A competency‐based performance model for construction project managers
The DOI matches its Crossref record; 15 of the 15 references it cites were found in a registry or an index.
Abstract
The role of competency‐based performance management is growing in significance in many industries and sectors. Unlike functional competences, which measure performance against predetermined minimum occupational standards, competency‐based systems are founded on the key behavioural competencies that underlie superior levels of performance. In order to identify the key behaviours leading to performance excellence amongst construction project managers, in‐depth behavioural event interviews were used in which managers were asked to recount critical management incidents, decisions and actions from which their behavioural competencies could be identified. By delineating the sample according to their performance against a range of role‐based criteria, the competencies defining superior management performance were determined. Statistical techniques were then used to develop a model that can be used to predict likely employee performance, which was subsequently validated on a second criterion sample. The research identifies 12 core behavioural competencies that underpin effective project management performance, of which two – ‘composure’ and ‘team leadership’ – were the most predictive. The paper explores the potential role and application of the framework in the drive for performance excellence within the industry, such as in selection, management development, succession planning, performance management and team deployment. It is argued that it offers an innovative alternative to normative micro‐competence‐based approaches that do little to engender performance excellence amongst the industry's key managers and professionals.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1995) · Medical Entomology and Zoology · Cited by 7,217
Testing for competence rather than for "intelligence."
McClelland, D. C. (1973) · American Psychologist · doi:10.1037/h0034092 · Cited by 4,425 · cited 1×
“The methodology used to support this programme of research took its lead from the established McBer job competency assessment process initially developed for industrial psychology by McClelland (1973).”
MethodA Handbook of Human Resource Management Practice
Armstrong, M. (1999) · Cited by 3,342
Competence at Work: Models for Superior Performance
Spencer, L. M., & Spencer, S. M. (1993) · Cited by 3,158
The Competent Manager: A Model for Effective Performance
Boyatzis, R. E. (1982) · Andalas University Repository (Andalas University) · Cited by 2,533
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359 · cited 1×
“Moreover, programme and financial metrics are based on estimates made at a time when the least is known about the project, whilst quality is an emergent property of different peoples’ attitudes and beliefs that can change over the project life-cycle (Atkinson, 1999).”
BackgroundHuman Resource Management: Theory and Practice
(1999) · Work Study · doi:10.1108/ws.1999.07948dae.005 · Cited by 879 · cited 1×
“The case for competency-based performance management in construction Most companies now accept the importance of utilizing and developing the potential of employees in order to enhance their competitive capabilities (Bratton and Gold, 1999).”
BackgroundPerformance management in construction: a conceptual framework
Kagioglou, M., Cooper, R., & Aouad, G. F. (2001) · Construction Management and Economics · doi:10.1080/01446190010003425 · Cited by 605 · cited 1×
“Known as ‘lagging’ indicators, these measures are often linked to traditional measures outturn performance of projects (Kagioglou et al., 2001).”
BackgroundTowards an applied theory of experiential learning
Kolb, D. (1975) · Medical Entomology and Zoology · Cited by 466
Personnel and Human Resource Management
Cole, G. L. (2002) · Cited by 354
Cited by
Leadership competency profiles of successful project managers
Müller, R., & Turner, R. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.09.003 · Cited by 758
Zuo, J., Zhao, X., Nguyen, Q. B. M., Ma, T., & Gao, S. (2018) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-01-2016-0016 · Cited by 172
Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector
Mahamadu, A.-M., Manu, P., Booth, C., Olomolaiye, P., Coker, A., Ibrahim, A., & Lamond, J. (2018) · Journal of Engineering, Design and Technology · doi:10.1108/jedt-09-2017-0089 · Cited by 18
Metadata
- Authors
- Dainty, A. R. J., Cheng, M., & Moore, D. R.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2004-10
- Volume
- 22
- Issue
- 8
- Pages
- 877-886
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W1964591834
- Cited by
- 164
- References
- 15
- FWCI
- 2.71
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: A competency‐based performance model for construction project managers. https://app.cochat.ai/papers/10.1080/0144619042000202726
- The paper
- Dainty, A. R. J., Cheng, M., & Moore, D. R. (2004). A competency‐based performance model for construction project managers. Construction Management and Economics. https://doi.org/10.1080/0144619042000202726
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.