Multi-objective genetic algorithm for energy-efficient job shop scheduling
Open accessThe DOI matches its Crossref record; 17 of the 17 references it cites were found in a registry or an index.
Abstract
The paper investigates the effects of production scheduling policies aimed towards improving productive and environmental performances in a job shop system. A green genetic algorithm allows the assessment of multi-objective problems related to sustainability. Two main considerations have emerged from the application of the algorithm. First, the algorithm is able to achieve a semi-optimal makespan similar to that obtained by the best of other methods but with a significantly lower total energy consumption. Second, the study demonstrated that the worthless energy consumption can be reduced significantly by employing complex energy-efficient machine behaviour policies.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A fast and elitist multiobjective genetic algorithm: NSGA-II
Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.996017 · Cited by 50,053 · cited 2×
“The new GGA has been built by merging, tweaking and upgrading two of the current state-of-the-art GAs [NSGA-II (Deb et al. 2002) and SPEA-II (Zitzler, Laumanns, and Thiele 2001)] in order to create a new algorithm able to cope with a multi-objective job shop optimisation problem with both productivity and environmenta…”
MethodDensity Estimation for Statistics and Data Analysis
Silverman, B. W. (2018) · Routledge eBooks · doi:10.1201/9781315140919 · Cited by 15,796
Density Estimation for Statistics and Data Analysis
(1986) · Springer eBooks · doi:10.1007/978-1-4899-3324-9 · Cited by 8,525
Scheduling: Theory, Algorithms, and Systems
(1996) · IIE Transactions · doi:10.1080/15458830.1996.11770714 · Cited by 6,210
SPEA2: Improving the strength pareto evolutionary algorithm
Zitzler, E., Laumanns, M., & Thiele, L. (2001) · doi:10.3929/ethz-a-004284029 · Cited by 5,008
Probabilistic Learning Combinations of Local Job-Shop Scheduling Rules
Fisher, H. F. (1963) · Medical Entomology and Zoology · Cited by 729
A hybrid genetic algorithm for the job shop scheduling problem
Gonçalves, J. F., Mendes, J. J. D. M., & Resende, M. G. C. (2004) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.03.012 · Cited by 715
Operational methods for minimization of energy consumption of manufacturing equipment
Mouzon, G., Yildirim, M. B., & Twomey, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701450013 · Cited by 597
Multi-objective meta-heuristics: An overview of the current state-of-the-art
Jones, D. F., Mirrazavi, S. K., & Tamiz, M. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(01)00123-0 · Cited by 567 · cited 1×
“However, pure numbers have only a relative importance with respect to the ratios between the different power requirements, which have been derived by studying different papers, such as Jones, Mirrazavi, and Tamiz (2002), Zitzler, Laumanns, and Thiele (2001) and Pinedo (2012).”
BackgroundA new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
Fang, K., Uhan, N., Zhao, F., & Sutherland, J. W. (2011) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2011.08.004 · Cited by 552 · cited 1×
“Fang et al. (2011) developed yet another flow shop model with three different objectives: makespan (MKS), peak total power consumption and carbon footprint.”
Method
Cited by
Zhang, R., & Chiong, R. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.09.097 · Cited by 344
Lu, C., Gao, L., Li, X., Pan, Q., & Wang, Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.01.011 · Cited by 292
Energy management in manufacturing: From literature review to a conceptual framework
May, G., Stahl, B., Taisch, M., & Kiritsis, D. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.10.191 · Cited by 281
Self-citationA review of energy-efficient scheduling in intelligent production systems
Gao, K., Huang, Y., Sadollah, A., & Wang, L. (2020) · Complex & Intelligent Systems · doi:10.1007/s40747-019-00122-6 · Cited by 274
Tang, D., Dai, M., Salido, M. A., & Giret, A. (2016) · Computers in Industry · doi:10.1016/j.compind.2015.10.001 · Cited by 262
Lei, D., Li, M., & Wang, L. (2019) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2018.2796119 · Cited by 196
“[32] proposed a”
Zhang, B., Pan, Q.-K., Gao, L., Meng, L.-L., Li, X.-Y., & Peng, K.-K. (2020) · IEEE Transactions on Systems, Man, and Cybernetics: Systems · doi:10.1109/tsmc.2019.2916088 · Cited by 176
“In the literature, energy-efficient manufacturing operations can be achieved by optimizing machine parameters [13], [14], production scheduling [15], [16], designing process planning [17], and optimizing the workshop layout [18].”
Lei, D., Zheng, Y., & Guo, X. (2017) · International Journal of Production Research · doi:10.1080/00207543.2016.1262082 · Cited by 174
“May et al. (2015) proposed a multi-objective GA for energy-efficient job shop scheduling.”
Background
Metadata
- Authors
- May, G., Stahl, B., Taisch, M., & Prabhu, V.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2015-01-29
- Volume
- 53
- Issue
- 23
- Pages
- 7071-7089
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2024983677
- Cited by
- 222
- References
- 17
- FWCI
- 29.87
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.