Calibrating Detailed Building Energy Simulation Programs with Measured Data—Part I: General Methodology (RP-1051)
The DOI matches its Crossref record; 20 of the 20 references it cites were found in a registry or an index.
Abstract
Calibrated simulation is the process of using a building simulation program for an existing building and “tuning” or calibrating the various inputs to the program so that predictions match closely with observed energy use. Historically, the calibration process has been an art form that inevitably relies on user knowledge, past experience, statistical expertise, engineering judgment, and an abundance of trial and error. Unfortunately, despite widespread interest in the professional community, no consensus guidelines have been published on how to perform a calibration using detailed simulation programs. This research project was initiated with the intention to cull the best tools, techniques, approaches, and procedures from the existing body of research and develop a coherent and systematic calibration methodology that includes both parameter estimation and the determination of the uncertainty in the calibrated simulation. A general methodology of calibrating detailed simulation programs to performance data is proposed, which we deem to be methodical, rational, robust, and computationally efficient while being flexible enough to satisfy different users with different personal preferences and biases. The methodology involves various concepts and approaches borrowed from allied scientific disciplines that are also reviewed in this paper. The methodology essentially consists of five parts: (1) identify a building energy program that has the ability to simulate the types of building elements and systems present and set up the simulation input file to be as realistic as possible; (2) depending on the building type, heuristically define a set of influential parameters and schedules that have simple and clear correspondence to specific and easy-to-identify inputs to the simulation program, along with their best-guess estimates and their range of variation; (3) perform a coarse grid search wherein the heuristically defined influential parameters are subject to a Monte Carlo simulation involving thousands of simulation trials from which a small set of promising parameter vector solutions can be identified by filtering, the strong and weak parameters can be identified, and narrower bounds of variability of the strong parameters can be defined; (4) perform a guided grid search to further refine the promising parameter vector solutions; and (5) use this small set of solutions (as opposed to a single calibrated solution) to make predictions about intended changes to the building and its systems, and determine the prediction uncertainty of the entire calibration process. A companion paper (Reddy et al. 2007) will present the results of applying this calibration methodology to two synthetic office buildings and one actual office building.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Hammersley, J. M., & Handscomb, D. C. (1964) · Springer eBooks · doi:10.1007/978-94-009-5819-7 · Cited by 4,054
Statistics for experimenters. An introduction to design, data analysis, and model building.
Box, G. E. P., Hunter, W. G., & Hunter, J. S. (1978) · Cited by 4,021
Latin hypercube sampling and the propagation of uncertainty in analyses of complex systems
Helton, J. C., & Davis, F. J. (2003) · Reliability Engineering & System Safety · doi:10.1016/s0951-8320(03)00058-9 · Cited by 2,688 · cited 2×
“A paper by Helton and Davis (2003) cites over 150 references in the area of sensitivity analysis, discusses the clear advantages of LHMC sampling for analysis of complex systems, and enumerates the reasons for the popularity of such methods.”
BackgroundMethodSensitivity Analysis for Importance Assessment
Saltelli, A. (2002) · Risk Analysis · doi:10.1111/0272-4332.00040 · Cited by 1,302 · cited 6×
“This process is also referred to in the scientific community as GIGOing (garbage in–garbage out), where a false sense of confidence can result since precise outputs are obtained by arbitrarily restricting the input space (Saltelli 2002).”
BackgroundMethodResultInfluentialIdentification and Review of Sensitivity Analysis Methods
Christopher Frey, H., & Patil, S. R. (2002) · Risk Analysis · doi:10.1111/0272-4332.00039 · Cited by 1,036
Statistics for Experimenters: An Introduction to Design, Data Analysis, and Model Building
Parameswaran, R., Box, G. E. P., Hunter, W. G., & Hunter, J. S. (1979) · Journal of Marketing Research · doi:10.2307/3150696 · Cited by 684 · cited 1×
“Experimental design methods from traditional statistics (Box et al. 1978) can provide ways to minimize the number of simulations.”
MethodAN APPROACH TO THE PRELIMINARY ANALYSIS OF ENVIRONMENTAL SYSTEMS
Hornberger, G. M., & Spear, R. C. (1981) · Cited by 566
Analysis of uncertainty in building design evaluations and its implications
de Wit, S., & Augenbroe, G. (2002) · Energy and Buildings · doi:10.1016/s0378-7788(02)00070-1 · Cited by 317
Model calibration as a testing strategy for system dynamics models
Oliva, R. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00622-7 · Cited by 314 · cited 2×
“Further, Oliva (2003) points out that a good fit to the data, though a first requirement, is not a sufficient condition when calibrating a model and that full consideration of the estimated parameters as they shape the model structure should be explicitly considered.”
BackgroundResultSaltelli, A., & Marivoet, J. (1990) · Reliability Engineering & System Safety · doi:10.1016/0951-8320(90)90065-u · Cited by 257 · cited 1×
“Saltelli and Marivoet (1990) compare a number of different sensitivity analysis techniques in the case of nonlinear model responses.”
Background
Cited by
de Wilde, P. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.02.009 · Cited by 1,045
A review of methods to match building energy simulation models to measured data
Coakley, D., Raftery, P., & Keane, M. (2014) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2014.05.007 · Cited by 889
A short-term building cooling load prediction method using deep learning algorithms
Fan, C., Xiao, F., & Zhao, Y. (2017) · Applied Energy · doi:10.1016/j.apenergy.2017.03.064 · Cited by 692
A review on the basics of building energy estimation
Fumo, N. (2014) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.11.040 · Cited by 419
Fan, C., Wang, J., Gang, W., & Li, S. (2019) · Applied Energy · doi:10.1016/j.apenergy.2018.12.004 · Cited by 368
Quantitative energy performance assessment methods for existing buildings
Wang, S., Yan, C., & Xiao, F. (2012) · Energy and Buildings · doi:10.1016/j.enbuild.2012.08.037 · Cited by 324
Deep learning-based feature engineering methods for improved building energy prediction
Fan, C., Sun, Y., Zhao, Y., Song, M., & Wang, J. (2019) · Applied Energy · doi:10.1016/j.apenergy.2019.02.052 · Cited by 301
Building model calibration using energy and environmental data
Royapoor, M., & Roskilly, T. (2015) · Energy and Buildings · doi:10.1016/j.enbuild.2015.02.050 · Cited by 277
Methodologies and Advancements in the Calibration of Building Energy Models
Fabrizio, E., & Monetti, V. (2015) · Energies · doi:10.3390/en8042548 · Cited by 233
“It corresponds to the process of fine-tuning or of “calibrating” the simulation inputs so that the observed energy consumptions closely match those predicted by the simulation program [6].”
Attention-based interpretable neural network for building cooling load prediction
Li, A., Xiao, F., Zhang, C., & Fan, C. (2021) · Applied Energy · doi:10.1016/j.apenergy.2021.117238 · Cited by 227
Nutkiewicz, A., Yang, Z., & Jain, R. K. (2018) · Applied Energy · doi:10.1016/j.apenergy.2018.05.023 · Cited by 223
Calibrating building energy simulation models: A review of the basics to guide future work
Chong, A., Gu, Y., & Jia, H. (2021) · Energy and Buildings · doi:10.1016/j.enbuild.2021.111533 · Cited by 219
“(5)) which was proposed by ASHRAE RP-1051 [162] incorporates both variance and bias errors through a formulation that considers both CV(RMSE) and NMBE.”
Li, Z., Han, Y., & Xu, P. (2014) · Applied Energy · doi:10.1016/j.apenergy.2014.03.020 · Cited by 209
“ASHRARE research project RP-1051 proposed a five step calibration methodology: preliminary input file preparation, parameter space reduction by walk-through audits, Monte-Carlo based coarse grid calibration, solution refinement through guided search, and finally analysis using multiple plausible solutions [56].”
MethodOverview of HVAC system simulation
Trčka, M., & Hensen, J. L. M. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.11.019 · Cited by 207
Xue, P., Jiang, Y., Zhou, Z., Chen, X., Fang, X., & Liu, J. (2019) · Energy · doi:10.1016/j.energy.2019.116085 · Cited by 196
On the assessment and control optimisation of demand response programs in residential buildings
Pallonetto, F., De Rosa, M., D’Ettorre, F., & Finn, D. P. (2020) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2020.109861 · Cited by 169
Evaluating energy performance in non-domestic buildings: A review
Borgstein, E. H., Lamberts, R., & Hensen, J. L. M. (2016) · Energy and Buildings · doi:10.1016/j.enbuild.2016.07.018 · Cited by 165
“A model can be considered to be calibrated when it meets a set of statistical criteria in monthly or hourly evaluations and comparisons, generally having Mean Bias Error (MBE) and Coefficient of Variation of the Root Mean Squared Error (CvRMSE) within certain intervals [60], [88].”
MethodZhang, C., Li, J., Zhao, Y., Li, T., Chen, Q., & Zhang, X. (2020) · Energy and Buildings · doi:10.1016/j.enbuild.2020.110301 · Cited by 124
Metadata
- Authors
- Reddy, T. A., Maor, I., & Panjapornpon, C.
- Venue
- HVAC&R Research
- Publisher
- Informa UK Limited
- Published
- 2007-03
- Volume
- 13
- Issue
- 2
- Pages
- 221-241
- ISSN
- 1078-9669 (ISSN-L)
- 1938-5587
- OpenAlex
- W2068358064
- Cited by
- 195
- References
- 20
- FWCI
- 6.57
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.