Critical success factors for modular integrated construction projects: a review
Open accessThe DOI matches its Crossref record; 5 of the 5 references it cites were found in a registry or an index.
Abstract
Modular integrated construction (MiC) is an innovative construction approach which transforms the fragmented linear site-based construction of buildings into an integrated production and assembly of value-added prefabricated prefinished modules. As MiC has gained attention in the construction industry, more in-depth knowledge of the critical success factors (CSFs) for implementing MiC projects is imperative. This research reviewed studies on the CSFs for implementing MiC projects during the period 1993–2019. Analysis showed that the US, UK, Malaysia, Australia, and Hong Kong are the largest contributors to the MiC CSFs studies. Further analysis generated 35 CSFs for implementing MiC projects. Of these, the six most cited CSFs shared between countries and MiC projects include good working collaboration and effective communication among project participants; effective supply chain management; accurate design and early design freeze; involvement of key project participants throughout the project; suitable procurement strategy and contracting; and standardization & benchmarking of best practices. These shared CSFs can be used to develop decision support systems, enabling the prediction of project success. The developed checklists and conceptual model of the CSFs could help to guide and improve the successful implementation of MiC projects and may form a useful basis for future empirical studies.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Analyzing the Past to Prepare for the Future: Writing a Literature Review
Webster, J., & Watson, R. T. (2002) · MIS Quarterly · doi:10.2307/4132319 · Cited by 7,449
Wohlin, C. (2014) · Proceedings of the 18th International Conference on Evaluation and Assessment in Software Engineering · doi:10.1145/2601248.2601268 · Cited by 4,234
Design Rules: The Power of Modularity
Baldwin, C. Y., & Clark, K. B. (2000) · doi:10.7551/mitpress/2366.001.0001 · Cited by 3,504
Greenhalgh, T., & Peacock, R. (2005) · BMJ · doi:10.1136/bmj.38636.593461.68 · Cited by 2,045
Analyzing the past to prepare for the future
(2002) · MIS Quarterly · doi:10.5555/2017160.2017162 · Cited by 179
Metadata
- Authors
- Wuni, I. Y., & Shen, G. Q.
- Venue
- Building Research & Information
- Publisher
- Informa UK Limited
- Published
- 2019-09-25
- Volume
- 48
- Issue
- 7
- Pages
- 763-784
- ISSN
- 0961-3218 (ISSN-L)
- 1466-4321
- OpenAlex
- W2975503980
- Cited by
- 237
- References
- 5
- FWCI
- 14.95
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Critical success factors for modular integrated construction projects: a review. https://app.cochat.ai/papers/10.1080/09613218.2019.1669009
- The paper
- Wuni, I. Y., & Shen, G. Q. (2020). Critical success factors for modular integrated construction projects: a review. Building Research & Information. https://doi.org/10.1080/09613218.2019.1669009
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.