Integrated Earned Value Gantt Chart (EV-Gantt) Tool for Project Portfolio Planning and Monitoring Optimization

Ong, Hong Yeow, Wang, Chen, Zainon, Nurshuhada · 2016 · Engineering Management Journal

The DOI matches its Crossref record; 58 of the 60 references it cites were found in a registry or an index.

Abstract

Project portfolio management (PPM), as a way to manage multiple projects, is becoming a key managerial skill needed by most organizations, especially those engaged in multiple projects concurrently. These multiple projects usually have different characteristics and functions, yet most existing project portfolio theories do not provide an efficient planning and monitoring tool at the operational level. This research aims to integrate the two most efficient planning and monitoring tools—namely, earned value analysis and the Gantt chart to develop a new PPM tool named earned value Gantt chart (EV-Gantt) for portfolio planning and monitoring. EV-Gantt was tested through scenario analysis and a pilot run using a portfolio of real cases. Results show that EV-Gantt performed satisfactorily in resource allocation, systematic reporting, and monitoring enhancement. A standard operating procedure was developed to facilitate implementation of the EV-Gantt tool by engineering managers.

Overview

Integrity signals

Registry

Crossref · 10.1080/10429247.2015.1135033

Cites

58 of 58 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Citations

Cites

Show all 58 references

Research works printed but not linked: 13

  1. Abba W. F., 1997, Program Manager, 26, 58
  2. Association for Project Management, 2008, Earned value analysis: APM guidelines
  3. Bauer N., 2004, Project Management Network, 18, 29
  4. Cooper R. G., 2002, Portfolio management: Fundamental to new product success: The PDMA toolbook for new product development
  5. Department of Defense, 2012, Earned value analysis system (EVAS) program analysis pamphlet (PAP)
  6. Fleming Q. W., 1998, The Journal of Defense Software Engineering, July, 19
  7. Gantt H. L., 1903, ASME Transactions, 24, 1322
  8. Kim E. H., 2003, International Journal of Project Management, 21, 375, 10.1016/S0263-7863(02)00049-2 · DOI · Paper page
  9. National Society of Professional Engineers (NSPE), 2013, Engineering body of knowledge
  10. PM Network, 1995, PM Network July, 1995, 35
  11. Project Management Institute (PMI), 2005, Practice standard for earned value management
  12. Project Management Institute (PMI), 2006, The Standard for Portfolio Management
  13. Taylor F. W., 1903, ASME Transactions, 24, 1337

Cited by

See all 23

Metadata

Authors
Ong, H. Y., Wang, C., & Zainon, N.
Affiliations
University of Malaya (MY)
Corresponding author
Ong, Hong Yeow
Venue
Engineering Management Journal
Published
2016-01-02
Volume
28
Issue
1
Pages
39-53
ISSN
  • 1042-9247 (ISSN-L)
  • 2377-0643
OpenAlex
W2298189222
Cited by
22
References
60
Citations by year
2025: 1 · 2024: 3 · 2023: 1 · 2022: 4 · 2021: 5 · 2020: 2 · 2019: 2 · 2018: 3 · 2017: 1
FWCI
2.19
Type
journal article
Language
en
Open access
closed
Locations
Engineering Management Journal (publishedVersion)
Topics
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Resource-Constrained Project Scheduling
  • Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
Keywords
earned value analysis, Gantt chart, project portfolio management, project planning, project monitoring, resource allocation, multiple projects, standard operating procedures

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Integrated Earned Value Gantt Chart (EV-Gantt) Tool for Project Portfolio Planning and Monitoring Optimization. https://app.cochat.ai/papers/10.1080/10429247.2015.1135033
The paper
Ong, H. Y., Wang, C., & Zainon, N. (2016). Integrated Earned Value Gantt Chart (EV-Gantt) Tool for Project Portfolio Planning and Monitoring Optimization. Engineering Management Journal. https://doi.org/10.1080/10429247.2015.1135033

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.