The DOI matches its Crossref record.
An empirical study of the benefits of construction partnering in Hong Kong
Abstract
Many construction companies have adopted partnering in their construction projects over the past 10–15 years due to favourable project outcomes achieved. Its use in construction projects has been increasing rapidly as its benefits become more apparent and pervasive. This paper reviews the partnering literature within the construction field and tries to portray the comprehensive picture of benefits for the partnering practice. Through partnering and the active involvement of all key project parties, the project is more likely to be completed within budget, on time, and with the least number of conflicts, claims and work defects. Also, this paper reports upon the findings of a questionnaire survey of partnering benefits in Hong Kong. Seventy‐eight project participants completed a questionnaire to indicate the relative importance of partnering benefits. The perceived benefits were measured and ranked from the perspectives of the client, contractor and consultant for cross‐comparison. The results revealed that ‘Improved relationship amongst project participants’, ‘Improved communication amongst project participants’ and ‘More responsive to the short‐term emergency, changing project or business needs’ were the most significant benefits derived from the use of partnering. More partnering arrangements should be actively introduced into the construction procurement process so that every party can enjoy the full benefits of partnering.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Osei-Kyei, R., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.008 · Cited by 803
Self-citationEriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363
Partnering relationships in construction: A literature review
Bygballe, L. E., Jahre, M., & Swärd, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.08.002 · Cited by 278
EXPLORING CRITICAL SUCCESS FACTORS FOR STAKEHOLDER MANAGEMENT IN CONSTRUCTION PROJECTS
Yang, J., Shen, G. Q., Ho, M., Drew, D. S., & Chan, A. P. C. (2009) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/1392-3730.2009.15.337-348 · Cited by 264
Self-citationRisk Assessment at the Design Phase of Construction Projects in Ghana
Awuni, M. A. (2019) · Journal of Building Construction and Planning Research · doi:10.4236/jbcpr.2019.72004 · Cited by 5
Metadata
- Authors
- Chan, A. P. C., Chan, D. W. M., & Ho, K. S. K.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2003-07
- Volume
- 21
- Issue
- 5
- Pages
- 523-533
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2027925460
- Cited by
- 197
- References
- 0
- FWCI
- 4.83
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: An empirical study of the benefits of construction partnering in Hong Kong. https://app.cochat.ai/papers/10.1080/0144619032000056162
- The paper
- Chan, A. P. C., Chan, D. W. M., & Ho, K. S. K. (2003). An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics. https://doi.org/10.1080/0144619032000056162
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.