Attitudes and perceptions of construction workforce on construction waste in Sri Lanka
Open accessThe DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Abstract
Purpose: The construction industry consumes large amounts of natural resources, which are not properly utilised owing to the generation of waste. Construction waste has challenged the performance of the industry and its sustainable goals. The majority of the causes underlying material waste are directly or indirectly affected by the behaviour of the construction workforce. Waste occurs on site for a number of reasons, most of which can be prevented, particularly by changing the attitudes of the construction workforce. Therefore, the attitudes and perceptions of the construction workforce can influence the generation and implementation of waste management strategies. The research reported in this paper is based on a study aimed at evaluating the attitudes and perceptions of the construction workforce involved during the pre‐ and post‐contract stages towards minimising waste. Design/methodology/approach: A structured questionnaire survey was carried out to understand and evaluate the attitudes and perceptions of the workforce. Four types of questionnaires were prepared for project managers/site managers, supervisors, labourers, and estimators. Findings: The findings indicate the positive perceptions and attitudes of the construction workforce towards minimising waste and conserving natural resources. However, a lack of effort in practising these positive attitudes and perceptions towards waste minimisation is identified. The paper further concludes that negative attitudes towards subordinates, attitudinal differences between different working groups, and a lack of training to reinforce the importance of waste minimisation practices have obstructed proper waste management practices in the industry. Originality/value: The paper reveals the effect of the attitudes and perceptions of the construction workforce towards waste management applications, which would be of benefit to construction managers in designing and implementing better waste management practices.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Construction Waste: Quantification and Source Evaluation
Bossink, B. A. G., & Brouwers, H. J. H. (1996) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1996)122:1(55 · Cited by 578 · cited 4×
“Further, research indicates that 9 percent of the total purchased materials end up as waste (by weight) and 1-10 percent of every single material contributes to the solid waste stream of the site (Bossink and Brouwers, 1996).”
BackgroundInfluentialA theory of waste behaviour in the construction industry
Teo, M. M. M., & Loosemore, M. (2001) · Construction Management and Economics · doi:10.1080/01446190110067037 · Cited by 310 · cited 1×
“Teo and Loosemore (2001) found that attitudes towards waste reduction have become one of the reasons behind the difficulties for the management of waste in the construction industry.”
BackgroundSource Evaluation of Solid Waste in Building Construction
Gavilan, R. M., & Bernold, L. E. (1994) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1994)120:3(536 · Cited by 257 · cited 2×
“Gavilan and Bernold (1994) classify the causes of waste into six categories:”
BackgroundMethod for Waste Control in the Building Industry
Formoso, C. T., Isatto, E. L., & Hirota, E. H. (1999) · Cited by 220
Building environmental assessment methods: assessing construction practices
Cole, R. J. (2000) · Construction Management and Economics · doi:10.1080/014461900446902 · Cited by 143 · cited 2×
“To establish waste management practices within all the levels of working groups in an organization, proper recognition should be given and it should be incorporated within all other operations on the site ( Cole, 2000”
BackgroundCONSTRUCTION MATERIAL WASTE SOURCE EVALUATION
Ekanayake, L. L., & Ofori, G. (2000) · Cited by 112
Improving solid waste reduction and recycling performance using goal setting and feedback
Lingard, H., Gilbert, G., & Graham, P. (2001) · Construction Management and Economics · doi:10.1080/01446190110070952 · Cited by 78 · cited 2×
“Many researchers have shown that there is a positive correlation between waste prevention and environmental sustainability (Federle, 1993; Lingard et al., 2001).”
Background
Cited by
Kabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121265 · Cited by 695
Attitude and behavioral factors in waste management in the construction industry of Malaysia
Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.01.005 · Cited by 315
Esa, M. R., Halog, A., & Rigamonti, L. (2017) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-016-0516-x · Cited by 275
Li, J., Zuo, J., Cai, H., & Zillante, G. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.138 · Cited by 259
Wang, J., Li, Z., & Tam, V. W. Y. (2014) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.11.003 · Cited by 218
Factors affecting contractors’ risk attitudes in construction projects: Case study from China
Wang, J., & Yuan, H. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.006 · Cited by 216
“Udayangani et al. (2006) stated that Likert scales are proper and widely used in attitudinal measurement.”
BackgroundYuan, H., Chini, A. R., Lu, Y., & Shen, L. (2012) · Waste Management · doi:10.1016/j.wasman.2011.11.006 · Cited by 205
Improving waste management in construction projects: An Australian study
Udawatta, N., Zuo, J., Chiveralls, K., & Zillante, G. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.05.003 · Cited by 199
Identifying best design strategies for construction waste minimization
Wang, J., Li, Z., & Tam, V. W. Y. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.12.076 · Cited by 186
Strategies for minimizing construction and demolition wastes in Malaysia
Esa, M. R., Halog, A., & Rigamonti, L. (2017) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2016.12.014 · Cited by 186
Construction waste management in India: an exploratory study
Arif, M., Bendi, D., Toma‐Sabbagh, T., & Sutrisna, M. (2012) · Construction Innovation · doi:10.1108/14714171211215912 · Cited by 103
Metadata
- Authors
- Kulatunga, U., Amaratunga, D., Haigh, R., & Rameezdeen, R.
- Venue
- Management of Environmental Quality: An International Journal
- Publisher
- Emerald
- Published
- 2006-01-01
- Volume
- 17
- Issue
- 1
- Pages
- 57-72
- ISSN
- 1477-7835 (ISSN-L)
- OpenAlex
- W1971223535
- Cited by
- 182
- References
- 7
- FWCI
- 4.39
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.