Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
Abstract
As a result of the loss of financial resources and the need to optimize projects, academics, politicians, and the construction industry have become increasingly aware of the challenges presented by the frequent time and cost overruns and reduced quality of construction projects. The purpose of this study was to analyze the factors that project managers experience as having the greatest effect on time, cost, and quality, and to discover whether the effects of these factors are significantly different from each other. A questionnaire with 26 factors identified from interviews was sent to the full population of publicly employed project managers. Factors were ranked using the relative importance index and tested for significant differences using Friedman’s test. Wilcoxon’s test was used in a post-hoc analysis. From the findings it was determined that the most influential factor for time is unsettled or lack of project funding; for cost, errors or omissions in consultant material; and for quality, errors or omissions in construction work. The main conclusion of this research is that project schedule, budget, and quality level are affected in significantly different ways. Therefore, a project manager cannot handle such critical issues by focusing only on schedule or budget complications; nor can he or she assume that time, cost, and quality are equally affected.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Discovering Statistics Using SPSS
Field, A. P., & Miles, J. N. V. (2000) · Medical Entomology and Zoology · Cited by 28,265
Research methods for business: A skill building approach
(1993) · Long Range Planning · doi:10.1016/0024-6301(93)90168-f · Cited by 16,985
Statistical Methods for Psychology.
Gudgeon, A. C., & Howell, D. C. (1994) · The Statistician · doi:10.2307/2348956 · Cited by 8,278
Nonparametric Statistical Methods
(1999) · Technometrics · doi:10.1080/00401706.1999.10485954 · Cited by 6,090
A framework for quality management research and an associated measurement instrument
Flynn, B. B., Schroeder, R. G., & Sakakibara, S. (1994) · Journal of Operations Management · doi:10.1016/s0272-6963(97)90004-8 · Cited by 1,966
Designing and Conducting Survey Research: A Comprehensive Guide
Rea, L. M., & Parker, R. (1992) · Cited by 1,761
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705
Empirical research methods in operations management
Flynn, B. B., Sakakibara, S., Schroeder, R. G., Bates, K. A., & Flynn, E. J. (1990) · Journal of Operations Management · doi:10.1016/0272-6963(90)90098-x · Cited by 1,634
Survey research in operations management: a process‐based perspective
Forza, C. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210414310 · Cited by 1,610
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
Metadata
- Authors
- Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D.
- Venue
- Journal of Management in Engineering
- Published
- 2016-01
- Volume
- 32
- Issue
- 1
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2155576734
- Cited by
- 365
- References
- 57
- FWCI
- 21.61
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000391
- The paper
- Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2016). Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000391
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.