Review of application of analytic hierarchy process (AHP) in construction
The DOI matches its Crossref record; 51 of the 51 references it cites were found in a registry or an index.
Abstract
The analytic hierarchy process (AHP) has gained increasing attention in construction management (CM) domain as a technique to analyse complex situations and make sound decisions. However, AHP per se or its potential applications on CM problems are ill-defined within extant literature. The present paper reviews 77 AHP-based papers published in eight selected peer-reviewed CM journals from 2004 to 2014 to better define and delineate AHP application areas and decision-making problems solved within CM. The findings indicated that risk management and sustainable construction were the most popular AHP application areas in CM. It was also revealed that AHP (1) is flexible and can be used as a stand-alone tool or in conjunction with other tools to resolve construction decision-making problems; and (2) is widely used in Asia. In addition, the most prominent justifications for using AHP were found to be small sample size, high level of consistency, simplicity and availability of user-friendly software. This paper provides a useful reference for researchers and practitioners interested in the application of AHP in CM. Future research is needed to compare and contrast between AHP and other multicriteria decision-making methods; such work could reveal which techniques provide optimized solutions under various decision-making scenarios.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
How to Make a Decision: The Analytic Hierarchy Process
Saaty, T. L. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90057-i · Cited by 9,605
Decision making with dependence and feedback : the analytic network process
Saaty, T. L. (1996) · Medical Entomology and Zoology · Cited by 3,356
How to select and how to rank projects: The Promethee method
Brans, J. P., Vincke, P., & Mareschal, B. (1986) · European Journal of Operational Research · doi:10.1016/0377-2217(86)90044-5 · Cited by 2,692
Fundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process
Saaty, T. L. (2000) · Medical Entomology and Zoology · Cited by 2,635
The outranking approach and the foundations of electre methods
Roy, B. (1991) · Theory and Decision · doi:10.1007/bf00134132 · Cited by 1,865
Moutinho, L., & Curry, B. (1994) · ENLIGHTEN (Jurnal Bimbingan dan Konseling Islam) · Cited by 1,813
Application of the AHP in project management
Al-Harbi, K. M. A.-S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,125
Fuzzy MCDM approach for planning and design tenders selection in public office buildings
Hsieh, T.-Y., Lu, S.-T., & Tzeng, G.-H. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.01.002 · Cited by 694
Developing a green building assessment tool for developing countries – Case of Jordan
Ali, H. H., & Alnusairat, S. (2008) · Building and Environment · doi:10.1016/j.buildenv.2008.07.015 · Cited by 679
Application of a fuzzy based decision making methodology to construction project risk assessment
Zeng, J., An, M., & Smith, N. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.006 · Cited by 537
A systems thinking framework for knowledge management
Rubenstein-Montano, B., Liebowitz, J., Buchwalter, J., McCaw, D., Newman, B., & Rebeck, K. (2001) · Decision Support Systems · doi:10.1016/s0167-9236(00)00116-0 · Cited by 521
A review of application of multi-criteria decision making methods in construction
Jato-Espino, D., Castillo-Lopez, E., Rodriguez-Hernandez, J., & Canteras-Jordana, J. C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.013 · Cited by 510
Fuzzy AHP approach for selecting the suitable bridge construction method
Pan, N.-F. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.03.005 · Cited by 394
Multi-criteria evaluation model for the selection of sustainable materials for building projects
Akadiri, P. O., Olomolaiye, P. O., & Chinyio, E. A. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.10.004 · Cited by 386
AlWaer, H., & Clements-Croome, D. J. (2009) · Building and Environment · doi:10.1016/j.buildenv.2009.08.019 · Cited by 359
Application of Delphi method in selection of procurement systems for construction projects
Chan, A. P. C., Yung, E. H. K., Lam, P. T. I., Tam, C. M., & Cheung, S. O. (2001) · Construction Management and Economics · doi:10.1080/01446190110066128 · Cited by 351
Self-citationRisk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP
Abdelgawad, M., & Fayek, A. R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000210 · Cited by 340
Using a multi-criteria decision making approach to evaluate mobile phone alternatives
Alptekin, G. I., & Büyüközkan, G. (2006) · Computer Standards & Interfaces · doi:10.1016/j.csi.2006.05.002 · Cited by 338
Zheng, X., Le, Y., Chan, A. P. C., Hu, Y., & Li, Y. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.005 · Cited by 329
Self-citationConstruction Partnering Process and Associated Critical Success Factors: Quantitative Investigation
Cheng, E. W. L., & Li, H. (2002) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2002)18:4(194 · Cited by 319
An application of quality function deployment to improve the quality of teaching
Lam, K., & Zhao, X. (1998) · International Journal of Quality & Reliability Management · doi:10.1108/02656719810196351 · Cited by 238
The ranking of construction management journals
Wing, C. K. (1997) · Construction Management and Economics · doi:10.1080/014461997372953 · Cited by 198
AHP-Based Equipment Selection Model for Construction Projects
Shapira, A., & Goldenberg, M. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:12(1263 · Cited by 184
Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects
Li, J., & Zou, P. X. W. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000362 · Cited by 182
Overview of the Application of “Fuzzy Techniques” in Construction Management Research
Chan, A. P. C., Chan, D. W. M., & Yeung, J. F. Y. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000099 · Cited by 178
Self-citationZhang, G., & Zou, P. X. W. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:10(771 · Cited by 172
Tserng, H. P., Yin, S. Y. L., Dzeng, R. J., Wou, B., Tsai, M. D., & Chen, W. Y. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.05.005 · Cited by 170
Multi-criteria decision making under uncertainty in building performance assessment
Hopfe, C. J., Augenbroe, G., & Hensen, J. J. (2013) · Building and Environment · doi:10.1016/j.buildenv.2013.07.019 · Cited by 157
Lai, J. H. K., & Yik, F. W. H. (2008) · Building and Environment · doi:10.1016/j.buildenv.2008.03.013 · Cited by 151
Contractor pre-qualification model: State-of-the-art
El-Sawalhi, N. I., Eaton, D. W., & Rustom, R. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.011 · Cited by 135
Bidding strategy to support decision-making by integrating fuzzy AHP and regression-based simulation
Chou, J., Pham, A., & Wang, H. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.06.007 · Cited by 127
Fuzzy adaptive decision making model for selection balanced risk allocation
Khazaeni, G., Khanzadi, M., & Abas, A. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.003 · Cited by 114
Subramanyan, H., Sawant, P. H., & Bhatt, V. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000435 · Cited by 106
Company and Project Evaluation Model for Privately Promoted Infrastructure Projects
Dias, A. A., & Ioannou, P. G. (1996) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1996)122:1(71 · Cited by 101
Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2
Zou, P. X. W., & Li, J. (2010) · Construction Management and Economics · doi:10.1080/01446193.2010.519781 · Cited by 95
Contractor Key Competitiveness Indicators: A China Study
Shen, L., Lu, W., & Yam, M. C. H. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:4(416 · Cited by 95
AHP- and simulation-based budget determination procedure for public building construction projects
Lai, Y.-T., Wang, W.-C., & Wang, H.-H. (2008) · Automation in Construction · doi:10.1016/j.autcon.2007.10.007 · Cited by 86
Ruiz, M. C., Romero, E., Calzada-Pérez, M. Á., & Fernández, I. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.09.009 · Cited by 78
Model to Predict the Impact of a Technology on Construction Productivity
Goodrum, P. M., Haas, C. T., Caldas, C. H., Zhai, D., Yeiser, J., & Homm, D. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000328 · Cited by 77
On-line multi-criterion risk assessment model for construction joint ventures in China
Hsueh, S., Perng, Y., Yan, M.-R., & Lee, J.-R. (2007) · Automation in Construction · doi:10.1016/j.autcon.2007.01.001 · Cited by 76
An analytical method to evaluate facility management services for residential buildings
Lai, J. H. K., & Yik, F. W. H. (2010) · Building and Environment · doi:10.1016/j.buildenv.2010.07.012 · Cited by 75
Decision‐making in a model‐based design process
Schade, J., Olofsson, T., & Schreyer, M. (2011) · Construction Management and Economics · doi:10.1080/01446193.2011.552510 · Cited by 75
Multi‐criteria decision analysis in building maintainability using analytical hierarchy process
Das, S., Chew, M. Y. L., & Poh, K. L. (2010) · Construction Management and Economics · doi:10.1080/01446193.2010.501806 · Cited by 56
The use of a mathematical multicriteria decision-making model for selecting the fire origin room
Tavares, R. M., Tavares, J. M. L., & Parry-Jones, S. L. (2007) · Building and Environment · doi:10.1016/j.buildenv.2007.12.010 · Cited by 48
Enhancing Value in Crucial Decisions: Line 9 of the Barcelona Subway
Ormazábal, G., Prat, B. V., & Aguado, A. (2008) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2008)24:4(265 · Cited by 47
El-Sayegh, S. M. (2009) · Construction Management and Economics · doi:10.1080/01446190902759009 · Cited by 37
Hsu, P., Wu, C., & Li, Z. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.11.028 · Cited by 30
A novel summarization technique for the support of resolving multi-criteria decision making problems
Huang, T. C.-K., Chen, Y., & Chang, T.-H. (2015) · Decision Support Systems · doi:10.1016/j.dss.2015.08.004 · Cited by 29
Application of a Purchasing Portfolio Model in a Construction Company in Two Distinct Markets
Arantes, A., Ferreira, L. M. D. F., & Kharlamov, A. A. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000290 · Cited by 18
Goedert, J. D., & Sekpe, V. D. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000734 · Cited by 14
Cited by
Moslem, S. (2024) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2023.107447 · Cited by 193
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Metadata
- Authors
- Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Pärn, E., & Edwards, D. J.
- Venue
- International Journal of Construction Management
- Publisher
- Informa UK Limited
- Published
- 2018-03-26
- Volume
- 19
- Issue
- 5
- Pages
- 436-452
- ISSN
- 1562-3599 (ISSN-L)
- 2331-2327
- OpenAlex
- W2792687402
- Cited by
- 721
- References
- 51
- FWCI
- 25.78
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.