Lean Methodologies and Techniques for Modular Construction: Chronological and Critical Review
The DOI matches its Crossref record; 77 of the 77 references it cites were found in a registry or an index.
Abstract
Modular construction uses building modules manufactured inside the controlled environment of factories to be transported and assembled on site. Modular construction can be considered as a hybrid of manufacturing and construction, and in many ways lends itself to lean production. Lean production, originating in the automotive industry, permits significant improvements in terms of productivity and quality. The latest challenge of lean production is its implementation in the modular building industry, where the full potential in terms of productivity is yet to be achieved. The paper discusses the implementation of lean techniques in the modular building industry, including all the production process stages (i.e., design, manufacturing, transportation, assembly on site, and supply chain) through a systematic review. Moreover, the paper provides a chronological and comprehensive review of lean methodologies and tools in manufacturing and traditional construction industries to further investigate the interface of lean and modular construction. This may assist practitioners with an overview of lean strategies and associated potential benefits and obstacles for future case studies.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Comparison of PubMed, Scopus, Web of Science, and Google Scholar: strengths and weaknesses
Falagas, M. E., Pitsouni, E. I., Malietzis, G. A., & Pappas, G. (2008) · The FASEB Journal · doi:10.1096/fj.07-9492lsf · Cited by 5,039
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Toyota production system: beyond large-scale production
Ohno, T., & Rosen, C. B. (1998) · CERN Document Server (European Organization for Nuclear Research) · Cited by 4,522
THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL
Ballard, H. G. (2000) · University of Birmingham Institutional Research Archive (University of Birmingham) · Cited by 2,057
An exploration towards a production theory and its application to construction
Koskela, L. (2000) · Aaltodoc (Aalto University) · Cited by 1,868
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705
Introduction to Supply Chain Management
Handfield, R., & Nichols, E. L. (1998) · University of Maribor digital library (University of Maribor) · Cited by 1,704
Learning to evolve: A review of contemporary lean thinking
Hines, P., Holweg, M., & Rich, N. (2004) · International Journal of Operations & Production Management · doi:10.1108/01443570410558049 · Cited by 1,664
Benchmarking: the search for industry best practices that lead to superior performance
(1989) · Choice Reviews Online · doi:10.5860/choice.27-2173 · Cited by 1,645
Monden, Y. (1993) · Springer eBooks · doi:10.1007/978-1-4615-9714-8 · Cited by 1,303
Stalk, G., & Hout, T. M. (1990) · Research-Technology Management · doi:10.1080/08956308.1990.11670646 · Cited by 1,269
A Study of the Toyota Production System From an Industrial Engineering Viewpoint
Shingo, S., & Bodek, N. (2019) · doi:10.4324/9781315136509 · Cited by 1,064
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
Toyota Production System: Beyond Large-Scale Production
Ohno, T., & Bodek, N. (2019) · Productivity Press eBooks · doi:10.4324/9780429273018 · Cited by 793
Ferdous, W., Bai, Y., Ngo, T. D., Manalo, A., & Mendis, P. (2019) · Engineering Structures · doi:10.1016/j.engstruct.2019.01.061 · Cited by 681
Self-citationToyota Production System: Practical Approach to Production Management
Monden, Y. (1983) · Cited by 612
Lean Management, Supply Chain Management and Sustainability: A Literature Review
Martínez-Jurado, P. J., & Moyano-Fuentes, J. (2014) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2013.09.042 · Cited by 582
Zero Quality Control: Source Inspection and the Poka-Yoke System
Shingo, S. (1986) · Cited by 574
Applying lean thinking in construction and performance improvement
Aziz, R. F., & Hafez, S. M. (2013) · Alexandria Engineering Journal · doi:10.1016/j.aej.2013.04.008 · Cited by 513
Shielding Production: Essential Step in Production Control
Ballard, G., & Howell, G. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:1(11 · Cited by 510
Models of Organization and Total Quality Management: A Comparison and Critical Evaluation
Spencer, B. A. (1994) · The Academy of Management Review · doi:10.2307/258935 · Cited by 464
Material Waste in Building Industry: Main Causes and Prevention
Formoso, C. T., Soibelman, L., De Cesare, C., & Isatto, E. L. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:4(316 · Cited by 434
Lean Construction: From Theory to Implementation
Salem, O., Solomon, J., Genaidy, A., & Minkarah, I. (2006) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2006)22:4(168 · Cited by 412
Computer integrated manufacturing
(1988) · Computer-Aided Design · doi:10.1016/0010-4485(88)90151-0 · Cited by 368
Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique
Tommelein, I. D. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:4(279 · Cited by 322
Effects of Lean Construction on Sustainability of Modular Homebuilding
Nahmens, I., & Ikuma, L. H. (2011) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000054 · Cited by 306
Implementing Lean Construction: Stabilizing Work Flow
Ballard, G., & Howell, G. A. (1997) · Cited by 268
Visualization of Work Flow to Support Lean Construction
Sacks, R., Treckmann, M., & Rozenfeld, O. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000102 · Cited by 226
Lean production in a changing competitive world: a Japanese perspective
Katayama, H., & Bennett, D. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610109811 · Cited by 223
Machine that changed the world
Staff, C. (1993) · Computer · Cited by 193
Site Implementation and Assessment of Lean Construction Techniques
Salem, O., Solomon, J., Genaidy, A., & Luegering, M. (2005) · Lean Construction Journal · doi:10.60164/e2i9e2h1d · Cited by 190
CONSTRUCTION BEYOND LEAN: A NEW UNDERSTANDING OF CONSTRUCTION MANAGEMENT
Bertelsen, S., & Koskela, L. (2004) · Cited by 177
Models of manufacturing and the construction process: the genesis of re-engineering construction
Winch, G. (2003) · Building Research & Information · doi:10.1080/09613210301995 · Cited by 175
Lost in transition: the transfer of lean manufacturing to construction
Jørgensen, B., & Emmitt, S. (2008) · Engineering, Construction and Architectural Management · doi:10.1108/09699980810886874 · Cited by 169
Development of Lean Model for House Construction Using Value Stream Mapping
Yu, H., Tweed, T., Al-Hussein, M., & Nasseri, R. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:8(782 · Cited by 165
Improving construction management practice with the Last Planner System: a case study
O. AlSehaimi, A., Tzortzopoulos Fazenda, P., & Koskela, L. (2014) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-03-2012-0032 · Cited by 163
Construction as a Complex System
Bertelsen, S. (2003) · Cited by 146
Applicability of lean principles and practices in industrialized housing production
Höök, M., & Stehn, L. (2008) · Construction Management and Economics · doi:10.1080/01446190802422179 · Cited by 141
An innovative supply chain strategy for customized housing
Naim, M. M., & Barlow, J. G. (2003) · Construction Management and Economics · doi:10.1080/0144619032000134129 · Cited by 140
Nahmens, I., & Ikuma, L. H. (2009) · Lean Construction Journal · doi:10.60164/a2g0h2d4b · Cited by 139
Mostafa, S., Chileshe, N., & Abdelhamid, T. (2016) · Construction Innovation · doi:10.1108/ci-09-2014-0043 · Cited by 139
Design and Construction: Building in Value
Best, R., & de Valence, G. (2002) · Cited by 138
Li, X., Shen, Q., Wu, P., Fan, H., Wu, H., & Teng, Y. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000577 · Cited by 138
Lean Transformation in a Modular Building Company: A Case for Implementation
Yu, H., Al‐Hussein, M., Al-Jibouri, S. H. S., & Telyas, A. (2011) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000115 · Cited by 136
Optimization of process integration and multi-skilled resource utilization in off-site construction
Arashpour, M., Wakefield, R. R., Blismas, N. G., & Minas, J. P. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.12.002 · Cited by 136
Self-citationImproving Work Flow Reliability
Ballard, G. (1999) · Cited by 134
Use of Safety and Lean Integrated Kaizen to Improve Performance in Modular Homebuilding
Ikuma, L. H., Nahmens, I., & James, J. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000330 · Cited by 134
Arashpour, M., Kamat, V. R., Bai, Y., Wakefield, R. R., & Abbasi, B. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.07.027 · Cited by 132
Self-citationRevisiting the Three Peculiarities of Production in Construction
Vrijhoef, R., & Koskela, L. (2005) · University of Huddersfield Repository (University of Huddersfield) · Cited by 129
LEAPCON: Simulation of Lean Construction of High-Rise Apartment Buildings
Sacks, R., Esquenazi, A., & Goldin, M. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:7(529 · Cited by 124
Arashpour, M., Wakefield, R. R., Lee, E. W. M., Chan, R., & Hosseini, M. R. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.02.004 · Cited by 122
Self-citationLearning to see work flow: an application of lean concepts to precast concrete fabrication
Ballard, G., Harper, N., & Zabelle, T. R. (2003) · Engineering Construction & Architectural Management · doi:10.1108/09699980310466505 · Cited by 101
Love, P. E. D., Zahir Irani, A., & Edwards, D. J. (2003) · Project Management Journal · doi:10.1177/875697280303400303 · Cited by 100
Lean principles in industrialized housing production: the need for a cultural change
Höök, M., & Stehn, L. (2008) · Lean Construction Journal · doi:10.60164/03a3c4g7c · Cited by 96
Meiling, J., Bäcklund, F. G., & Johnsson, H. (2012) · Engineering Construction & Architectural Management · doi:10.1108/09699981211206089 · Cited by 93
Critical Success Factors in Manufacturing Resource Planning Implementation
Burns, O. M., Turnipseed, D. L., & Riggs, W. E. (1991) · International Journal of Operations & Production Management · doi:10.1108/01443579110136221 · Cited by 86
Al‐Sudairi, A. A. (2007) · Construction Innovation · doi:10.1108/14714170710721322 · Cited by 85
Pheng, L. S., & Chuan, C. J. (2001) · Integrated Manufacturing Systems · doi:10.1108/eum0000000006107 · Cited by 81
An integrated model for factors affecting construction and demolition waste management in Iran
Nikmehr, B., Hosseini, M. R., Rameezdeen, R., Chileshe, N., Ghoddousi, P., & Arashpour, M. (2017) · Engineering Construction & Architectural Management · doi:10.1108/ecam-01-2016-0015 · Cited by 74
Self-citationIdentifying Waste: Applications of Construction Process Analysis
Lee, S., Diekmann, J. E., Songer, A. D., & Brown, H. M. (1999) · Cited by 71
More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes
Tommelein, I. D., & Weissenberger, M. (1999) · Cited by 70
Production process improvement of buildings’ prefabricated steel frames using value stream mapping
Heravi, G., & Firoozi, M. (2016) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-016-9306-9 · Cited by 70
‘Poka Yoke’ or Quality by Mistake Proofing Design and Construction Systems
Tommelein, I. D. (2008) · Cited by 60
Arbulu, R., Ballard, G., & Harper, N. (2003) · Cited by 56
Integrated BIM/Lean Base Production Line Schedule Model for Modular Construction Manufacturing
Moghadam, M., Alwisy, A., & Al‐Hussein, M. (2012) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784412329.128 · Cited by 54
Lean Homebuilding: Lessons Learned from a Precast Concrete Panelizer
Nahmens, I., & Mullens, M. A. (2011) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000037 · Cited by 48
Material requirements planning system infusion
Cooper, R., & Zmud, R. W. (1989) · Omega · doi:10.1016/0305-0483(89)90043-1 · Cited by 48
Panel Stacking, Panel Sequencing, and Stack Locating in Residential Construction: Lean Approach
Shewchuk, J. P., & Guo, C. J. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000520 · Cited by 48
The impact of product choice on lean homebuilding
Nahmens, I., & Mullens, M. A. (2009) · Construction Innovation · doi:10.1108/14714170910931561 · Cited by 47
Potential of Poka-Yoke Devices to Reduce Variability in Construction
dos Santos, A., & Powell, J. A. (1999) · Cited by 42
The impact of Kaizen on safety in modular home manufacturing
James, J., Ikuma, L. H., Nahmens, I., & Aghazadeh, F. (2013) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-013-5315-0 · Cited by 42
Coordination and waste in industrialised housing
Sandberg, E., & Bildsten, L. (2011) · Construction Innovation · doi:10.1108/14714171111104646 · Cited by 28
(2008) · RMIT Research Repository (RMIT University Library) · Cited by 22
Improving Productivity through Mistake-proofing of Construction Processes
Sadri, R., Taheri, P., Azarsa, P., & Ghavam, H. (2011) · Cited by 17
Kaizen and Job Satisfaction- A Case Study in Industrialized Homebuilding
Nahmens, I., Ikuma, L. H., & Khot, D. (2012) · Civil War Book Review · Cited by 11
Popescu, D. (2015) · Management and Production Engineering Review · doi:10.1515/mper-2015-0005 · Cited by 5
Guo, J. L., Teng, J. Y., Li, S. Q., Wan, D. Y., & Jiang, X. (2012) · Advanced materials research · doi:10.4028/www.scientific.net/amr.621.375 · Cited by 4
Cited by
Blockchain-Enabled IoT-BIM Platform for Supply Chain Management in Modular Construction
Li, X., Lu, W., Xue, F., Wu, L., Zhao, R., Lou, J., & Xu, J. (2022) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002229 · Cited by 241
“To improve these issues, modular construction has been adopted worldwide, such as in Singapore (Hwang et al., 2018), UK (Innella et al., 2019), Canada (Liu et al., 2019), United States (Ramaji and Ali, 2016), Australia (Thai et al., 2020), and China (Liu et al., 2017).”
Hussein, M., Eltoukhy, A. E. E., Karam, A., Shaban, I. A., & Zayed, T. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.127503 · Cited by 209
A study of literature in modular integrated construction - Critical review and future directions
Abdelmageed, S., & Zayed, T. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.124044 · Cited by 190
Metadata
- Authors
- Innella, F., Arashpour, M., & Bai, Y.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2019-12
- Volume
- 145
- Issue
- 12
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2975229532
- Cited by
- 180
- References
- 77
- FWCI
- 13.97
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.