Cost Overruns and Demand Shortfalls in Urban Rail and Other Infrastructure
Open accessThe DOI matches its Crossref record; 20 of the 20 references it cites were found in a registry or an index.
Abstract
Risk, including economic risk, is increasingly a concern for public policy and management. The possibility of dealing effectively with risk is hampered, however, by lack of a sound empirical basis for risk assessment and management. This article demonstrates the general point for cost and demand risks in urban rail projects. The article presents empirical evidence that allow valid economic risk assessment and management of urban rail projects, including benchmarking of individual or groups of projects. Benchmarking of the Copenhagen Metro is presented as a case in point. The approach developed is proposed as a model for other types of policies and projects in order to improve economic and financial risk assessment and management in policy and planning.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Megaprojects and Risk: An Anatomy of Ambition
Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9781107050891 · Cited by 2,415
Self-citationUnderestimating Costs in Public Works Projects:Error or Lie?
Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002) · Journal of the American Planning Association · doi:10.1080/01944360208976273 · Cited by 1,046 · cited 13×
“The labor with developing such checks and balances has been begun elsewhere (Bruzilius et al., 1998; Flyvbjerg et al., 2002, 2003, 2005; Flyvbjerg & COWI, 2004).”
BackgroundMethodInfluentialSelf-citationWorld development report 1994 : infrastructure for development
Lanjouw, P., Besant-Jones, J. E., Estache, A., Kessides, C., Pritchett, L. H., Mody, A., & Ingram, G. K. (1994) · Dépôt institutionnel de l'Université libre de Bruxelles (Université Libre de Bruxelles) · Cited by 937
How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation
Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2005) · Journal of the American Planning Association · doi:10.1080/01944360508976688 · Cited by 731 · cited 15×
“The labor with developing such checks and balances has been begun elsewhere (Bruzilius et al., 1998; Flyvbjerg et al., 2002, 2003, 2005; Flyvbjerg & COWI, 2004).”
BackgroundMethodInfluentialSelf-citationThe Anatomy of Major Projects: A Study of the Reality of Project Management
Morris, P. W. G., & Hough, G. H. (1988) · Medical Entomology and Zoology · Cited by 696
Bank, W. (1994) · doi:10.1596/978-0-1952-0992-1 · Cited by 643
Hall, P. (1980) · Futures · doi:10.1016/s0016-3287(80)80006-1 · Cited by 580
Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures
Flyvbjerg, B. (2007) · Environment and Planning B: Planning and Design · doi:10.1068/b32111 · Cited by 521 · cited 1×
“As part of this exercise tests are carried out of how data fit the possibility that urban rail forecasts are strategically and deliberately misleading, that is, that forecast costs and revenues are produced, not as best estimates of what the future will bring if projects are built, but instead as misrepresentations co…”
BackgroundSelf-citationMega-projects: the changing politics of urban public investment
(2004) · Choice Reviews Online · doi:10.5860/choice.41-3716 · Cited by 485
Big decisions, big risks. Improving accountability in mega projects
Bruzelius, N., Flyvbjerg, B., & Rothengatter, W. (2002) · Transport Policy · doi:10.1016/s0967-070x(02)00014-8 · Cited by 220 · cited 1×
“The work with developing procedures and institutional designs that, if implemented, would strengthen accountability towards risk has been begun elsewhere and will not be taken up here (Bruzelius et al ., 1998; Flyvbjerg & COWI, 2004; Flyvbjerg et al ., 2002, 2003, 2005).”
MethodDeception in Dallas: Strategic Misrepresentation in Rail Transit Promotion and Evaluation
Kain, J. F. (1990) · Journal of the American Planning Association · doi:10.1080/01944369008975758 · Cited by 157 · cited 1×
“Samples therefore cover too few projects to allow systematic, statistical analysis, and results of the studies are likely to depend on random properties of the selected samples (Hall, 1980; Fouracre et al ., 1990; Kain, 1990; Walmsley & Pickett, 1992; Richmond, 1998; Flyvbjerg et al. , 2002, 2005).”
BackgroundBig decisions, big risks: improving accountability in mega projects
Bruzelius, N., Flyvbjerg, B., & Rothengatter, W. (1998) · International Review of Administrative Sciences · doi:10.1177/002085239806400306 · Cited by 132
Self-citationProcedures for Dealing with Optimism Bias in Transport Planning: Guidance Document
Flyvbjerg, B., Glenting, C., & Rønnest, A. (2004) · VBN Forskningsportal (Aalborg Universitet) · Cited by 130
Self-citationCost overruns in public projects
Arditi, D., Akan, G. T., & Gurdamar, S. (1985) · International Journal of Project Management · doi:10.1016/0263-7863(85)90053-5 · Cited by 121 · cited 2×
“…projects, and weapons systems (Healey, 1964; Maynard et al ., 1970; Department of Energy Study Group; 1975; Coleman et al ., 1976; Henderson, 1977; Canaday, 1980; Hall, 1980; Arditi et al ., 1985; Morris & Hugh, 1987; Merrow, 1988; Dlakwa & Culpin, 1990; Fraser, 1990; World Bank, 1994, n.d.).”
BackgroundFlyvbjerg, B. (2005) · Transportation Research Part A Policy and Practice · doi:10.1016/j.tra.2005.02.003 · Cited by 110 · cited 2×
“For a more detailed description of the methods involved than that given below (Flyvbjerg et al ., 2002, 2005; Flyvbjerg, 2005).”
BackgroundMethodSelf-citationReasons for overrun in public sector construction projects in Nigeria
Dlakwa, M. M., & Culpin, M. F. (1990) · International Journal of Project Management · doi:10.1016/0263-7863(90)90032-7 · Cited by 109 · cited 2×
“…projects, and weapons systems (Healey, 1964; Maynard et al ., 1970; Department of Energy Study Group; 1975; Coleman et al ., 1976; Henderson, 1977; Canaday, 1980; Hall, 1980; Arditi et al ., 1985; Morris & Hugh, 1987; Merrow, 1988; Dlakwa & Culpin, 1990; Fraser, 1990; World Bank, 1994, n.d.).”
BackgroundGetting realistic about megaproject planning: The case of the new Denver International Airport
Szyliowicz, J. S., & Goetz, A. R. (1995) · Policy Sciences · doi:10.1007/bf01000249 · Cited by 103 · cited 2×
“The basic problem is that reliable knowledge of risks is wanting or non-existent for most types of projects (Morris & Hough, 1987; World Bank, 1994; Szyliowicz & Goetz, 1995; Flyvbjerg et al., 2002, 2005).”
BackgroundPolicy and Planning for Large Infrastructure Projects: Problems, Causes, CuresPreprint
Flyvbjerg, B. (2013) · SSRN Electronic Journal · doi:10.2139/ssrn.2278256 · Cited by 97
Self-citationTHE PERFORMANCE AND IMPACT OF RAIL MASS TRANSIT IN DEVELOPING COUNTRIES
Fouracre, P. R., Allport, R. J., & Thomson, J. M. (1990) · Publication of: Transport and Road Research Laboratory · Cited by 71
NEW RAIL TRANSIT INVESTMENTS - A REVIEW
Richmond, J. (1998) · Cited by 32
Cited by
Samset, K., & Volden, G. H. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.01.014 · Cited by 314
Determining the Probability of Project Cost Overruns
Love, P. E. D., Wang, X., Sing, C.-P., & Tiong, R. L. K. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000575 · Cited by 169
Love, P. E. D., Ahiaga-Dagbui, D. D., & Irani, Z. (2016) · Transportation Research Part A: Policy and Practice · doi:10.1016/j.tra.2016.08.007 · Cited by 138
“…a much-needed stimulus for theory that can be used to explain cost overrun causation, they still remain a ubiquitous and on-going issue (e.g., Flyvbjerg et al ., 2002; Bordat et al ., 2004; Odeck, 2004; Flyvbjerg et al ., 2005; Flyvbjerg, 2007; Cantarelli et al , 2012a,b,c; Love et al ., 2015b).”
Pinto, J. K. (2013) · Business Horizons · doi:10.1016/j.bushor.2013.05.006 · Cited by 69
Metadata
- Authors
- Flyvbjerg, B.
- Venue
- Transportation Planning and Technology
- Publisher
- Informa UK Limited
- Published
- 2007-02
- Volume
- 30
- Issue
- 1
- Pages
- 9-30
- ISSN
- 0308-1060 (ISSN-L)
- 1029-0354
- OpenAlex
- W2050596832
- Cited by
- 167
- References
- 20
- FWCI
- 2.95
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.