Lean project management

Ballard, Glenn, Howell, Gregory·2003·Building Research & Information

Abstract

Projects are temporary production systems. When those systems are structured to deliver the product while maximizing value and minimizing waste, they are said to be ‘lean’ projects. Lean project management differs from traditional project management not only in the goals it pursues, but also in the structure of its phases, the relationship between phases and the participants in each phase. This paper presents a model of lean project management and contrasts lean and traditional approaches. Four tools or interventions are presented as illustrations of lean concepts in action. Les projets sont des systèmes de production temporaires. Lorsque ces systèmes sont organisés pour fournir le produit tout en optimisant la valeur et en minimisant les gaspillages, on dit qu'il s'agit de projets ≪au plus juste≫. La gestion de ce type de projet diffère de celle des projets classiques non seulement au niveau des objectifs visés mais aussi à celui de la structure des phases, des relations entre les phases et des participants à chaque phase. Cet article propose un modèle de gestion de projet au plus juste et oppose les deux approches. Quatre outils ou interventions sont présentés pour illustrer l'application des concepts ≪au plus juste≫.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/09613210301997

Cites

16 of 16 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 16 references

Cited by

See all 364

Metadata

Authors
Ballard, G., & Howell, G.
Venue
Building Research & Information
Published
2003-01
Volume
31
Issue
2
Pages
119-133
ISSN
  • 0961-3218 (ISSN-L)
  • 1466-4321
OpenAlex
W2124032833
Cited by
364
References
16
FWCI
7.24
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Lean project management. https://app.cochat.ai/papers/10.1080/09613210301997
The paper
Ballard, G., & Howell, G. (2003). Lean project management. Building Research & Information. https://doi.org/10.1080/09613210301997

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.