Factors affecting contractors’ risk attitudes in construction projects: Case study from China
The DOI matches its Crossref record; 29 of the 29 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society. Series A (General) · doi:10.2307/2344428 · Cited by 35,697
Bürgel, O. (2000) · ZEW Economic Studies · doi:10.1007/978-3-642-57671-3_6 · Cited by 3,570
A domain‐specific risk‐attitude scale: measuring risk perceptions and risk behaviors
Weber, E. U., Blais, A., & Betz, N. E. (2002) · Journal of Behavioral Decision Making · doi:10.1002/bdm.414 · Cited by 2,936
Intrinsic motivation, extrinsic reinforcement, and inequity.
Deci, E. L. (1972) · Journal of Personality and Social Psychology · doi:10.1037/h0032355 · Cited by 888 · cited 1×
“According to Deci (1972), intrinsic motivation comes from rewards inherent to a task or activity itself; the intrinsic motivation of a contractor to fight against project risks could originate from various sources.”
BackgroundUnderstanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859 · cited 8×
“…many external economic environment related factors have been considered as important risks in construction projects in China (Shen et al., 2001; Zou et al., 2007), the external economic environment was ranked fairly low in our survey in terms of its influence on contractors’ risk attitudes.”
BackgroundResultInfluentialSelf-citationRisk analysis and management in construction
Akintoye, A. S., & MacLeod, M. J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00035-x · Cited by 755 · cited 1×
“In step one, a thorough literature examination, typically including Akintoye and Macleod (1997), Kaming et al. (1997), Shen et al. (2001), Fang et al. (2004), Ghosh and Jintannapakanont (2004), Wang and Liu (2004), Zou et al. (2007), and Tang et al. (2007), was carried out in order to develop…”
MethodFactors influencing construction time and cost overruns on high-rise projects in Indonesia
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997) · Construction Management and Economics · doi:10.1080/014461997373132 · Cited by 698 · cited 2×
“The wrong RBDM directly results in cost overrun (Kaming et al., 1997), time delay (Shen, 1997; Kaming et al., 1997), bad quality (Lee et al., 2005), poor safety performance (Tam et al., 2004), or/and poor environmental sustainability performance (Dione et al., 2005) of a construction project.”
BackgroundMethodIdentifying elements of poor construction safety management in China
Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004) · Safety Science · doi:10.1016/j.ssci.2003.09.001 · Cited by 590 · cited 1×
“The wrong RBDM directly results in cost overrun (Kaming et al., 1997), time delay (Shen, 1997; Kaming et al., 1997), bad quality (Lee et al., 2005), poor safety performance (Tam et al., 2004), or/and poor environmental sustainability performance (Dione et al., 2005) of a construction project.”
BackgroundApplication of a fuzzy based decision making methodology to construction project risk assessment
Zeng, J., An, M., & Smith, N. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.006 · Cited by 537 · cited 2×
“During the lifecycle of construction projects, especially in the planning phase, the participants are confronted with enormous RBDM problems, which are usually addressed through identifying, analyzing and responding to potential risks, and ultimately optimizing solutions (Al-Bahar and Crangell, 1990; Raftery, 2003; Ze…”
BackgroundThe skills and career path of an effective project manager
El-Sabaa, S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00034-4 · Cited by 449 · cited 1×
“This echoes with Thevendram and Mawdesley (2004) and Sabaa (2001) who both emphasized the importance of human factors to the project success in their studies.”
Background
Cited by
Construction and demolition waste management in China through the 3R principle
Huang, B., Wang, X., Kua, H., Geng, Y., Bleischwitz, R., & Ren, J. (2018) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.09.029 · Cited by 1,047
Risk Assessment Using a New Consulting Process in Fuzzy AHP
Lyu, H.-M., Sun, W.-J., Shen, S.-L., & Zhou, A.-N. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001757 · Cited by 279
Xia, N., Zou, P. X. W., Griffin, M. A., Wang, X., & Zhong, R. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.03.006 · Cited by 229
“Specifically, risk-based decisions such as the decision on the concession period between the public and private sector in a PPP arrangement can vary (Xu and Moon, 2014) can vary among stakeholders (e.g., Shealy et al., 2016; Van Os et al., 2015; Wang and Yuan, 2011; J. Wang et al., 2016).”
Background
Metadata
- Authors
- Wang, J., & Yuan, H.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2011-02
- Volume
- 29
- Issue
- 2
- Pages
- 209-219
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2005961314
- Cited by
- 216
- References
- 29
- FWCI
- 9.59
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Factors affecting contractors’ risk attitudes in construction projects: Case study from China. https://app.cochat.ai/papers/10.1016/j.ijproman.2010.02.006
- The paper
- Wang, J., & Yuan, H. (2011). Factors affecting contractors’ risk attitudes in construction projects: Case study from China. International Journal of Project Management. https://doi.org/10.1016/j.ijproman.2010.02.006
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.