Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry
Open accessThe DOI matches its Crossref record; 58 of the 58 references it cites were found in a registry or an index.
Abstract
Purpose: The purpose of this paper is to identify and assess the perceptions of constructional professionals on barriers to implementation of building information modeling (BIM) within the Nigerian construction industry. Design/methodology/approach: A scoping literature review was conducted to identify the fourteen barriers to implementation of BIM, which were employed to design a questionnaire survey. Data collected were analyzed using descriptive statistics, mean score, Kruskal–Wallis test, analysis of variance and multivariate techniques such as factor analysis. Findings: The descriptive and empirical analysis demonstrated a disparity of ranking of the 14 barriers factors among the groups; however no statistically significant differences among the 14 barriers to BIM. Based on the mean score ranking results, only three (out of 14) barriers are identified as critical (mean score greater than 3.5): few studies available on BIM and lack of knowledge, inexistence or inadequate government policies, and high cost of implementation. The results of the one-sample t-tests show that they were statistically significant differences in 10 out of 14 barriers as follows: few studies available on BIM and lack of knowledge, lack of demand for use and acceptance of BIM, inadequate contractual coordination, lack of specified standards, cost of data and information sharing, technological availability issues, reluctance of other stakeholders, business and cultural changes, data and intellectual property issues, and interoperability issues. The study, through factor analysis, categorized the fourteen barriers to BIM implementation into four principal factors. The factors are: technology and business-related barriers; training and people-related barriers; cost and standards-related barriers; and process and economic-related barriers. Practical implications: The identification and assessment of the key barriers to BIM implementation would be useful for the construction professionals and other stakeholder of the construction industry with the view to advance BIM adoption in Nigeria. This could also be extended to other developing countries through considerations of the local economic conditions, given the status of BIM as being in the germinating stage of development in Africa. Originality/value: The study provides insights on the barriers to BIM implementation across the Nigerian construction sector environments. The innovative aspect of the study is the identification of the ordered and grouped (composite) set of barriers to BIM which could be used to developing appropriate mitigating solutions.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Coefficient Alpha and the Internal Structure of Tests
Cronbach, L. J. (1951) · Psychometrika · doi:10.1007/bf02310555 · Cited by 43,931
An Index of Factorial Simplicity
Kaiser, H. F. (1974) · Psychometrika · doi:10.1007/bf02291575 · Cited by 14,898
A typology of reviews: an analysis of 14 review types and associated methodologies
Grant, M. J., & Booth, A. (2009) · Health Information & Libraries Journal · doi:10.1111/j.1471-1842.2009.00848.x · Cited by 10,817
The Varimax Criterion for Analytic Rotation in Factor Analysis
Kaiser, H. F. (1958) · Psychometrika · doi:10.1007/bf02289233 · Cited by 7,580
A Second Generation Little Jiffy
Kaiser, H. F. (1970) · Psychometrika · doi:10.1007/bf02291817 · Cited by 4,785
A Note on the Multiplying Factors for Various χ2 Approximations
Bartlett, M. S. (1954) · Journal of the Royal Statistical Society Series B: Statistical Methodology · doi:10.1111/j.2517-6161.1954.tb00174.x · Cited by 2,875
Exploratory Factor Analysis: A Five-Step Guide for Novices
Williams, B., Onsman, A., & Brown, T. (2010) · Australasian Journal of Paramedicine · doi:10.33151/ajp.8.3.93 · Cited by 2,739
Cronbach's Alpha: A Tool for Assessing the Reliability of Scales
Santos, J. R. A. (1999) · Journal of Extension · doi:10.66752/1077-5315.7392 · Cited by 1,554
Research Report: Empirical Test of an EDI Adoption Model
Chwelos, P., Benbasat, I., & Dexter, A. S. (2001) · Information Systems Research · doi:10.1287/isre.12.3.304.9708 · Cited by 1,157
Analysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745
Building information modelling (BIM): now and beyond
Azhar, S., Khalfan, M., & Maqsood, T. (2015) · Construction Economics and Building · doi:10.5130/ajceb.v12i4.3032 · Cited by 671
Building information modeling for sustainable design and LEED® rating analysis
Azhar, S., Carlton, W. A., Olsen, D., & Ahmad, I. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.019 · Cited by 607
Tan, T., Chen, K., Xue, F., & Lu, W. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.02.141 · Cited by 407
Extension's Portfolio for the 21st Century: A Place for One-on-One Consultations
Petrzelka, P., Padgitt, S., & Wintersteen, W. (1999) · Journal of Extension · doi:10.66752/1077-5315.7569 · Cited by 289
Building information modelling demystified: does it make business sense to adopt BIM?
Aranda‐Mena, G., Crawford, J., Chevez, A., & Froese, T. (2009) · International Journal of Managing Projects in Business · doi:10.1108/17538370910971063 · Cited by 278
Changing roles of the clients, architects and contractors through BIM
Sebastian, R. (2011) · Engineering, Construction and Architectural Management · doi:10.1108/09699981111111148 · Cited by 274
Collaboration barriers in BIM-based construction networks: A conceptual model
Oraee, M., Hosseini, M. R., Edwards, D. J., Li, H., Papadonikolaki, E., & Cao, D. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.05.004 · Cited by 251
Ghosh, S., & Jintanapakanont, J. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.05.004 · Cited by 242
Abubakar, M., Ibrahim, Y. M., Dikko, K., & Bala, K. (2014) · International Conference on Computing in Civil and Building Engineering (ICCCBE) · doi:10.1061/9780784413616.022 · Cited by 234
Georgiadou, M. C. (2019) · Construction Innovation · doi:10.1108/ci-04-2017-0030 · Cited by 218
Rogers, J., Chong, H.-Y., & Preece, C. (2015) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-05-2014-0067 · Cited by 215
., Z. Z. (2013) · International Journal of Research in Engineering and Technology · doi:10.15623/ijret.2013.0208060 · Cited by 210
BIM Experiences and Expectations: The Constructors' Perspective
Ku, K., & Taiebat, M. (2011) · International Journal of Construction Education and Research · doi:10.1080/15578771.2010.544155 · Cited by 205
Hosseini, M. R., Banihashemi, S., Chileshe, N., Namzadi, M. O., Udaeja, C., Rameezdeen, R., & McCuen, T. (2016) · Construction Economics and Building · doi:10.5130/ajceb.v16i3.5159 · Cited by 195
Self-citationCritical success factors in small and medium enterprises: Survey results
Yusof, S. M., & Aspinwall, E. M. (2000) · Total Quality Management · doi:10.1080/09544120050007760 · Cited by 185
Shurrab, J., Hussain, M., & Khan, M. (2019) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-02-2018-0056 · Cited by 182
The Likert scale revisited: an alternate version
Albaum, G. (1997) · Market Research Society Journal · Cited by 176
BIM Execution Planning in Green Building Projects: LEED as a Use Case
Wu, W., & Issa, R. R. A. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000314 · Cited by 172
Saka, A. B., & Chan, D. W. M. (2020) · Construction Innovation · doi:10.1108/ci-09-2019-0087 · Cited by 168
Bridging the digital divide gap in BIM technology adoption
Ayinla, K. O., & Adamu, Z. A. (2018) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2017-0091 · Cited by 167
A Scientometric Review and Metasynthesis of Building Information Modelling (BIM) Research in Africa
Saka, A. B., & Chan, D. W. M. (2019) · Buildings · doi:10.3390/buildings9040085 · Cited by 166
Yalegama, S., Chileshe, N., & Ma, T. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.02.006 · Cited by 163
Self-citationBarriers to BIM implementation strategies in China
Zhou, Y., Yang, Y., & Yang, J.-B. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-04-2018-0158 · Cited by 163
Challenges when implementing BIM for industry change
Vass, S., & Gustavsson, T. K. (2017) · Construction Management and Economics · doi:10.1080/01446193.2017.1314519 · Cited by 160
Bosch‐Sijtsema, P. M., Isaksson, A., Lennartsson, M., & Linderoth, H. C. J. (2017) · Visualization in Engineering · doi:10.1186/s40327-017-0040-7 · Cited by 157
Building Information Modelling Adoption: An Analysis of the Barriers of Implementation
Eadie, R., Odeyinka, H. A., Browne, M. J., Mahon, C., & Yohanis, M. (2014) · Ulster University Research Portal (Ulster University) · Cited by 150
Drivers of productivity among construction workers: A study in a developing country
Kazaz, A., & Ulubeyli, S. (2006) · Building and Environment · doi:10.1016/j.buildenv.2006.04.020 · Cited by 140
Chan, T. W. (2014) · Journal of System and Management Sciences · Cited by 135
Building information modelling and green buildings: challenges and opportunities
Raouf, A. M., & Al‐Ghamdi, S. G. (2018) · Architectural Engineering and Design Management · doi:10.1080/17452007.2018.1502655 · Cited by 133
Critical success factors for building information modelling (BIM) implementation in Hong Kong
Chan, D. W. M., Olawumi, T. O., & Ho, A. M. L. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2018-0204 · Cited by 132
Development of a benchmarking model for BIM implementation in developing countries
Olawumi, T. O., & Chan, D. W. M. (2019) · Benchmarking An International Journal · doi:10.1108/bij-05-2018-0138 · Cited by 88
Ma, X., Chan, A. P. C., Li, Y., Zhang, B., & Xiong, F. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001748 · Cited by 87
Saka, A. B., & Chan, D. W. M. (2019) · Architectural Engineering and Design Management · doi:10.1080/17452007.2019.1651247 · Cited by 80
Olawumi, T. O., & Chan, D. W. M. (2019) · Construction Innovation · doi:10.1108/ci-08-2018-0065 · Cited by 73
Critical factors influencing the bid/no bid decision in the Australian construction industry
Shokri-Ghasabeh, M., & Chileshe, N. (2016) · Construction Innovation · doi:10.1108/ci-04-2015-0021 · Cited by 72
Self-citationBarriers of Adoption Building Information Modeling (BIM) in Construction Projects of Iraq
Hatem, W. A., Abd, A. M., & Abbas, N. N. (2018) · Engineering Journal · doi:10.4186/ej.2018.22.2.59 · Cited by 71
On what makes a significant contribution to the retailing literature
BROWN, J., & Dant, R. P. (2008) · Journal of Retailing · doi:10.1016/j.jretai.2008.05.002 · Cited by 62
Preliminary building information modelling adoption model in Malaysia
Enegbuma, W. I., Aliagha, G. U., & Ali, K. N. (2014) · Construction Innovation · doi:10.1108/ci-01-2014-0012 · Cited by 60
A global taxonomic review and analysis of the development of BIM research between 2006 and 2017
Saka, A. B., & Chan, D. W. M. (2019) · Construction Innovation · doi:10.1108/ci-12-2018-0097 · Cited by 47
BIM and construction contracts – CPC 2013’s approach
Gibbs, D.-J., Emmitt, S., Lord, W. E., & Ruikar, K. D. (2015) · Proceedings of the Institution of Civil Engineers - Management Procurement and Law · doi:10.1680/jmapl.14.00045 · Cited by 46
Rodgers, C., Hosseini, M. R., Chileshe, N., & Rameezdeen, R. (2015) · Deakin Research Online (Deakin University) · Cited by 43
Self-citationAddy, M. N., Adinyira, E., & Ayarkwa, J. (2018) · Journal of Engineering Design and Technology · doi:10.1108/jedt-06-2017-0056 · Cited by 41
An investigation into the legal issues relating to Building Information Modelling (BIM)
Eadie, R., McLernon, T., & Patton, A. (2015) · Ulster University Research Portal (Ulster University) · Cited by 33
Olapade, D. T., & Ekemode, B. G. (2018) · Journal of Facilities Management · doi:10.1108/jfm-09-2017-0046 · Cited by 30
Seok-Jun, K. O. N. G., Lau, T. L., Wong, S. Y., et al. (2020) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/713/1/012035 · Cited by 25
What are the Barriers and Drivers Toward BIM Adoption in Nigeria?
Hamma-Adama, M., & Kouider, T. (2019) · Creative Construction Conference (CCC) · doi:10.3311/ccc2019-073 · Cited by 21
Musa, S., Marshall-Ponting, A., Shahron, S. A., & Nifa, F. A. A. (2019) · Journal of Computational and Theoretical Nanoscience · doi:10.1166/jctn.2019.8542 · Cited by 7
Weather Variability and Climate Change Impacts on the Mental Health of a Seaside Community
Seixas, S., Hoeffel, J. L., Renk, M., Asmus, G. F., & de Lima, F. B. (2016) · Journal of Scientific Research and Reports · doi:10.9734/jsrr/2016/26194 · Cited by 6
Cited by
Olanrewaju, O. I., Kineber, A. F., Chileshe, N., & Edwards, D. J. (2022) · Building and Environment · doi:10.1016/j.buildenv.2021.108556 · Cited by 198
Self-citation
Metadata
- Authors
- Olanrewaju, O. I., Chileshe, N., Babarinde, S. A., & Sandanayake, M.
- Venue
- Engineering, Construction and Architectural Management
- Publisher
- Emerald
- Published
- 2020-05-15
- Volume
- 27
- Issue
- 10
- Pages
- 2931-2958
- ISSN
- 0969-9988 (ISSN-L)
- OpenAlex
- W3025286740
- Cited by
- 176
- References
- 58
- FWCI
- 10.93
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.