Abstract
Projects are temporary production systems. When those systems are structured to deliver the product while maximizing value and minimizing waste, they are said to be ‘lean’ projects. Lean project management differs from traditional project management not only in the goals it pursues, but also in the structure of its phases, the relationship between phases and the participants in each phase. This paper presents a model of lean project management and contrasts lean and traditional approaches. Four tools or interventions are presented as illustrations of lean concepts in action. Les projets sont des systèmes de production temporaires. Lorsque ces systèmes sont organisés pour fournir le produit tout en optimisant la valeur et en minimisant les gaspillages, on dit qu'il s'agit de projets ≪au plus juste≫. La gestion de ce type de projet diffère de celle des projets classiques non seulement au niveau des objectifs visés mais aussi à celui de la structure des phases, des relations entre les phases et des participants à chaque phase. Cet article propose un modèle de gestion de projet au plus juste et oppose les deux approches. Quatre outils ou interventions sont présentés pour illustrer l'application des concepts ≪au plus juste≫.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Toyota production system: beyond large-scale production
Ohno, T., & Rosen, C. B. (1998) · CERN Document Server (European Organization for Nuclear Research) · Cited by 4,522
THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL
Ballard, H. G. (2000) · University of Birmingham Institutional Research Archive (University of Birmingham) · Cited by 2,057
An exploration towards a production theory and its application to construction
Koskela, L. (2000) · Aaltodoc (Aalto University) · Cited by 1,868
Pegels, C. C. (1984) · Japan vs. the West · doi:10.1007/978-94-017-5271-8_8 · Cited by 802
The second Toyota paradox: How delaying decisions can make better cars faster
(1995) · Long Range Planning · doi:10.1016/0024-6301(95)94310-u · Cited by 638
Toyota's Principles of Set-Based Concurrent Engineering
Sobek, D. K., Ward, A. C., & Liker, J. Κ. (1999) · Sloan management review · Cited by 632
Shielding Production: Essential Step in Production Control
Ballard, G., & Howell, G. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:1(11 · Cited by 510
Self-citation(2011) · Making Sense of Construction Improvement · doi:10.1002/9781444341102.ch5 · Cited by 314
Implementing Lean Construction: Stabilizing Work Flow
Ballard, G., & Howell, G. A. (1997) · Cited by 268
Self-citationEngineering, Construction and Architectural Management
(2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam · Cited by 247
Proceedings for the 14th Annual Conference in the International Group for Lean Construction
Sacks, R., & Bertelsen, S. (2006) · Cited by 186
Design and Construction: Building in Value
Best, R., & de Valence, G. (2002) · Cited by 138
Learning to see work flow: an application of lean concepts to precast concrete fabrication
Ballard, G., Harper, N., & Zabelle, T. R. (2003) · Engineering Construction & Architectural Management · doi:10.1108/09699980310466505 · Cited by 101
Self-citationThe Shingo Production Management System: Improving Process Functions
Shingo, S., & Dillon, A. (1992) · Cited by 33
Cited by
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
“As project production systems (Ballard and Howell, 2003), all significant construction projects require intense collaboration among large groups of independent designers, consultants, contractors, suppliers, and public agencies.”
BackgroundEngineer-to-order supply chain management: A literature review and research agenda
Gosling, J., & Naim, M. M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.07.002 · Cited by 379
Interdependence in supply chains and projects in construction
Bankvall, L., Bygballe, L. E., Dubois, A., & Jahre, M. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068314 · Cited by 253
Cheng, T., Teizer, J., Migliaccio, G. C., & Gatti, U. C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.08.003 · Cited by 191
“Even the introduction of lean production techniques to the construction industry while de-emphasizing the focus on productivity improvement [20] has heavily relied on productivity analyses to assess the effectiveness of lean construction approaches [21].”
Background
Metadata
- Authors
- Ballard, G., & Howell, G.
- Venue
- Building Research & Information
- Publisher
- Informa UK Limited
- Published
- 2003-01
- Volume
- 31
- Issue
- 2
- Pages
- 119-133
- ISSN
- 0961-3218 (ISSN-L)
- 1466-4321
- OpenAlex
- W2124032833
- Cited by
- 364
- References
- 16
- FWCI
- 7.24
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.