Critical success factors for modular integrated construction projects: a review
Open accessThe DOI matches its Crossref record; 63 of the 63 references it cites were found in a registry or an index.
Abstract
Modular integrated construction (MiC) is an innovative construction approach which transforms the fragmented linear site-based construction of buildings into an integrated production and assembly of value-added prefabricated prefinished modules. As MiC has gained attention in the construction industry, more in-depth knowledge of the critical success factors (CSFs) for implementing MiC projects is imperative. This research reviewed studies on the CSFs for implementing MiC projects during the period 1993–2019. Analysis showed that the US, UK, Malaysia, Australia, and Hong Kong are the largest contributors to the MiC CSFs studies. Further analysis generated 35 CSFs for implementing MiC projects. Of these, the six most cited CSFs shared between countries and MiC projects include good working collaboration and effective communication among project participants; effective supply chain management; accurate design and early design freeze; involvement of key project participants throughout the project; suitable procurement strategy and contracting; and standardization & benchmarking of best practices. These shared CSFs can be used to develop decision support systems, enabling the prediction of project success. The developed checklists and conceptual model of the CSFs could help to guide and improve the successful implementation of MiC projects and may form a useful basis for future empirical studies.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Analyzing the Past to Prepare for the Future: Writing a Literature Review
Webster, J., & Watson, R. T. (2002) · MIS Quarterly · doi:10.2307/4132319 · Cited by 7,449
The Architecture of Complexity
Simon, H. A. (1991) · Facets of Systems Science · doi:10.1007/978-1-4899-0718-9_31 · Cited by 4,433
Wohlin, C. (2014) · Proceedings of the 18th International Conference on Evaluation and Assessment in Software Engineering · doi:10.1145/2601248.2601268 · Cited by 4,234
Design Rules: The Power of Modularity
Baldwin, C. Y., & Clark, K. B. (2000) · doi:10.7551/mitpress/2366.001.0001 · Cited by 3,504
Mohr, J., & Spekman, R. (1994) · Strategic Management Journal · doi:10.1002/smj.4250150205 · Cited by 3,475
Australian Journal of Basic and Applied Sciences
(2018) · AUSTRALIAN JOURNAL OF BASIC AND APPLIED SCIENCES · doi:10.22587/ajbas · Cited by 3,098
Links and Impacts: The Influence of Public Research on Industrial R&D
Cohen, W. M., Nelson, R. R., & Walsh, J. P. (2002) · Management Science · doi:10.1287/mnsc.48.1.1.14273 · Cited by 2,269
Greenhalgh, T., & Peacock, R. (2005) · BMJ · doi:10.1136/bmj.38636.593461.68 · Cited by 2,045
Thomson, J. R. (2015) · High Integrity Systems and Safety Management in Hazardous Industries · doi:10.1016/b978-0-12-801996-2.00012-x · Cited by 1,505
Managing in an age of modularity
Antoine, C. (2013) · Publications Docs-en-stock.com · Cited by 1,128
Osei-Kyei, R., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.008 · Cited by 803
The changing role of the information systems executive : a critical success factors perspectivePreprint
Rockart, J. F. (1980) · RePEc: Research Papers in Economics · Cited by 550
Critical Success Factors for Construction Projects
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1992)118:1(94 · Cited by 478
Industrial Dynamics—After the First Decade
Forrester, J. W. (1968) · Management Science · doi:10.1287/mnsc.14.7.398 · Cited by 448
Drivers, constraints and the future of offsite manufacture in Australia
Blismas, N. G., & Wakefield, R. R. (2009) · Construction Innovation · doi:10.1108/14714170910931552 · Cited by 445
A critical review of structural equation modeling applications in construction research
Xiong, B., Skitmore, M., & Xia, B. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.09.006 · Cited by 427
Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.01.001 · Cited by 420
Self-citationRe-engineering through pre-assembly: client expectations and drivers
Gibb, A., & Isack, F. (2003) · Building Research & Information · doi:10.1080/09613210302000 · Cited by 397
Prefabricated construction enabled by the Internet-of-Things
Zhong, R. Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., Thomas Ng, S., Lu, W., Shen, G. Q. P., & Huang, G. Q. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.01.006 · Cited by 395
Self-citationUsing Dynamic Modeling to Scope Environmental Problems and Build Consensus
Costanza, R., & Ruth, M. (1998) · Environmental Management · doi:10.1007/s002679900095 · Cited by 376
Wuni, I. Y., Shen, G. Q. P., & Osei-Kyei, R. (2019) · Energy and Buildings · doi:10.1016/j.enbuild.2019.02.010 · Cited by 370
Self-citationPerspectives of UK housebuilders on the use of offsite modern methods of construction
Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007) · Construction Management and Economics · doi:10.1080/01446190600827058 · Cited by 357
Solli‐Sæther, H., & Gottschalk, P. (2010) · IGI Global eBooks · doi:10.4018/9781605667966.ch003 · Cited by 329
Key constraints and mitigation strategies for prefabricated prefinished volumetric construction
Hwang, B.-G., Shan, M., & Looi, K.-Y. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.136 · Cited by 318
Performance Review of Prefabricated Building Systems and Future Research in Australia
Navaratnam, S., Ngo, T., Gunawardena, T., & Henderson, D. (2019) · Buildings · doi:10.3390/buildings9020038 · Cited by 310
Standardization and pre-assembly- distinguishing myth from reality using case study research
Gibb, A. (2001) · Construction Management and Economics · doi:10.1080/01446190010020435 · Cited by 296
Schedule risks in prefabrication housing production in Hong Kong: a social network analysis
Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Mok, M. K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.02.123 · Cited by 282
Self-citationLi, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., & Shen, G. Q. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.07.156 · Cited by 272
Self-citationFreund, Y. P. (1988) · Planning Review · doi:10.1108/eb054225 · Cited by 252
Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000675 · Cited by 236
Leading UK housebuilders' utilization of offsite construction methods
Pan, W., Gibb, A., & Dainty, A. (2007) · Building Research & Information · doi:10.1080/09613210701204013 · Cited by 221
Optimal logistics planning for modular construction using two-stage stochastic programming
Hsu, P.-Y., Angeloudis, P., & Aurisicchio, M. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.029 · Cited by 213
Bortolini, R., Formoso, C. T., & Viana, D. D. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.11.031 · Cited by 211
Antwi-Afari, M. F., Li, H., Pärn, E. A., & Edwards, D. J. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.010 · Cited by 210
Making a case for offsite construction in China
Arif, M., & Egbu, C. (2010) · Engineering Construction & Architectural Management · doi:10.1108/09699981011090170 · Cited by 209
Toor, S., & Ogunlana, S. O. (2009) · Construction Innovation · doi:10.1108/14714170910950803 · Cited by 190
Critical risk factors in the application of modular integrated construction: a systematic review
Wuni, I. Y., Shen, G. Q. P., & Mahmud, A. T. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2019.1613212 · Cited by 185
Self-citationDiagnosing organizational decision making through responsibility charting.
Je, M., & Tn, G. (1983) · PubMed · Cited by 181
Analyzing the past to prepare for the future
(2002) · MIS Quarterly · doi:10.5555/2017160.2017162 · Cited by 179
Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization
O’Connor, J. T., O’Brien, W. J., & Choi, J. O. (2014) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000842 · Cited by 161
The Purpose, Process, and Methods of Writing a Literature Review
Baker, J. D. (2016) · AORN Journal · doi:10.1016/j.aorn.2016.01.016 · Cited by 158
Managing risk in modular construction using dimensional and geometric tolerance strategies
Shahtaheri, Y., Rausch, C., West, J. S., Haas, C. T., & Nahangi, M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.011 · Cited by 155
Review of Contemporary Construction Procurement Practices
Ruparathna, R., & Hewage, K. (2013) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000279 · Cited by 150
Critical Success Factors of Chief MIS/DP Executives
Martin, E. W. (1982) · MIS Quarterly · doi:10.2307/249279 · Cited by 119
Azhar, S., Lukkad, M. Y., & Ahmad, I. U. (2013) · International Journal of Construction Education and Research · doi:10.1080/15578771.2012.723115 · Cited by 113
Demiralp, G., Güven, G., & Ergen, E. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.02.005 · Cited by 113
Sharafi, P., Rashidi, M., Samali, B., Ronagh, H. R., & Mortazavi, M. (2018) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000313 · Cited by 109
On prefabrication implementation for different project types and procurement methods in Hong Kong
Tam, V. W. Y., Tam, C. M., & Ng, W. C. Y. (2007) · Journal of Engineering Design and Technology · doi:10.1108/17260530710746614 · Cited by 108
An integrated framework for ERP system implementation
Jagoda, K., & Samaranayake, P. (2017) · International Journal of Accounting and Information Management · doi:10.1108/ijaim-04-2016-0038 · Cited by 104
Choi, J. O., O’Connor, J. T., & Kim, T. W. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001171 · Cited by 101
Analysis of cost-increasing risk factors in modular construction in Korea using FMEA
Lee, J., & Kim, Y.-S. (2016) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-016-0194-1 · Cited by 97
Defining and Categorizing Modules in Building Projects: An International Perspective
Gosling, J., Pero, M. E. P., Schoenwitz, M., TOWILL, D. R., & Cigolini, R. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001181 · Cited by 95
Matching supply networks to a modular product architecture in the house-building industry
Hofman, E., Voordijk, H., & Halman, J. I. M. (2009) · Building Research & Information · doi:10.1080/09613210802628003 · Cited by 90
Lessing, J., & Brege, S. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001368 · Cited by 86
Li, L., Li, Z., Wu, G., & Li, X. (2018) · Sustainability · doi:10.3390/su10030836 · Cited by 83
Factors Affecting the Capital Cost of Prefabrication—A Case Study of China
Xue, H., Zhang, S., Su, Y., & Wu, Z. (2017) · Sustainability · doi:10.3390/su9091512 · Cited by 78
Intelligence approach to production planning system for bespoke precast concrete products
Benjaoran, V., & Dawood, N. N. (2005) · Automation in Construction · doi:10.1016/j.autcon.2005.09.007 · Cited by 69
Off-site manufacture in Australia: Current state and future directions
Blismas, N. G. (2024) · RMIT Research Repository (RMIT University Library) · doi:10.25439/rmt.27850059 · Cited by 52
Rashidi, A., & Ibrahim, R. (2017) · The Open Construction and Building Technology Journal · doi:10.2174/1874836801711010286 · Cited by 47
Lau, A. K. W. (2011) · Journal of Engineering and Technology Management · doi:10.1016/j.jengtecman.2011.03.004 · Cited by 44
Nawi, M. N. M., Lee, A. H.-C., Kamar, K. A. M., & Hamid, Z. A. (2012) · Universiti Utara Malaysia Institutional Repository (Universiti Utara Malaysia) · Cited by 34
Conducting Research in a Changing and Challenging World
Le, T. T., & Le, Q. B. (2013) · UTAS Research Repository · Cited by 30
Wong, P. S. P., Whelan, B., & Holdsworth, S. (2018) · International Journal of Construction Management · doi:10.1080/15623599.2018.1539160 · Cited by 24
Cited by
Digital Twin for Supply Chain Coordination in Modular Construction
Lee, D., & Lee, S. (2021) · Applied Sciences · doi:10.3390/app11135909 · Cited by 218
“, manufacturer, retailer, and assembler) thus supply chain coordination is essential for a successful modular project [3].”
Background
Metadata
- Authors
- Wuni, I. Y., & Shen, G. Q.
- Venue
- Building Research & Information
- Publisher
- Informa UK Limited
- Published
- 2019-09-25
- Volume
- 48
- Issue
- 7
- Pages
- 763-784
- ISSN
- 0961-3218 (ISSN-L)
- 1466-4321
- OpenAlex
- W2975503980
- Cited by
- 237
- References
- 63
- FWCI
- 14.95
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.