Risk Modeling, Assessment, and Management
The DOI matches its Crossref record.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Managing Disruption Risks in Supply Chains
Kleindorfer, P. R., & Saad, G. H. (2005) · Production and Operations Management · doi:10.1111/j.1937-5956.2005.tb00009.x · Cited by 2,088
Maier, H. R., Kapelan, Z., Kasprzyk, J., Kollat, J., Matott, L. S., Cunha, M. C., Dandy, G. C., Gibbs, M. S., Keedwell, E., Marchi, A., et al. (2014) · Environmental Modelling & Software · doi:10.1016/j.envsoft.2014.09.013 · Cited by 657
Proactive planning for catastrophic events in supply chains
Knemeyer, A. M., Zinn, W., & Eroglu, C. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2008.06.002 · Cited by 566
Flood risk assessment and associated uncertainty
Apel, H., Thieken, A. H., Merz, B., & Blöschl, G. (2004) · Natural Hazards and Earth System Sciences · doi:10.5194/nhess-4-295-2004 · Cited by 536
Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000391 · Cited by 365
Probabilistic Risk Analysis and Terrorism Risk
Ezell, B. C., Bennett, S. P., Von Winterfeldt, D., Sokolowski, J., & Collins, A. J. (2010) · Risk Analysis · doi:10.1111/j.1539-6924.2010.01401.x · Cited by 264
Risk Filtering, Ranking, and Management Framework Using Hierarchical Holographic Modeling
Haimes, Y. Y., Kaplan, S., & Lambert, J. H. (2002) · Risk Analysis · doi:10.1111/0272-4332.00020 · Cited by 217
“Thus, by its nature and construction, the HHM methodology generates a comprehensive set of sources of risk, i.e., categories of risk scenarios, commonly in the order of hundreds of entries (Haimes 1998).”
BackgroundMethodInfluentialWillis, H., Morral, A., Kelly, T., & Medby, J. (2005) · RAND Corporation eBooks · doi:10.7249/mg388 · Cited by 212
Confronting the risks of terrorism: making the right decisions
John Garrick, B., Hall, J. E., Kilger, M., McDonald, J. C., O'Toole, T., Probst, P. S., Rindskopf Parker, E., Rosenthal, R., Trivelpiece, A. W., Van Arsdale, L. A., et al. (2004) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2004.04.003 · Cited by 204
Wei, W., Larrey-Lassalle, P., Faure, T., Dumoulin, N., Roux, P., & Mathias, J.-D. (2015) · Environmental Science & Technology · doi:10.1021/es502128k · Cited by 198
Risk Analysis and Risk Management in an Uncertain World1
Kunreuther, H. (2002) · Risk Analysis · doi:10.1111/0272-4332.00057 · Cited by 189
A Scenario-Based Multi-Objective Model for Multi-Stage Transmission Expansion Planning
Maghouli, P., Hosseini, S. H., Oloomi Buygi, M., & Shahidehpour, M. (2011) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2010.2048930 · Cited by 188
Empirical Framework for Characterizing Infrastructure Failure Interdependencies
McDaniels, T., Chang, S., Peterson, K., Mikawoz, J., & Reed, D. (2007) · Journal of Infrastructure Systems · doi:10.1061/(asce)1076-0342(2007)13:3(175 · Cited by 178
Adapting to the Impacts of Climate Change
OECD (2009) · OECD eBooks · doi:10.1787/9789264054950-8-en · Cited by 166
An online testing design choice typology towards cheating threat minimisation
Munoz, A., & Mackay, J. (2019) · Journal of University Teaching and Learning Practice · doi:10.53761/1.16.3.5 · Cited by 51
Risk Analysis of the Walkerton Drinking Water Crisis
Hipel, K. W., Zhao, N. Z., & Kilgour, D. M. (2003) · Canadian Water Resources Journal · doi:10.4296/cwrj2803395 · Cited by 17
RISK-BASED ASSESSMENT AND STRENGTHENING OF ELECTRIC POWER SYSTEMS SUBJECTED TO NATURAL HAZARDS
Salman, A. (2020) · doi:10.37099/mtu.dc.etdr/207 · Cited by 8
“Risk management can be summarized in three questions (Haimes, 2015; Ezell et al., 2000):”
Background
Metadata
- Authors
- Liu, S. T.
- Venue
- Technometrics
- Publisher
- Informa UK Limited
- Published
- 1999-11
- Volume
- 41
- Issue
- 4
- Pages
- 376-377
- ISSN
- 0040-1706 (ISSN-L)
- 1537-2723
- OpenAlex
- W4233748210
- Cited by
- 328
- References
- 0
- FWCI
- 12.55
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.