Comparing Procurement Methods for Design-Build Projects
The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
Abstract
The design-build delivery method is increasingly used in the United States due to numerous advantages it can offer a project. An important issue associated with design-build delivery is the procurement method used to select the design-build team. It is a critical decision that involves several key project team members, including the owner, designer, and contractor organizations, and requires the owner to carefully choose the design-build procurement method that will be used to select the team that will deliver the project. This research quantitatively analyzed the correlation between the design-build procurement method and the performance of the design-build project with regard to cost, time, and quality metrics. The procurement methods studied were sole source, qualifications-based, best value, and low bid selection. Data were collected through surveys from 76 design-build projects in the United States. Based on the patterns and relationships identified from these data, a better understanding of the procurement process and how it influences project performance is achieved. The impact of project-specific factors and guidelines are presented to assist owners in selecting the design-build team procurement method that responds to their project goals.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Mail and internet surveys : the tailored design method
Dillman, D. A. (2007) · Cited by 9,587
An Introduction to Statistical Methods and Data Analysis
(1994) · Technometrics · doi:10.1080/00401706.1994.10485832 · Cited by 5,346
Research Methods in Social Sciences.
Ravindhran, S. P., Nachmias, D., & Nachmias, C. (1977) · Contemporary Sociology · doi:10.2307/2064803 · Cited by 489
Critical Success Factors for Construction Projects
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1992)118:1(94 · Cited by 478
Framework of Success Criteria for Design/Build Projects
Chan, A. P. C., Scott, D. R., & Lam, E. W. M. (2002) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2002)18:3(120 · Cited by 455 · cited 1×
“A recent study on design-build projects indicated that objective success factors such as time, cost, profitability, and health and safety, in addition to quality are the main performance measures (Chan et al. 2002).”
BackgroundWhich contractor selection methodology?
Holt, G. D. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00035-5 · Cited by 358 · cited 2×
“Others have recommended that the selection should be composed of a two-step approach: prequalification and tenders evaluation (Holt 1998).”
BackgroundMethodFinal contractor selection using the analytical hierarchy process
Fong, P. S. W., & Choi, S. K.-Y. (2000) · Construction Management and Economics · doi:10.1080/014461900407356 · Cited by 335
Nonparametric Methods for Quantitative Analysis.
Gibbons, J. D. (1997) · Biometrics · doi:10.2307/2533133 · Cited by 325
Design and Build Project Success Factors: Multivariate Analysis
Chan, A. P. C., Ho, D. C. K., & Tam, C. M. (2001) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2001)127:2(93 · Cited by 316 · cited 1×
“Time and cost metrics were used to evaluate and measure project performance (Chan et al. 2001).”
MethodNonparametric Methods for Quantitative Analysis
Iman, R. L., & Gibbons, J. D. (1986) · Technometrics · doi:10.2307/1269085 · Cited by 187
Cited by
Eriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363
Circular public procurement through integrated contracts in the infrastructure sector
Lingegård, S., Havenvid, M. I., & Eriksson, P.-E. (2021) · Sustainability · doi:10.3390/su132111983 · Cited by 20
Metadata
- Authors
- El Wardani, M. A., Messner, J. I., & Horman, M. J.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2006-03
- Volume
- 132
- Issue
- 3
- Pages
- 230-238
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2006)132:3(230
- OpenAlex
- W2114797182
- Cited by
- 198
- References
- 13
- FWCI
- 7.19
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Comparing Procurement Methods for Design-Build Projects. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2006)132:3(230
- The paper
- El Wardani, M. A., Messner, J. I., & Horman, M. J. (2006). Comparing Procurement Methods for Design-Build Projects. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2006)132%3A3(230
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.