CoChat

Lowest price or value? Investigation of UK construction clients' tender selection process

Wong, Chee H., Holt, Gary D., Cooper, Patricia A. · 2000 · Construction Management and Economics
Cited by 177

The DOI matches its Crossref record.

Abstract

There is a growing urge for a shift from ‘lowest-price wins’ to ‘multi-criteria selection’ practices in the contractor selection process. The rationale is to achieve best value (for money) for the client. Earlier investigations have found that the tender price (i.e. capital cost) still dominates the final selection decision despite increased emphases on the need for contractor selection based on ‘value’. This paper provides insights into the evaluation of contractors' attributes, particularly for project-specific criteria (PSC), that is, criteria against which tendering contractors may be considered. The importance attached by clients to the ‘lowestprice wins’ philosophy is also reported. The perceived importance of PSC (i.e. their influence on final selection choice) is determined through a structured questionnaire survey of UK construction clients. The results show an increasing use of PSC. It is also found that ‘lowest-price’ is not now necessarily the client's principal selection criterion, but rather, the realization that cost has to be tempered with evaluation of PSC in any attempt to identify value for money.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/014461900433050

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

Metadata

Authors
Wong, C. H., Holt, G. D., & Cooper, P. A.
Venue
Construction Management and Economics
Published
2000-10
Volume
18
Issue
7
Pages
767-774
ISSN
  • 0144-6193 (ISSN-L)
  • 1466-433X
OpenAlex
W2124163021
Cited by
177
References
0
FWCI
4.68
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.