Disassembly line balancing problem: a review of the state of the art and future directions
Open accessThe DOI matches its Crossref record; 31 of the 31 references it cites were found in a registry or an index.
Abstract
The disassembly line balancing (DLB) problem assigns the set of tasks to each workstation for each product to be disassembled and aims at attaining several objectives, such as minimising the number of workstations, ensuring similar idle time at each workstation and removing hazardous parts/highly demanded components at the earliest moments possible. Over the past two decades, the DLB problem and its variants have grown ever more popular for researchers and practitioners of environmentally conscious manufacturing. Yet, the problem characteristics and assumptions vary widely and there is no literature review to classify the existing articles accordingly. Hence, a comprehensive literature review of recent and state-of-the-art papers is vital to draw a framework of the past, and to shed light on future directions. To do so, 116 studies published in proceedings and journals since 1999 are selected and reviewed. The papers are then analysed and categorised to construct a useful foundation of past research. Finally, trends and gaps in the literature are identified to clarify and to suggest future research opportunities.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
ARPN Journal of Engineering and Applied Sciences
(2023) · ARPN Journal of Engineering and Applied Sciences · doi:10.59018/arpn · Cited by 2,147
Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future
Govindan, K., Soleimani, H., & Kannan, D. (2015) · European Journal of Operational Research · doi:10.1016/j.ejor.2014.07.012 · Cited by 1,963 · cited 2×
“According to Govindan, Soleimani, and Kannan (2015), content analysis and description of research methodology should include four steps: material collection, descriptive analysis, category selection and material evaluation.”
BackgroundMethodProceedings of IEEE International Conference on Systems, Man and Cybernetics
(1994) · Proceedings of IEEE International Conference on Systems, Man and Cybernetics · doi:10.1109/icsmc.1994.399796 · Cited by 1,341
Issues in environmentally conscious manufacturing and product recovery: a survey
Gungor, A., & Gupta, S. M. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00167-9 · Cited by 1,107 · cited 19×
“…(2003); McGovern, Gupta, and Kamarthi (2003); Kizilkaya and Gupta (2004); Bentaha et al. (2014d, 2014b, 2014a, 2014e) Easily accessible workpieces 3 Güngör and Gupta (1999b); Güngör et al. (2000); Gupta and Güngör (2001) Quantity of parts in incoming products 3 Güngör and Gupta (2001);…”
BackgroundInfluentialSelf-citationIlgin, M. A., & Gupta, S. M. (2010) · Journal of Environmental Management · doi:10.1016/j.jenvman.2009.09.037 · Cited by 1,015 · cited 6×
“Güngör and Gupta (1999c) and Ilgin and Gupta (2010a) provided excellent and comprehensive literature reviews of the entire ‘environmentally conscious manufacturing and product recovery’ area.”
BackgroundMethodSelf-citationComputer Integrated Manufacturing Systems
Sdol, E. (2009) · Cited by 930
A classification of assembly line balancing problems
Boysen, N., Fliedner, M., & Schöll, A. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.10.010 · Cited by 888 · cited 2×
“The DLB problem is somewhat related to assembly line balancing (ALB) and has been attracting interest from the field of reverse logistics in recent years (Boysen, Fliedner, and Scholl 2007).”
BackgroundMethodInternational Journal of Supply Chain Management
(2023) · International Journal of Supply Chain Management · doi:10.59160/ijscm · Cited by 799
Quantitative models for managing supply chain risks: A review
Fahimnia, B., Tang, C. S., Davarzani, H., & Sarkis, J. (2015) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.04.034 · Cited by 491 · cited 1×
“It is known that the Google-scholar database is more comprehensive than the Web of Science and Scopus databases (Fahimnia et al. 2015).”
BackgroundDisassembly sequencing: A survey
Lambert, A. J. D. (2003) · International Journal of Production Research · doi:10.1080/0020754031000120078 · Cited by 382 · cited 1×
“On the other hand, disassembly sequencing seeks a feasible/optimal order in which the disassembly tasks are processed (Lambert 2003).”
BackgroundDisassembly line in product recovery
Güngör, A., & Gupta, S. M. (2002) · International Journal of Production Research · doi:10.1080/00207540210135622 · Cited by 288 · cited 19×
“…(2017); Habibi et al. (2017); Jia and Shuwei (2017); Ren et al. (2017, 2018); Xiao and Nie (2017); Xiao et al. (2017) Minimisation of idle times Güngör and Gupta (1999b, 2002); Güngör et al. (2000); Gupta and Güngör (2001); Tang, Zhou, and Caudill (2001); McGovern and Gupta (2003a, 2003b,…”
BackgroundMethodSelf-citationGrella, M., Gallart, M., Marucco, P., Balsari, P., & Gil, E. (2017) · Sustainability · doi:10.3390/su9050728 · Cited by 281
Balancing two-sided assembly lines: a case study
Bartholdi, J. J. (1993) · International Journal of Production Research · doi:10.1080/00207549308956868 · Cited by 267 · cited 1×
“To overcome the capacity problem, disassembly lines can also be placed two-sided in which products flow along a production line with workstations on both sides of the line (Bartholdı 1993).”
BackgroundAgrawal, S., & Tiwari, M. K. (2008) · International Journal of Production Research · doi:10.1080/00207540600943985 · Cited by 252 · cited 17×
“…random variables with known and normal probability distributions by Kekre et al. (2003), Ranky et al. (2003), Kizilkaya and Gupta (2004, 2005), Agrawal and Tiwari (2008), Karadağ and Türkbey (2013), Bentaha et al. (2013a, 2013b, 2013c, 2013d, 2013e, 2014a, 2014b, 2014c, 2014d, 2014e, 2015a,…”
BackgroundInfluentialBiomass supply chain network design: An optimization-oriented review and analysis
Ghaderi, H., Pishvaee, M. S., & Moini, A. (2016) · Industrial Crops and Products · doi:10.1016/j.indcrop.2016.09.027 · Cited by 244
Koc, A., Sabuncuoğlu, İ., & Erel, E. (2009) · IIE Transactions · doi:10.1080/07408170802510390 · Cited by 229 · cited 11×
“…et al. (2013); Özceylan and Paksoy (2014b, 2014c); Kalayci et al. (2015b); Seidi and Saghari (2016); Zhang et al. (2017) Exact Solution approaches (Koç, Sabuncuoğlu, and Erel 2009); Bentaha et al. (2014b, 2014d); Duta, Caciula, and Patic (2016) Simulation Approaches Kekre et al. (2003); Ranky…”
BackgroundMethodInfluentialLinear programming in disassembly/clustering sequence generation
Lambert, A. J. D. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00162-x · Cited by 196 · cited 1×
“Güngör and Gupta (2002) GU8T8P 8 10 8 10 2 0 Lambert (1999); Lambert and Gupta (2005b) LA20T10P 20 25 10 5 8 5 LA20T24P 20 25 24 5 8 5 LA25T25P 25 27 25 45 0 0 LA30T10P 30 49 10 16 11 10 LA30T29P 30 49 29 16 11 10 Altekin, Kandiller, and Ozdemirel (2008) Altekin, Bayındır, and Gümüşkaya…”
Bentaha, M. L., Battaïa, O., & Dolgui, A. (2015) · International Journal of Production Research · doi:10.1080/00207543.2014.961212 · Cited by 181 · cited 23×
“…2014e, 2014c, 2015b); Habibi et al. (2014) Flashlight 7/10 Time Paksoy et al. (2013); Özceylan and Paksoy (2014b, 2014c); Özceylan, Paksoy, and Bektaş (2014); Bentaha, Battaïa, and Dolgui (2015a); Mete et al. (2016b) Piston and connecting rod 16/25 Time, revenue, hazardous Bentaha et al. (2013a,…”
BackgroundMethodInfluentialÖzceylan, E., Paksoy, T., & Bektaş, T. (2014) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2013.11.001 · Cited by 171 · cited 4×
“…Paksoy et al. (2013); Bentaha et al. (2013c); Liu, Chen, and Huang (2013); Pehlivan, Özceylan, and Paksoy (2013); Minca, Filipescu, and Voda (2014); Özceylan, Paksoy, and Bektaş (2014); Habibi et al. (2014); Hezer and Kara (2015); Kalaycılar, Azizoğlu, and Yeralan (2016); Mete et al. (2016a,…”
BackgroundSelf-citationA sample average approximation method for disassembly line balancing problem under uncertainty
Bentaha, M. L., Battaïa, O., & Dolgui, A. B. (2014) · Computers & Operations Research · doi:10.1016/j.cor.2014.05.006 · Cited by 150 · cited 25×
“…Filip, and Caciula (2008); Özceylan and Paksoy (2013, 2014a, 2014b, 2014c); Pehlivan, Özceylan, and Paksoy (2013); Özceylan, Paksoy, and Bektaş (2014); Bentaha et al. (2014d, 2015a, 2015b); Kannan et al. (2017) Heuristic Güngör and Gupta (1999a, 1999b, 2001, 2002); Güngör et al. (2000); Gupta and…”
BackgroundMethodInfluentialMulti-objective optimization of stochastic disassembly line balancing with station paralleling
Aydemir-Karadag, A., & Türkbey, O. (2013) · Computers & Industrial Engineering · doi:10.1016/j.cie.2013.03.014 · Cited by 146 · cited 8×
“…2014a, 2014b, 2014c, 2014e); Ren et al. (2017) (Continued) Smoothing workload McGovern and Gupta (2004, 2015); Ding et al. (2010a); Wang et al. (2011); Karadağ and Türkbey (2013); Paksoy et al. (2013); Bentaha et al. (2014d); Kalayci et al. (2015b); Seidi and Saghari (2016); Zhang et al. (2017)…”
BackgroundMethodInfluentialSolving large scale disassembly line balancing problem with uncertainty using reinforcement learning
Tüncel, E., Zeid, A., & Kamarthi, S. V. (2012) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-012-0711-0 · Cited by 143 · cited 12×
“…Avikal, Mishra, and Jain (2013b); Avikal et al. (2013c); Avikal, Mishra, and Jain (2014a); Avikal, Jain, and Mishra (2014b); Avikal et al. (2014c); Tuncel, Zeid, and Kamarthi (2014); Zhu, Zhang, and Hu (2014); Liu and Wang (2017); Jia and Shuwei (2017); Xiao and Nie (2017); Ren et al.…”
BackgroundMethodInfluentialTask-failure-driven rebalancing of disassembly lines
Altekin, F. T., & Akkan, C. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.616915 · Cited by 139 · cited 10×
“Later on, partial disassembly is handled by Altekin and Akkan (2012), Bentaha et al. (2013b, 2013c, 2013a, 2014a, 2014b, 2014e, 2014d, 2015b), Habibi et al. (2014); Kalaycılar, Azizoğlu, and Yeralan (2016), Altekin, Bayındır, and Gümüşkaya (2016), Altekin (2017) and Ren et al. (2017).”
BackgroundMethodInfluentialA tabu search algorithm for balancing a sequence-dependent disassembly line
Kalaycı, C. B., & Gupta, S. M. (2013) · Production Planning & Control · doi:10.1080/09537287.2013.782949 · Cited by 117 · cited 10×
“…Henrioud (2007); Duta, Filip, and Caciula (2008); Duta, Caciula, and Patic (2016); Ding et al. (2009, 2010b); Kalayci, Gupta, and Nakashima (2011); Kalayci and Gupta (2011a, 2013c, 2013d, 2013a, 2013e, 2013b, 2014, 2015a, 2015b, 2016); Bentaha et al. (2014c), Tuncel, Zeid, and Kamarthi (2014);…”
MethodSelf-citationProceedings of the 24th international conference on Computers and industrial engineering
Dessouky, M. I., Hindi, K. S., & Eid, M. (1999) · Annual Conference on Computers · Cited by 89
Second order conic approximation for disassembly line design with joint probabilistic constraints
Bentaha, M. L., Battaïa, O., Dolgui, A. B., & Hu, S. J. (2015) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.06.019 · Cited by 87 · cited 17×
“…Filip, and Caciula (2008); Özceylan and Paksoy (2013, 2014a, 2014b, 2014c); Pehlivan, Özceylan, and Paksoy (2013); Özceylan, Paksoy, and Bektaş (2014); Bentaha et al. (2014d, 2015a, 2015b); Kannan et al. (2017) Heuristic Güngör and Gupta (1999a, 1999b, 2001, 2002); Güngör et al. (2000); Gupta and…”
BackgroundMethodInfluentialRiggs, R. J., Battaïa, O., & Hu, S. J. (2015) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2014.11.002 · Cited by 85 · cited 7×
“…Liu, Chen, and Huang (2013); Tuncel, Zeid, and Kamarthi (2014); Zhu, Zhang, and Hu (2014); Kalayci et al. (2015b); Kalayci, Polat, and Gupta (2016); Riggs, Battaïa, and Hu (2015); Hao and Hasan (2016); Avikal (2016); Kannan et al. (2017); Liu and Wang (2017); Jia and Shuwei (2017); Xiao and Nie…”
BackgroundInfluentialDealing with uncertainty in disassembly line design
Bentaha, M. L., Battaïa, O., Dolgui, A. B., & Hu, S. J. (2014) · CIRP Annals · doi:10.1016/j.cirp.2014.03.004 · Cited by 78 · cited 26×
“…Filip, and Caciula (2008); Özceylan and Paksoy (2013, 2014a, 2014b, 2014c); Pehlivan, Özceylan, and Paksoy (2013); Özceylan, Paksoy, and Bektaş (2014); Bentaha et al. (2014d, 2015a, 2015b); Kannan et al. (2017) Heuristic Güngör and Gupta (1999a, 1999b, 2001, 2002); Güngör et al. (2000); Gupta and…”
BackgroundMethodInfluentialIEEE International Symposium on Electronics and the Environment
(2004) · IEEE International Symposium on Electronics and the Environment (ISEE) · doi:10.1109/isee.2004.1299672 · Cited by 68
An Entropy-Based Adaptive Hybrid Particle Swarm Optimization for Disassembly Line Balancing Problems
Xiao, S., Wang, Y., Yu, H., & Nie, S. (2017) · Entropy · doi:10.3390/e19110596 · Cited by 49 · cited 8×
“…(2014); Altekin (2016); Altekin, Bayındır, and Gümüşkaya (2016); Jia and Shuwei (2017); Liu and Wang (2017); Ren et al. (2017); Xiao and Nie (2017); Xiao et al. (2017) 14/14 Time, demand Liu, Chen, and Huang (2013) 12/12 Material type, weight, recycling rate, CO2 rate, cost, time Igarashi,…”
BackgroundInfluentialAn agent-based collaborative platform for the design of assembly lines
Papakostas, N., Pintzos, G., Giannoulis, C., & Chryssolouris, G. (2015) · International Journal of Computer Integrated Manufacturing · doi:10.1080/0951192x.2015.1066862 · Cited by 12 · cited 2×
“…context; (xii) proposal of a collaborative planning structure which manages the information shared through the cloud computing (see the study by Papakostas et al. (2016) for assembly lines) and finally (xiii) simultaneous balancing of ALB and DLB problems should be discussed for future studies.”
Background
Cited by
Or, T., Gourley, S. W. D., Kaliyappan, K., Yu, A., & Chen, Z. (2020) · Carbon Energy · doi:10.1002/cey2.29 · Cited by 559
Kalayci, C. B., Ertenlice, O., & Akbay, M. A. (2019) · Expert Systems with Applications · doi:10.1016/j.eswa.2019.02.011 · Cited by 182
Self-citationTask allocation and planning for product disassembly with human–robot collaboration
Lee, M.-L., Behdad, S., Liang, X., & Zheng, M. (2022) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2021.102306 · Cited by 169
Artificial Intelligence in Electric Vehicle Battery Disassembly: A Systematic Review
Ai, Z., Nee, A. Y. C., & Ong, S. K. (2024) · Automation · doi:10.3390/automation5040028 · Cited by 16
Metadata
- Authors
- Özceylan, E., Kalayci, C. B., Güngör, A., & Gupta, S. M.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2018-01-26
- Volume
- 57
- Issue
- 15-16
- Pages
- 4805-4827
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2789796155
- Cited by
- 220
- References
- 31
- FWCI
- 18.90
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.