: 12 · 2015: 15 · 2014: 16 · 2013: 5 · 2012: 8
- FWCI
- 12.59
- Type
- journal article
- Language
- en
- Open access
- bronze
- doi.org
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- www.elsevier.com/legal/tdmrep-license (tdm)
- www.elsevier.com/open-access/userlicense/1.0/ (vor, 1461 d)
- doi.org/10.15223/policy-017 (stm-asf)
- doi.org/10.15223/policy-037 (stm-asf)
- doi.org/10.15223/policy-012 (stm-asf)
- doi.org/10.15223/policy-029 (stm-asf)
- doi.org/10.15223/policy-004 (stm-asf)
- Locations
- Applied Mathematical Modelling (publishedVersion)
- Funders
- Islamic Azad University
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Multi-Criteria Decision Making
- Physical Sciences › Engineering › Control and Systems Engineering › Optimization and Mathematical Programming
- Social Sciences › Business, Management and Accounting › Management Information Systems › Decision Support System Applications
- Keywords
- construction project selection, group decision making, fuzzy analytic network process, fuzzy VIKOR, compromise ranking, multi-criteria decision making, risk preferences, expert decision-making, interdependent criteria
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review