A proposal for construction project risk assessment using fuzzy logic
The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
Abstract
The construction industry is plagued by risk and often has suffered poor performance as a result. There are a number of risk management techniques available to help alleviate this, but usually these are based on operational research techniques developed in the 1960s, and for the most part have failed to meet the needs of project managers. In this paper, a hierarchical risk breakdown structure representation is used to develop a formal model for qualitative risk assessment. A common language for describing risks is presented which includes terms for quantifying likelihoods and impacts so as to achieve consistent quantification. The relationships between risk factors, risks and their consequences are represented on cause and effect diagrams. These diagrams and the concepts of fuzzy association and fuzzy composition are applied to identify relationships between risk sources and the consequences for project performance measures. A methodology for evaluating the risk exposure, considering the consequences in terms of time, cost, quality, and safety performance measures of a project based on fuzzy estimates of the risk components is presented.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,857
Fuzzy Sets and Fuzzy Logic: Theory and Applications
Klir, G. J., & Yuan, B. (1995) · Medical Entomology and Zoology · Cited by 6,240
Neural Networks and Fuzzy Systems
Kosko, B., & Burgess, J. C. (1998) · The Journal of the Acoustical Society of America · doi:10.1121/1.423096 · Cited by 2,356
Neural networks and fuzzy systems
Zambelli, S. (1993) · Journal of Economic Dynamics and Control · doi:10.1016/0165-1889(93)90010-p · Cited by 1,022
Expert Systems: Design and Development
Durkin, J., & Durkin, J. (1994) · Medical Entomology and Zoology · Cited by 582
Fuzzy sets and fuzzy logic: Theory and applications
Simon, D. (1996) · Control Engineering Practice · doi:10.1016/0967-0661(96)81492-4 · Cited by 537
Cox, E. (1994) · Cited by 516
Construction risk assessment by linguistics
Kangari, R., & Riggs, L. S. (1989) · IEEE Transactions on Engineering Management · doi:10.1109/17.18829 · Cited by 246
Pricing Construction Risk: Fuzzy Set Application
Paek, J. H., Lee, Y. W., & Ock, J. H. (1993) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1993)119:4(743 · Cited by 147
Contractor project risks contingency allocation using linguistic approximation
Tah, J. H. M., Thorpe, A., & McCaffer, R. (1993) · Computing Systems in Engineering · doi:10.1016/0956-0521(93)90052-x · Cited by 119
Self-citationRisk interdependencies and natural language computations
Wirba, E. N., Tah, J. H. M., & Howes, R. (1996) · Engineering Construction & Architectural Management · doi:10.1108/eb021034 · Cited by 73
Self-citationKangari, R. (1988) · Civil Engineering Systems · doi:10.1080/02630258808970516 · Cited by 47
Cited by
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 574
Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach
Xu, Y., Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., Wang, S. Q., & Ke, Y. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.006 · Cited by 428
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Using fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, I., Birgonul, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 374
Ameyaw, E. E., & Chan, A. P. C. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.02.041 · Cited by 265
Metadata
- Authors
- Tah, J. H. M., & Carr, V.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2000-06
- Volume
- 18
- Issue
- 4
- Pages
- 491-500
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2155467150
- Cited by
- 374
- References
- 13
- FWCI
- 3.51
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.