Implementing the Lean Sigma framework in an Indian SME: a case study
The DOI matches its Crossref record; 22 of the 22 references it cites were found in a registry or an index.
Abstract
Lean and Six Sigma are two widely acknowledged business process improvement strategies available to organisations today for achieving dramatic results in cost, quality and time by focusing on process performance. Lately, Lean and Six Sigma practitioners are integrating the two strategies into a more powerful and effective hybrid, addressing many of the weaknesses and retaining most of the strengths of each strategy. Lean Sigma combines the variability reduction tools and techniques from Six Sigma with the waste and non-value added elimination tools and techniques from Lean Manufacturing, to generate savings to the bottom-line of an organisation. This paper proposes a Lean Sigma framework to reduce the defect occurring in the final product (automobile accessories) manufactured by a die-casting process. The proposed framework integrates Lean tools (current state map, 5S System, and Total Productive Maintenance (TPM)) within Six Sigma DMAIC methodology to enhance the bottom-line results and win customer loyalty. Implementation of the proposed framework shows dramatic improvement in the key metrics (defect per unit (DPU), process capability index, mean and standard deviation of casting density, yield, and overall equipment effectiveness (OEE)) and a substantial financial savings is generated by the organisation.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Toyota production system: beyond large-scale production
Ohno, T., & Rosen, C. B. (1998) · CERN Document Server (European Organization for Nuclear Research) · Cited by 4,522
Lean manufacturing: context, practice bundles, and performance
Shah, R., & Ward, P. T. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00108-0 · Cited by 2,897 · cited 2×
“Shah and Ward (2003) accentuated the importance of plant size, plant age, and union status on the likelihood of implementing 22 manufacturing practices that are key facets of the Lean production system.”
BackgroundLean Thinking—Banish Waste and Create Wealth in your Corporation
Womack, J. P., & Jones, D. T. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600967 · Cited by 2,122
Lean Thinking-Banish Waste and Create Wealth in Your Corporation.
Rand, G., Womack, J., & Jones, D. T. (1997) · The Journal of the Operational Research Society · doi:10.2307/3010314 · Cited by 1,835
Relationships between implementation of TQM, JIT, and TPM and manufacturing performance
Cua, K. O., McKone, K. E., & Schroeder, R. G. (2001) · Journal of Operations Management · doi:10.1016/s0272-6963(01)00066-3 · Cited by 1,152
Toyota Production System: An Integrated Approach to Just-In-Time
Monden, Y. (1993) · Cited by 957
Lean Six Sigma : combining Six Sigma quality with lean speed
George, M. L. (2002) · Cited by 940
Six Sigma: a goal‐theoretic perspective
Linderman, K., Schroeder, R. G., Zaheer, S., & Choo, A. S. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00087-6 · Cited by 874
Implementing Six Sigma: Smarter Solutions Using Statistical Methods
Gardner, M. M. (2000) · Technometrics · doi:10.1080/00401706.2000.10486054 · Cited by 772
The integration of lean management and Six Sigma
Arnheiter, E. D., & Maleyeff, J. (2005) · The TQM Magazine · doi:10.1108/09544780510573020 · Cited by 648
Hines, P., Rich, N., Bicheno, J., Brunt, D., Taylor, D., Butterworth, C., & Sullivan, J. (1998) · The International Journal of Logistics Management · doi:10.1108/09574099810805726 · Cited by 358
Leading Six Sigma: A Step-by-Step Guide Based on Experience with GE and Other Six Sigma Companies
Snee, R. D., & Hoerl, R. W. (2002) · Medical Entomology and Zoology · Cited by 294
Eshelman, D. C. O. (1992) · Cited by 261
Toyota production system: An integrated approach to Just-In-Time
Yazdani, B. (1995) · Computer Integrated Manufacturing Systems · doi:10.1016/0951-5240(95)90010-1 · Cited by 253
Machine that changed the world
Staff, C. (1993) · Computer · Cited by 193
Is lean manufacture universally relevant? An investigative methodology
James‐Moore, S. M., & Gibbons, A. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710171244 · Cited by 168
Murman, E., Allen, T., Bozdogan, K., Cutcher-Gershenfeld, J., McManus, H., Nightingale, D., Rebentisch, E., Shields, T., Stahl, F., Walton, M., et al. (2002) · Palgrave Macmillan UK eBooks · doi:10.1057/9781403907509 · Cited by 161
Sharma, U. (2003) · National Productivity Review · doi:10.1002/npr.10078 · Cited by 97
Lean Sigma [production and supply chain management]
Antony, J., Caine, P. J., & Escamilla, J. L. (2003) · Manufacturing Engineer · doi:10.1049/me:20030203 · Cited by 80
Self-citationThe Shingo Production Management System: Improving Process Functions
Shingo, S., & Dillon, A. (1992) · Cited by 33
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
The evolution of lean Six Sigma
Pepper, M. P. J., & Spedding, T. A. (2010) · International Journal of Quality & Reliability Management · doi:10.1108/02656711011014276 · Cited by 544
Thanki, S., Govindan, K., & Thakkar, J. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.06.105 · Cited by 367
Lean Six Sigma: yesterday, today and tomorrow
Antony, J., Snee, R., & Hoerl, R. (2017) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-03-2016-0035 · Cited by 347
Self-citationA Systematic Literature Review on Recent Lean Research: State‐of‐the‐art and Future Directions
Danese, P., Manfè, V., & Romano, P. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12156 · Cited by 345
Metadata
- Authors
- Kumar, M., Antony, J., Singh, R. K., Tiwari, M. K., & Perry, D.
- Venue
- Production Planning & Control
- Publisher
- Informa UK Limited
- Published
- 2006-06
- Volume
- 17
- Issue
- 4
- Pages
- 407-423
- ISSN
- 0953-7287 (ISSN-L)
- 1366-5871
- OpenAlex
- W2151576132
- Cited by
- 473
- References
- 22
- FWCI
- 12.05
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.