CoChat

Kaizen costing for lean manufacturing: a case study

Modarress, B., Ansari *, A., Lockwood, D. L. · 2005 · International Journal of Production Research
Cited by 116

The DOI matches its Crossref record.

Abstract

In the past decade due to increasing global competition US firms have radically changed their manufacturing practices to improve their competitiveness. In pursuing this goal they have adopted a number of advanced techniques, such as just-in-time, total quality management, lean manufacturing, flexible manufacturing systems, process improvement, and design for manufacturability, to name a few. The objectives of all these programmes have been to reduce cost, improve quality, reduce cycle time, and increase flexibility on the factory floor. Support systems such as finance and cost management, however, have generally not kept pace with the level of corresponding operational changes being implemented. This paper presents a case study of kaizen costing as practised by Boeing Commercial Airplane Company, IRC Division. The purpose of this study is to describe a method used to set kaizen costs which will provide relevant cost data to support lean production decisions that would be useful to practitioners.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/00207540500034174

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 116

Metadata

Authors
Modarress, B., Ansari *, A., & Lockwood, D. L.
Venue
International Journal of Production Research
Published
2005-05
Volume
43
Issue
9
Pages
1751-1760
ISSN
  • 0020-7543 (ISSN-L)
  • 1366-588X
OpenAlex
W2057061859
Cited by
116
References
0
FWCI
7.88
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Kaizen costing for lean manufacturing: a case study. https://app.cochat.ai/papers/10.1080/00207540500034174
The paper
Modarress, B., Ansari *, A., & Lockwood, D. L. (2005). Kaizen costing for lean manufacturing: a case study. International Journal of Production Research. https://doi.org/10.1080/00207540500034174

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.