Implementing a waste management plan during the construction phase of a project: a case study
The DOI matches its Crossref record.
Abstract
The construction industry in Australia contributes approximately 15%, by volume, of all solid waste disposed in landfills each year. Similar volumes have been recorded in other countries. The Australian government, in common with many other countries, has legislation in place to reduce landfill requirements by 50% by the year 2000. As part of this programme an Australian division of a multinational construction company has developed a company policy with the aim of managing waste generated on site and, thereby, reducing the amount deposited in landfill sites. The programme has been supported by the Victorian Recycling and Resource Recovery Council. The first implementation of this policy was at the Dandenong Police and Court Complex in Melbourne. The effects of the programme have been compared against a similar project built concurrently. The results of the trial revealed substantial savings. A total volume of 15% less waste was generated on site prior to recycling and 43% less waste went to landfill. Cost savings of 50% were made in terms of waste handling charges. The savings resulted almost entirely from site based strategies for handling waste.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Removal of cement mortar remains from recycled aggregate using pre-soaking approaches
Tam, V. W. Y., Tam, C. M., & Le, K. N. (2007) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2006.05.012 · Cited by 732
Architects’ perspectives on construction waste reduction by design
Osmani, M., Glass, J., & Price, A. D. F. (2008) · Waste Management · doi:10.1016/j.wasman.2007.05.011 · Cited by 496
Quantifying construction and demolition waste: An analytical review
Wu, Z., Yu, A. T. W., Shen, L., & Liu, G. (2014) · Waste Management · doi:10.1016/j.wasman.2014.05.010 · Cited by 400
Implementation of environmental management in the Hong Kong construction industry
Shen, L. Y., & Tam, V. W. Y. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00054-0 · Cited by 367
A framework for understanding waste management studies in construction
Lu, W., & Yuan, H. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.018 · Cited by 353
Metadata
- Authors
- Mcdonald, B., & Smithers, M.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 1998-01
- Volume
- 16
- Issue
- 1
- Pages
- 71-78
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2122472705
- Cited by
- 157
- References
- 0
- FWCI
- 4.45
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Implementing a waste management plan during the construction phase of a project: a case study. https://app.cochat.ai/papers/10.1080/014461998372600
- The paper
- Mcdonald, B., & Smithers, M. (1998). Implementing a waste management plan during the construction phase of a project: a case study. Construction Management and Economics. https://doi.org/10.1080/014461998372600
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.