Causes of delay in residential construction projects in Cambodia
Open accessThe DOI matches its Crossref record; 32 of the 32 references it cites were found in a registry or an index.
Abstract
Construction industry is one of the significant contributors to the economic growth and development of Cambodia. Two major challenges are limiting the performance of the construction industry in Cambodia, which are poor cost and schedule performance of the construction projects. Therefore, the aim of this study is to fill an important knowledge gap by identifying the various attributes for construction project delay, using the residential building projects as a starting point. Feedback from a survey administered to the contractors and consultants was analysed using Relative Importance Index (RII). Results showed that shortage of materials on site; unrealistic project scheduling; late delivery of material; shortage of skilled labour; complexity of project; labour absenteeism; late payment by the owner for the completed work; poor site management; delay by subcontractor; accidents due to poor site safety are ranked by the contractors and consultants as the main causes of project delays in Cambodia. Construction frontline players are recommended to put their efforts on the identified key factors in relation to their magnitudes of influence. By doing so, the causes of project delays in the Cambodia’s construction and real estate sector could be significantly reduced or controlled, which will ultimately lead to the on time project completion.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Making sense of cronbach’s alpha.
Tavakol, M., & Dennick, R. (2011) · International Journal of Medical Education · doi:10.5116/ijme.4dfb.8dfd · Cited by 15,126 · cited 1×
“However, even the pilot survey determines the data reliability or relevancy to the industry, it is mandatory to analyse the reliability of the data using the Cronbach’s alpha method based on internal consistency (Tavakol & Dennick, 2011).”
MethodSPSS for Windows Step by Step: A Simple Guide and Reference
Mallery, P., & George, D. (1998) · Cited by 10,394
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705 · cited 2×
“Delay is defined as a time overrun beyond the project completion date agreed by the parties (Assaf & Al-Hejji, 2006).”
BackgroundResearch methods for construction
Fellowa, R., & Liu, A. M. M. (2003) · Cited by 1,448
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422 · cited 3×
“Based on the review of relevant literature, it can be seen that several studies have identified and evaluated causes of project delay in other countries (Doloi et al., 2012; Haseeb et al., 2011; Lindhard & Wandahl, 2014; Sambasivan & Soon, 2007).”
BackgroundHandbook of Research Design and Social Measurement.
McLemore, D., & Miller, D. C. (1978) · Contemporary Sociology · doi:10.2307/2064762 · Cited by 1,269
Causes of construction delay: traditional contracts
Odeh, A. M., & Battaineh, H. T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00037-5 · Cited by 810
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00055-8 · Cited by 796 · cited 1×
“This outcome substantiates the findings of Fugar and Agyakwah-Baah (2010), who ranked the aforementioned factors as one of the most influencing causes of construction project delay in Ghana.”
ResultAnalysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745 · cited 4×
“Based on the review of relevant literature, it can be seen that several studies have identified and evaluated causes of project delay in other countries (Doloi et al., 2012; Haseeb et al., 2011; Lindhard & Wandahl, 2014; Sambasivan & Soon, 2007).”
BackgroundMethodInfluentialCost escalation and schedule delays in road construction projects in Zambia
Kaliba, C., Muya, M., & Mumba, K. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.07.003 · Cited by 596
Cited by
Causes of delays on construction projects: a comprehensive list
Durdyev, S., & Hosseini, M. R. (2019) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-09-2018-0178 · Cited by 245
Self-citation
Metadata
- Authors
- Durdyev, S., Omarov, M., & Ismail, S.
- Venue
- Cogent Engineering
- Publisher
- Informa UK Limited
- Published
- 2017-01-01
- Volume
- 4
- Issue
- 1
- Pages
- 1291117
- ISSN
- 2331-1916 (ISSN-L)
- OpenAlex
- W2587141935
- Cited by
- 158
- References
- 32
- FWCI
- 14.03
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Causes of delay in residential construction projects in Cambodia. https://app.cochat.ai/papers/10.1080/23311916.2017.1291117
- The paper
- Durdyev, S., Omarov, M., & Ismail, S. (2017). Causes of delay in residential construction projects in Cambodia. Cogent Engineering. https://doi.org/10.1080/23311916.2017.1291117
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.