The role of performance measurement in continuous improvement
The DOI matches its Crossref record; 14 of the 14 references it cites were found in a registry or an index.
Abstract
A research study of both kaizen and re‐engineering programmes in a leading international company indicated that the process life cycle has four characteristic stages. A newly designed process commonly suffers from a variety of teething problems during the initial post‐commissioning phase. Once these have been eradicated achieving smooth product flow becomes important in accordance with JIT philosophy. A stable process may be improved by applying a kaizen continuous improvement programme. A dramatic step‐change in performance may be achieved by radical re‐engineering. It is suggested that each of these phases has its own characteristics which should be taken into account when determining performance metrics and designing approaches to process monitoring and control. Explicitly recognising the stage a process has reached in the life cycle provides guidance for practitioners effectively to direct and manage a programme of performance improvement.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
Designing qualitative research
(1989) · Choice Reviews Online · doi:10.5860/choice.27-1232 · Cited by 9,905
(1992) · PubMed · Cited by 7,979
Performance measurement system design: A literature review and research agenda
Neely, A., Gregory, M., & Platts, K. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510083622 · Cited by 3,259
Chief executives define their own data needs.
Rockart, J. F. (1979) · PubMed · Cited by 2,802
Time – The Next Source of Competitive Advantage
Stalk, G. (2012) · The Roots of Logistics · doi:10.1007/978-3-642-27922-5_16 · Cited by 1,187
Measuring manufacturing performance: a new challenge for managerial accounting research
Kaplan, R. S. (1983) · Readings in Accounting for Management Control · doi:10.1007/978-1-4899-7138-8_14 · Cited by 908
World class manufacturing : the lessons of simplicity applied
Schonberger, R. J. (1986) · Cited by 882
The changing basis of performance measurement
Ghalayini, A. M., & Noble, J. S. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610125787 · Cited by 676
The Flexibility of Manufacturing Systems
Slack, N. (1987) · International Journal of Operations & Production Management · doi:10.1108/eb054798 · Cited by 581
Cited by
Barratt, M., Choi, T. Y., & Li, M. (2011) · Journal of Operations Management · doi:10.1016/j.jom.2010.06.002 · Cited by 1,288
Organisational change management: A critical review
By, R. T. (2005) · Journal of Change Management · doi:10.1080/14697010500359250 · Cited by 1,227
Bhasin, S., & Burcher, P. (2006) · Journal of Manufacturing Technology Management · doi:10.1108/17410380610639506 · Cited by 872
Kaizen in Japan: an empirical study
Paul Brunet, A., & New, S. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310506704 · Cited by 332
Pozzi, R., Rossi, T., & Secchi, R. (2023) · Production Planning & Control · doi:10.1080/09537287.2021.1891481 · Cited by 299
Development of key performance measures for the automobile green supply chain
Olugu, E. U., Wong, K. Y., & Shaharoun, A. M. (2011) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.06.003 · Cited by 297
Employee perception of impact of knowledge management processes on public sector performance
Al Ahbabi, S. A., Singh, S. K., Balasubramanian, S., & Gaur, S. S. (2019) · Journal of Knowledge Management · doi:10.1108/jkm-08-2017-0348 · Cited by 263
Bhasin, S. (2012) · International Journal of Productivity and Performance Management · doi:10.1108/17410401211212661 · Cited by 240
Continuous improvement philosophy – literature review and directions
Singh, J., & Singh, H. (2015) · Benchmarking: An International Journal · doi:10.1108/bij-06-2012-0038 · Cited by 220
“Bond (1999) studied both Kaizen and reengineering programmes in a leading international company indicated that the process life cycle has four characteristic stages.”
BackgroundLean and performance measurement
Bhasin, S. (2008) · Journal of Manufacturing Technology Management · doi:10.1108/17410380810877311 · Cited by 219
“) established the momentum for this viewpoint; predecessors ( Bond, 1999”
BackgroundChoudhary, S., Nayak, R., Dora, M., Mishra, N., & Ghadge, A. (2019) · Production Planning & Control · doi:10.1080/09537287.2018.1501811 · Cited by 215
Asset life cycle management: towards improving physical asset performance in the process industry
Schuman, C. A., & Brent, A. C. (2005) · International Journal of Operations & Production Management · doi:10.1108/01443570510599728 · Cited by 207
“For example, in addition to finance dimensions such as profit and shareholder value, customer service, innovation and learning and internal process performance such as quality, are used in new style performance measures ( Bond, 1999 ).”
BackgroundGreen supply chain performance measures: A review and bibliometric analysis
Mishra, D., Gunasekaran, A., Papadopoulos, T., & Hazen, B. (2017) · Sustainable Production and Consumption · doi:10.1016/j.spc.2017.01.003 · Cited by 197
When does lean hurt? – an exploration of lean practices and worker health and safety outcomes
Longoni, A., Pagell, M., Johnston, D., & Veltri, A. (2013) · International Journal of Production Research · doi:10.1080/00207543.2013.765072 · Cited by 194
“Finally, TPM requires improvements in the skill level of employees and the development of an organisational capability to identify and resolve production problems before they occur (e.g. Bond 1999; Brunet and New 2003).”
BackgroundCriteria for a lean organisation: development of a lean assessment tool
Pakdil, F., & Leonard, K. M. (2014) · International Journal of Production Research · doi:10.1080/00207543.2013.879614 · Cited by 190
“Delivery reliability and delivery performance were found to be two of the most important performance indicators in studies (see for example Behrouzi and Wong 2011; Bhasin 2008; Bond 1999; Dimancescu, Hines, and Rich 1997; Doolen and Hacker 2005; Fullerton and Wempe 2009).”
BackgroundDey, P. K., & Cheffi, W. (2013) · Production Planning & Control · doi:10.1080/09537287.2012.666859 · Cited by 188
“It is stated increasingly often that performance measurement is a pillar of the effectiveness of supply chains (Bond 1999, Liang et al. 2006).”
BackgroundGomes, C. F., Yasin, M. M., & Lisboa, J. V. (2004) · Journal of Manufacturing Technology Management · doi:10.1108/17410380410547906 · Cited by 180
Metadata
- Authors
- Bond, T. C.
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 1999-12-01
- Volume
- 19
- Issue
- 12
- Pages
- 1318-1334
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W2093701863
- Cited by
- 222
- References
- 14
- FWCI
- 2.38
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.