Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry
Open accessThe DOI matches its Crossref record; 58 of the 58 references it cites were found in a registry or an index.
Abstract
Purpose: The purpose of this paper is to identify and assess the perceptions of constructional professionals on barriers to implementation of building information modeling (BIM) within the Nigerian construction industry. Design/methodology/approach: A scoping literature review was conducted to identify the fourteen barriers to implementation of BIM, which were employed to design a questionnaire survey. Data collected were analyzed using descriptive statistics, mean score, Kruskal–Wallis test, analysis of variance and multivariate techniques such as factor analysis. Findings: The descriptive and empirical analysis demonstrated a disparity of ranking of the 14 barriers factors among the groups; however no statistically significant differences among the 14 barriers to BIM. Based on the mean score ranking results, only three (out of 14) barriers are identified as critical (mean score greater than 3.5): few studies available on BIM and lack of knowledge, inexistence or inadequate government policies, and high cost of implementation. The results of the one-sample t-tests show that they were statistically significant differences in 10 out of 14 barriers as follows: few studies available on BIM and lack of knowledge, lack of demand for use and acceptance of BIM, inadequate contractual coordination, lack of specified standards, cost of data and information sharing, technological availability issues, reluctance of other stakeholders, business and cultural changes, data and intellectual property issues, and interoperability issues. The study, through factor analysis, categorized the fourteen barriers to BIM implementation into four principal factors. The factors are: technology and business-related barriers; training and people-related barriers; cost and standards-related barriers; and process and economic-related barriers. Practical implications: The identification and assessment of the key barriers to BIM implementation would be useful for the construction professionals and other stakeholder of the construction industry with the view to advance BIM adoption in Nigeria. This could also be extended to other developing countries through considerations of the local economic conditions, given the status of BIM as being in the germinating stage of development in Africa. Originality/value: The study provides insights on the barriers to BIM implementation across the Nigerian construction sector environments. The innovative aspect of the study is the identification of the ordered and grouped (composite) set of barriers to BIM which could be used to developing appropriate mitigating solutions.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Coefficient Alpha and the Internal Structure of Tests
Cronbach, L. J. (1951) · Psychometrika · doi:10.1007/bf02310555 · Cited by 43,931
An Index of Factorial Simplicity
Kaiser, H. F. (1974) · Psychometrika · doi:10.1007/bf02291575 · Cited by 14,898
A typology of reviews: an analysis of 14 review types and associated methodologies
Grant, M. J., & Booth, A. (2009) · Health Information & Libraries Journal · doi:10.1111/j.1471-1842.2009.00848.x · Cited by 10,817
The Varimax Criterion for Analytic Rotation in Factor Analysis
Kaiser, H. F. (1958) · Psychometrika · doi:10.1007/bf02289233 · Cited by 7,580
A Second Generation Little Jiffy
Kaiser, H. F. (1970) · Psychometrika · doi:10.1007/bf02291817 · Cited by 4,785
A Note on the Multiplying Factors for Various χ2 Approximations
Bartlett, M. S. (1954) · Journal of the Royal Statistical Society Series B: Statistical Methodology · doi:10.1111/j.2517-6161.1954.tb00174.x · Cited by 2,875
Exploratory Factor Analysis: A Five-Step Guide for Novices
Williams, B., Onsman, A., & Brown, T. (2010) · Australasian Journal of Paramedicine · doi:10.33151/ajp.8.3.93 · Cited by 2,739
Cronbach's Alpha: A Tool for Assessing the Reliability of Scales
Santos, J. R. A. (1999) · Journal of Extension · doi:10.66752/1077-5315.7392 · Cited by 1,554
Research Report: Empirical Test of an EDI Adoption Model
Chwelos, P., Benbasat, I., & Dexter, A. S. (2001) · Information Systems Research · doi:10.1287/isre.12.3.304.9708 · Cited by 1,157
Analysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745
Cited by
Olanrewaju, O. I., Kineber, A. F., Chileshe, N., & Edwards, D. J. (2022) · Building and Environment · doi:10.1016/j.buildenv.2021.108556 · Cited by 198
Self-citation
Metadata
- Authors
- Olanrewaju, O. I., Chileshe, N., Babarinde, S. A., & Sandanayake, M.
- Venue
- Engineering, Construction and Architectural Management
- Publisher
- Emerald
- Published
- 2020-05-15
- Volume
- 27
- Issue
- 10
- Pages
- 2931-2958
- ISSN
- 0969-9988 (ISSN-L)
- OpenAlex
- W3025286740
- Cited by
- 176
- References
- 58
- FWCI
- 10.93
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.