Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Concept of a Linguistic Variable and Its Application to Approximate Reasoning—I
Zadeh, L. A. (1975) · Information Sciences · doi:10.1016/0020-0255(75)90036-5 · Cited by 12,187
The concept of a linguistic variable and its application to approximate reasoning-III
Zadeh, L. A. (1975) · Information Sciences · doi:10.1016/0020-0255(75)90017-1 · Cited by 12,139
Multiple Attribute Decision Making
Hwang, C.-L., & Yoon, K. (1981) · Lecture Notes in Economics and Mathematical Systems · doi:10.1007/978-3-642-48318-9 · Cited by 8,526
Fuzzy Logic with Engineering Applications
Ross, T. J. (2010) · Wiley eBooks · doi:10.1002/9781119994374 · Cited by 6,597
Applications of the Extent Analysis Method on Fuzzy AHP
Chang, D.-Y. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00300-2 · Cited by 4,874
Project management — A managerial approach
(1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90451-7 · Cited by 1,547
Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP
Kutlu, A. C., & Ekmekçioğlu, M. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.06.044 · Cited by 594
Identifying elements of poor construction safety management in China
Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004) · Safety Science · doi:10.1016/j.ssci.2003.09.001 · Cited by 590
Application of a fuzzy based decision making methodology to construction project risk assessment
Zeng, J., An, M., & Smith, N. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.006 · Cited by 537
Fuzzy hierarchical TOPSIS for supplier selection
Wang, J.-W., Cheng, C., & Huang, K.-C. (2008) · Applied Soft Computing · doi:10.1016/j.asoc.2008.04.014 · Cited by 504
Research works printed but not linked: 13
- Shen, 2001, Risk assessment for construction joint ventures in China, Journal of Construction Engineering and Management, 127, 76, 10.1061/(ASCE)0733-9364(2001)127:1(76) · doi:10.1061/(asce)0733-9364(2001)127:1(76
- Abdou, 1996, Managing construction risks, Journal of Architectural Engineering, 2, 3, 10.1061/(ASCE)1076-0431(1996)2:1(3) · doi:10.1061/(asce)1076-0431(1996)2:1(3
- Perry, 1985, Risk and its management in construction projects, Proceedings of the Institution of Civil Engineering. Part I, 499, 10.1680/iicep.1985.859 · doi:10.1680/iicep.1985.859
- Kuchta, 2001, Use of fuzzy numbers in project risk (criticality) assessment, International Journal of Project Management, 19, 305, 10.1016/S0263-7863(00)00022-3 · doi:10.1016/s0263-7863(00)00022-3
- Ebrat, 2011, Risk assessment of construction projects using network based adaptive fuzzy system, International Journal of Academic Research, 3, 411
- Danila, 1999, Strategic evaluation and solution of R&D projects, R&D Management, 19, 47, 10.1111/j.1467-9310.1989.tb00615.x · doi:10.1111/j.1467-9310.1989.tb00615.x
- Torfi, 2010, Fuzzy AHP to determine the relative weights of evaluation criteria and fuzzy TOPSIS to rank the alternatives, Applied Soft Computing, 10, 20, 10.1016/j.asoc.2009.08.021 · doi:10.1016/j.asoc.2009.08.021
- Chen, 2011, Fuzzy MCDM approach for selecting the best environment-watershed plan, Applied Soft Computing, 11, 265, 10.1016/j.asoc.2009.11.017 · doi:10.1016/j.asoc.2009.11.017
- Kartam, 2001, Risk and its management in the Kuwaiti construction industry: a contractors’ perspective, International Journal of Project Management, 19, 325, 10.1016/S0263-7863(00)00014-4 · DOI · Paper page
- Barber, 2005, Understanding internally generated risks in projects, International Journal of Project Management, 23, 584, 10.1016/j.ijproman.2005.05.006 · DOI
- Yurdakul, 2005, Development of a performance measurement model for manufacturing companies using the AHP and TOPSIS approaches, International Journal of production Research, 43, 4609, 10.1080/00207540500161746 · doi:10.1080/00207540500161746
- Elías, 2011, Outlier analysis for plastic card fraud detection a hybridized and multi-objective approach, HAIS, 2, 1
- Taylan, 2011, Estimating the quality of process yield by fuzzy sets and systems, Expert Systems with Applications, 38, 12599, 10.1016/j.eswa.2011.04.048 · doi:10.1016/j.eswa.2011.04.048
Cited by
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
A review of fuzzy AHP methods for decision-making with subjective judgements
Liu, Y., Eckert, C. M., & Earl, C. (2020) · Expert Systems with Applications · doi:10.1016/j.eswa.2020.113738 · Cited by 1,079
A state-of the-art survey & testbed of fuzzy AHP (FAHP) applications
Kubler, S., Robert, J., Derigent, W., Voisin, A., & Le Traon, Y. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2016.08.064 · Cited by 441
Evaluating teaching performance based on fuzzy AHP and comprehensive evaluation approach
Chen, J.-F., Hsieh, H.-N., & Do, Q. H. (2015) · Applied Soft Computing · doi:10.1016/j.asoc.2014.11.050 · Cited by 408
Fuzzy AHP-TOPSIS approaches to prioritizing solutions for reverse logistics barriers
Sirisawat, P., & Kiatcharoenpol, T. (2018) · Computers & Industrial Engineering · doi:10.1016/j.cie.2018.01.015 · Cited by 309
Metadata
- Authors
- Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R.
- Venue
- Applied Soft Computing
- Publisher
- Elsevier BV
- Published
- 2014-04
- Volume
- 17
- Pages
- 105-116
- ISSN
- 1568-4946 (ISSN-L)
- OpenAlex
- W1994119659
- Cited by
- 574
- References
- 28
- FWCI
- 49.70
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. https://app.cochat.ai/papers/10.1016/j.asoc.2014.01.003
- The paper
- Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing. https://doi.org/10.1016/j.asoc.2014.01.003
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.