Accommodating new ways of working: lessons from best practices and worst cases
Open accessThe DOI matches its Crossref record; 37 of the 38 references it cites were found in a registry or an index.
Abstract
Purpose The purpose of this study is to explore which factors may explain the high or low percentages of satisfied employees in offices with shared activity-based workplaces. Design/methodology/approach The paper compares data on employee satisfaction from two cases with remarkably high satisfaction scores and two cases with significantly lower satisfaction scores (total N = 930), all of the same organisation. These cases were selected from a database with employee responses to a standardised questionnaire in 52 flexible work environments. In the four case studies, also group interviews were conducted. Findings Overall, there are large differences in employee satisfaction between cases with, at first sight, a similar activity-based office concept. The main differences between the best and worst cases regard employee satisfaction with the interior design, level of openness, subdivision of space, number and diversity of work places and accessibility of the building. Employee satisfaction shows to be influenced by many physical characteristics of the work environment and by the implementation process. Satisfaction with the organisation may have an impact as well. Research limitations/implications Almost all cases regard Dutch organisations. Due to the lack of quantitative scales to define the physical characteristics of the work environment, the study is mainly descriptive and explorative and does not include advanced multivariate statistical analyses. Practical implications The…
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Despite this, many companies implement ABWs (Appel-Meulenbroek, Groenen, and Janssen 2011;Brunia, de Been, and van der Voordt 2016;van Koetsveld and Kamperman 2011;Toivanen 2015;Vos and van der Voordt 2002).”
From Perceptions of performance and satisfaction after relocation to an activity-based office (2018) · cites this paper as Brunia, de Been, and van der Voordt 2016
In the citing paper
“The positive work condition consequences, claimed to increase performance in ABWs compared with OPOs (Brill, Weidemann, and Associates 2001;Brunia, de Been, and van der Voordt 2016) were thereby limited.”
From Perceptions of performance and satisfaction after relocation to an activity-based office (2018) · cites this paper as Brunia, de Been, and van der Voordt 2016
In the citing paper
“the ABW concept did not improve communication and teamwork”
From Perceptions of performance and satisfaction after relocation to an activity-based office (2018) · cites this paper as Brunia, de Been, and van der Voordt (2016)
Citations
Cites
Hartley, J. (2004) · Essential Guide to Qualitative Methods in Organizational Research · doi:10.4135/9781446280119.n26 · Cited by 15,461
Why change programs don't produce change.
Beer, M., Eisenstat, R. A., & Spector, B. (1990) · PubMed · Cited by 1,595
Workspace satisfaction: The privacy-communication trade-off in open-plan offices
Kim, J., & de Dear, R. (2013) · Journal of Environmental Psychology · doi:10.1016/j.jenvp.2013.06.007 · Cited by 673
Innovation Implementation: Overcoming the Challenge
Klein, K. J., & Knight, A. P. (2005) · Current Directions in Psychological Science · doi:10.1111/j.0963-7214.2005.00373.x · Cited by 409
Traditional versus Open Office Design: A Longitudinal Field Study
Brennan, A., Chugh, J. S., & Kline, T. (2002) · Environment and Behavior · doi:10.1177/0013916502034003001 · Cited by 402
Office Type in Relation to Health, Well-Being, and Job Satisfaction Among Employees
Danielsson, C. B., & Bodin, L. (2008) · Environment and Behavior · doi:10.1177/0013916507307459 · Cited by 363
Office noise and employee concentration: Identifying causes of disruption and potential improvements
Banbury, S., & Berry, D. (2005) · Ergonomics · doi:10.1080/00140130412331311390 · Cited by 349
Productivity and employee satisfaction in flexible workplaces
van der Voordt, T. J. M. (2004) · Journal of Corporate Real Estate · doi:10.1108/14630010410812306 · Cited by 309
An end‐user's perspective on activity‐based office concepts
Appel‐Meulenbroek, R., Groenen, P., & Janssen, I. (2011) · Journal of Corporate Real Estate · doi:10.1108/14630011111136830 · Cited by 268
The influence of office type on satisfaction and perceived productivity support
De Been, I., & Beijer, M. (2014) · Journal of Facilities Management · doi:10.1108/jfm-02-2013-0011 · Cited by 250
Research works printed but not linked: 12
- 2004, Working without Walls
- Bakker, I. (2014), “Uncovering the secrets of a productive work environment. A journey through the impact of plants and colour”, PhD thesis, Faculty of Industrial design, TU Delft.
- 1993, The Ecology of New Ways of Working: Non Territorial Offices
- 1979, Open plan offices, landscape offices and celltype office, Architektur, 16
- 2007, Effectieve Implementatie van Kantoorinnovatie
- 1998, De (on-)mogelijkheden van kantoorinnovatie. Een fenomeen beschouwd, M&O, 1, 7
- 1996, The New Office
- 2007, Organisational Behaviour
- 2004, Kantoorinnovatie moet je willen, kunnen en moeten
- 2003, Costs and Benefits of Innovative Workplace Design
- 2012, Evidence-based decision-making on office accommodation: accommodation choice mode
- 2016, Satisfaction
Cited by
Items 101–200 of 255
New Ways of Working in Academia: Maneuvering in and with Ambiguity in Workspace Design Processes
Jemine, G., Pichault, F., & Dubois, C. (2022) · M n gement · doi:10.37725/mgmt.v25.4447 · Cited by 11
Göçer, Ö., Cândido, C., Göçer, K., Brambilla, A., Thomas, L., Biloria, N. M., Mackey, M., Alizadeh, T., & Sarkar, S. (2022) · Building and Environment · doi:10.1016/j.buildenv.2022.109273 · Cited by 11
Influence of dynamic changes of workplace on organisational culture
Nanayakkara, K., Wilkinson, S. J., & Halvitigala, D. (2021) · Journal of Management & Organization · doi:10.1017/jmo.2021.69 · Cited by 11
Markkanen, P. M. H., & Herneoja, A. (2024) · Building Research & Information · doi:10.1080/09613218.2024.2372024 · Cited by 11
Policies for sharing workspaces in activity-based flex offices
Rolfö, L., & Chafi, M. B. (2017) · Chalmers Research (Chalmers University of Technology) · Cited by 10
Predictors of Preference for the Activity-based Flexible Office
Rolfö, L., Jahncke, H., Järvholm, L. S., Öhrn, M., & Chafi, M. B. (2018) · Advances in intelligent systems and computing · doi:10.1007/978-3-030-02053-8_83 · Cited by 10
Abdulhamid, N. J., & Majid, Z. K. (2020) · International Symposium on Multidisciplinary Studies and Innovative Technologies (ISMSIT) · doi:10.1109/ismsit50672.2020.9254817 · Cited by 10
Balancing privacy and communication in activity-based workspaces: a longitudinal study
Rücker, M., Eismann, T., Meinel, M., Söllner, A., & Voigt, K. (2022) · Journal of Corporate Real Estate · doi:10.1108/jcre-11-2021-0038 · Cited by 11
Giauque, D., Cornu, F., Renard, K., & Emery, Y. (2023) · Sustainability · doi:10.3390/su151411167 · Cited by 11
Haapakangas, A. (2017) · UTUPub (University of Turku) · Cited by 11
Bergsten, E. L., Wijk, K., & Hallman, D. (2022) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph192114338 · Cited by 9
Lauterbach, A. S., & Kunze, F. (2023) · Environment and Behavior · doi:10.1177/00139165231163549 · Cited by 9
The Duality of the Physical and Virtual Worlds of Work
Nappi, I., & Ribeiro, G. D. C. (2021) · Dynamics of virtual work · doi:10.1007/978-3-030-80327-8_10 · Cited by 9
A bibliometric analysis of the first 20 years of the Journal of Corporate Real Estate
Maggon, M. (2022) · Journal of Corporate Real Estate · doi:10.1108/jcre-03-2022-0005 · Cited by 9
De-scripting office design: exploring design intentions in use
Søiland, E. (2021) · Journal of Corporate Real Estate · doi:10.1108/jcre-10-2020-0039 · Cited by 9
Teleworking under Pressure: Job Demands, Resources, and Leadership in a Fragile-State Context
Ghrayche, N., Rodríguez-Escobar, J. A., Lissillour, R., & Ramjawan, S. (2025) · Management Research Quarterly · doi:10.63029/24z6ym31 · Cited by 8
Design and management considerations towards productively sustainable work places in Saudi Arabia
Hassanain, M. A., Almhbash, T. S., Zami, M. S., Ibrahim, A. M., & Alshibani, A. (2024) · Journal of Corporate Real Estate · doi:10.1108/jcre-07-2023-0029 · Cited by 8
From coordinating in space to coordinating through space: A spatial perspective on coordinating
Räcker, T., Geiger, D., & Seidl, D. N. (2024) · Organization Theory · doi:10.1177/26317877241270124 · Cited by 9
Herneoja, A., Markkanen, P. M. H., & Juuti, E. (2022) · Journal of Corporate Real Estate · doi:10.1108/jcre-12-2020-0070 · Cited by 8
Rise and Fall of a New Way of Working: A Testament of an Organizational Identity Mimicry
Antoine, M. (2021) · Technology, work and globalization · doi:10.1007/978-3-030-61687-8_17 · Cited by 8
Methodological considerations in the open-plan office paradox: A systematic literature review
Bennis, W. M., Mayerhoffer, M., Orel, M., & Lukeš, M. (2022) · Work · doi:10.3233/wor-210820 · Cited by 8
The Future of Work: Personal and Engaging Practices for a Superior Productivity
Zapata-Cantú, L. (2022) · Organizational Innovation in the Digital Age · doi:10.1007/978-3-030-98183-9_5 · Cited by 7
Forooraghi, M., Hultberg, A., Jónsdóttir, I. H., & Chafi, M. B. (2025) · Ergonomics · doi:10.1080/00140139.2025.2475350 · Cited by 7
Hansson, J., Vinberg, S., Wall, E., & Löfstrand, P. (2025) · PLoS ONE · doi:10.1371/journal.pone.0320324 · Cited by 7
Mind Your Space! Desk Sharing Working Environments and Employee Commitment in Austria
Worek, M., Venegas, B. C., & Thury, S. (2019) · European Journal of Business Science and Technology · doi:10.11118/ejobsat.v5i1.159 · Cited by 7
Nooij, B., Kingma, S. F., & Veenswijk, M. B. (2022) · Facilities · doi:10.1108/f-06-2020-0067 · Cited by 7
Güler, G. Y., & Demirkan, H. (2024) · International Journal of Architectural Research Archnet-IJAR · doi:10.1108/arch-03-2024-0123 · Cited by 6
Giauque, D., Cornu, F., & Pacht, S. (2024) · Administrative Sciences · doi:10.3390/admsci14120338 · Cited by 6
Meyer, S.-C., Hartwig, M., Tisch, A., & Wischniewski, S. (2022) · Nomos Verlagsgesellschaft mbH & Co. KG eBooks · doi:10.5771/9783748927372-313 · Cited by 6
Human Factors in Manufacturing: A Systematic Literature Review
Garofalo, F., & Puangseree, P. (2023) · Lecture notes in computer science · doi:10.1007/978-3-031-35741-1_27 · Cited by 6
Income disparities and risk: Geographical manifestations of extreme inequities in the United States
Greenberg, M., & Schneider, D. F. (2024) · Risk Analysis · doi:10.1111/risa.14349 · Cited by 6
New work practices and their drivers in FIREB firms: evidence from Hong Kong
Oladinrin, O. T., Jayantha, W. M., & Ojo, L. D. (2022) · Journal of Corporate Real Estate · doi:10.1108/jcre-04-2022-0008 · Cited by 6
Physical and social isolation in various places of work
Aidla, A., Poltimäe, H., Rõigas, K., Kindsiko, E., & Metsmaa, E. M. (2023) · Journal of Corporate Real Estate · doi:10.1108/jcre-03-2023-0009 · Cited by 6
Exploring ways to study the workplace design in a small knowledge work company
Markkanen, P. M. H., Juuti, E., & Herneoja, A. (2022) · Journal of Corporate Real Estate · doi:10.1108/jcre-01-2021-0006 · Cited by 6
Why come to the office? Investigating employee return to office in hybrid work
Rosgaard, A., Flamand, M. B., Edwards, K., Ipsen, C., & Madsen, M. B. (2025) · Facilities · doi:10.1108/f-02-2025-0024 · Cited by 5
Haapakangas, A., Ropponen, A., Tulenheimo-Eklund, E., Ruohomäki, V., & Reijula, K. E. (2024) · Journal of Occupational and Environmental Medicine · doi:10.1097/jom.0000000000003287 · Cited by 5
POP UP – Kehittämismalli tuottavaan tietotyöhön
Peltoniemi, S., Poutanen, J., Vuolle, M., Vartiainen, M. A., Ahtinen, A., Horstia, J., Palomäki, E., Salonius, H., Sivunen, A. E., & Väänänen, K. (2017) · Tampere University Institutional Repository (Tampere University) · Cited by 5
Space for Tensions: A Lefebvrian Perspective on New Ways of Working
Barth, A. S., & Blazejewski, S. (2021) · Technology, work and globalization · doi:10.1007/978-3-030-61687-8_11 · Cited by 5
Relocation to Activity-Based Workplaces (ABW)—Importance of the Implementation Process
Bergsten, E. L., Wijk, K., & Hallman, D. (2021) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph182111456 · Cited by 6
Harnessing knowledge of building end-users: identifying knowledge brokers that matter
Waheed, Z., & Ogunlana, S. O. (2019) · Journal of Corporate Real Estate · doi:10.1108/jcre-12-2017-0049 · Cited by 5
Surma, M. J. (2023) · CentAUR (University of Reading) · doi:10.48683/1926.00113930 · Cited by 5
Monipaikkaisen työn valmiudet ja käytännöt – Tutkimushankkeen loppuraportti
Eskelinen, J., Kuula, M., Bordi, L., Heikkilä-Tammi, K., Larjovuori, R.-L., Mansner, S., & Miettinen, M. (2024) · Aaltodoc (Aalto University) · Cited by 5
The Multifaceted Impact of Open Space on Teams Members
Delerue, H., Serres, A. D., & Sicotte, H. (2019) · Annual European Real Estate Society Conference (ERES) · doi:10.15396/eres2019_148 · Cited by 4
Activity-based working and their impact on organisational culture – employees’ perspectives
Nanayakkara, K., Wilkinson, S. J., & Halvitigala, D. (2023) · Facilities · doi:10.1108/f-03-2023-0017 · Cited by 4
IV. Informationsbezogene Tätigkeiten
Tegtmeier, P., Certa, M., & Wischniewski, S. (2022) · Nomos Verlagsgesellschaft mbH & Co. KG eBooks · doi:10.5771/9783748927372-133 · Cited by 4
Fincke, I., Harth, V., & Mache, S. (2017) · Zentralblatt für Arbeitsmedizin Arbeitsschutz und Ergonomie · doi:10.1007/s40664-017-0236-7 · Cited by 4
Cordero, A. C. (2019) · Chalmers Research (Chalmers University of Technology) · Cited by 4
The Modern Workplace in Service Management: Possibilities, Realities, New Ways of Working
Kalve, I. (2020) · Springer proceedings in business and economics · doi:10.1007/978-3-030-44711-3_28 · Cited by 4
Post-pandemic adaptive university campus management
Nenonen, S., & Danivska, V. (2021) · Breda University of Applied Sciences Portal · Cited by 4
Real estate in the digital era
Harris, R. (2019) · Journal of General Management · doi:10.1177/0306307019834404 · Cited by 4
Real cost of flex-offices: discourse and reality
Nappi, I., & Eddial, H. (2021) · Journal of Corporate Real Estate · doi:10.1108/jcre-02-2020-0006 · Cited by 4
Beyond the coffee corner: Workplace design and social well-being
Colenberg, S. (2023) · Research Repository (Delft University of Technology) · doi:10.4233/uuid:51968bff-1313-437f-8e36-0966cf6b19e0 · Cited by 4
Sirola, P., Hirvonen, S., Malve-Ahlroth, S., Haapakangas, A., & Reijula, K. E. (2024) · Studies in health technology and informatics · doi:10.3233/shti240948 · Cited by 4
Possibility of personalization and customization of the workplace by knowledge workers
Sarı, R., & Pekeriçli, M. K. (2025) · Building Research & Information · doi:10.1080/09613218.2025.2558561 · Cited by 3
Design for UX in Flexible Offices – Bringing Research and Practice Together
Cordero, A. C., & Chafi, M. B. (2021) · Lecture notes in networks and systems · doi:10.1007/978-3-030-74614-8_1 · Cited by 3
Research of Acoustic Properties of Modern Building Structures
Sankov, P., Zakharov, Y. O., Zakharov, V. A., & Hvadzhaia, B. D. (2020) · Lecture notes in civil engineering · doi:10.1007/978-3-030-42939-3_23 · Cited by 3
VII. Technischer und organisatorischer Arbeitsschutz in der digitalisierten Arbeitswelt
Robelski, Vock, Richter, Kittelmann, Westhoven, Gabriel, Voß, & Sommer (2022) · Nomos Verlagsgesellschaft mbH & Co. KG eBooks · doi:10.5771/9783748927372-273 · Cited by 3
Health-Supportive Office Design—It Is Chafing Somewhere: Where and Why?
Danielsson, C. B., & Hoy, S. (2022) · Sustainability · doi:10.3390/su141912504 · Cited by 3
Beyond Flexibility: Confronting Conceived and Lived Spaces of New Ways of Working
Jemine, G., Fauconneau-Dufresne, S., Pichault, F., & Rondeaux, G. (2021) · Technology, work and globalization · doi:10.1007/978-3-030-61687-8_12 · Cited by 3
Strategies for Not-for-Profit Sustainability
Slappy, L. (2019) · ScholarWorks (Walden University) · Cited by 3
On workers' fit with activity-based work environments
Hoendervanger, J. G. (2021) · University of Groningen research database (University of Groningen / Centre for Information Technology) · doi:10.33612/diss.159997877 · Cited by 3
Stumpf, C., & Kämpf-Dern, A. (2025) · Journal of European real estate research · doi:10.1108/jerer-04-2024-0029 · Cited by 2
Wijk, K., Bergsten, E. L., Mathiassen, S. E., & Hallman, D. (2023) · PLoS ONE · doi:10.1371/journal.pone.0281771 · Cited by 2
Nanayakkara, K., Wilkinson, S. J., & Halvitigala, D. (2024) · Journal of Facilities Management · doi:10.1108/jfm-08-2023-0090 · Cited by 2
Wong, C. D., & Jonathan, V. (2024) · International Journal of Academic Research in Business and Social Sciences · doi:10.6007/ijarbss/v14-i10/22878 · Cited by 2
Thakore, R., Kavantera, A., & Whitehall, G. (2021) · Routledge eBooks · doi:10.1201/9781003128786-3 · Cited by 2
Löfstrand, P., & Vinberg, S. (2025) · Cogent Psychology · doi:10.1080/23311908.2025.2540062 · Cited by 2
Towards a holistic assessment of employees’ acceptance of innovative workplace designs
Heywood, C. A., & Sim, E. (2017) · Annual European Real Estate Society Conference (ERES) · doi:10.15396/eres2017_140 · Cited by 2
Investors' insight to co-working spaces in Finland
Lievonen, A. (2017) · Aaltodoc (Aalto University) · Cited by 2
Räume gestalten: Arbeitsumgebungen für die Praxis des neuen Arbeitens
Lanwehr, R., & Kauffeld, S. (2022) · Gruppe Interaktion Organisation Zeitschrift für Angewandte Organisationspsychologie (GIO) · doi:10.1007/s11612-022-00636-7 · Cited by 2
REDESIGNING THE WORKPLACE FOR OPTIMUM EFFICIENCY: A NECESSITY FOR POST PANDEMIC
Alagah, A. (2022) · Zenodo (CERN European Organization for Nuclear Research) · doi:10.5281/zenodo.6966798 · Cited by 1
Tegtmeier, P., Terhoeven, J., & Wischniewski, S. (2023) · Lecture notes in computer science · doi:10.1007/978-3-031-35741-1_34 · Cited by 1
The influence of a 'quiet hub' on the indoor acoustics in an open office environment: A case study
Dort, P. V., & Becker, B. (2022) · Convention of the European Acoustics Association Forum Acusticum · doi:10.61782/fa.2023.0129 · Cited by 1
“Engaging” workplace ecosystem post-pandemic: a real estate industry perspective
Surma, M. J., Nunes, R. J., & Rook, C. (2025) · Journal of Corporate Real Estate · doi:10.1108/jcre-10-2024-0036 · Cited by 1
Agiles Arbeiten im öffentlichen Sektor: Erfahrungen aus Deutschland, Österreich und der Schweiz
Hegele, Y., & Stoll, A. (2025) · Interdisziplinäre Organisations- und Verwaltungsforschung · doi:10.1007/978-3-658-48296-1 · Cited by 1
Making sense of activity-based workplaces: perspectives from staff in a municipal setting
Wall, E., Löfstrand, P., Vinberg, S., & Selander, J. (2026) · International Journal of Qualitative Studies on Health and Well-Being · doi:10.1080/17482631.2026.2631081 · Cited by 1
Ogunseitan, O. F., & Ifaturoti, A. S. (2026) · AFRICAN JOURNAL OF GEOGRAPHICAL SCIENCES · doi:10.5281/zenodo.19408167 · Cited by 1
Pauer, C., Tegtmeier, P., Lafrenz, B., & Deml, B. (2026) · Journal of Public Health · doi:10.1007/s10389-026-02781-5 · Cited by 1
Ability to work and health & safety: property user concerns and satisfaction
Freybote, J., & Carstens, R. (2022) · Journal of Property Research · doi:10.1080/09599916.2022.2138505 · Cited by 1
Musthofa, Z., & Raj, Y. S. (2023) · Southeast Asian Business Review · doi:10.20473/sabr.v1i2.51547 · Cited by 1
Agent-Based Modeling of Occupants for Occupant-Centric Design of Flexible Workplaces
Ono, E., Chong, A., & Lam, K. P. (2023) · Building Simulation Conference proceedings · doi:10.26868/25222708.2023.1405 · Cited by 1
Yaacob, A., Goh, S. K., Gu, M. L., & Tsen, M. K. (2024) · Springer eBooks · doi:10.1007/978-981-99-9371-0_10 · Cited by 1
Aktivitetsbaserade kontorslandskaps inverkan på utrymning
Hellbe, J., & Altesjö, L. (2018) · Lund University Publications Student Papers (Lund University) · Cited by 1
A Brave New Workplace : disclosing the smart and the dark sides of the alternative office spaces
Manca, C. (2019) · UPM Digital Archive (Technical University of Madrid) · doi:10.20868/upm.thesis.55625 · Cited by 1
Nanayakkara, H. L. K. T. (2019) · UTS ePRESS (University of Technology Sydney) · Cited by 3
Lieu de travail basé sur l’activité : une étude de cas dans le secteur des services financiers
Brunet, K. (2019) · doi:10.71781/24447 · Cited by 1
Stohler, J. (2018) · eCommons (Cornell University) · doi:10.7298/x4d798p3 · Cited by 1
Modalidades de Organização do Trabalho Flexibilidade Espaço-Tempo para o Equilíbrio Trabalho-Família
Quintão, E. D. S. (2020) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · doi:10.34626/jrct-pg64 · Cited by 1
Matisic, A., & Högman, D. (2023) · DiVA - Jönköping University · Cited by 2
Rønning, M., Røise, S., & Sogn, F. (2017) · NORA - Norwegian Open Research Archives
Indoor environmental quality conditions in activity-based offices in green buildings
Cândido, C., Wang, S., Thomas, L. J., Zhang, F., Haddad, S., & Ye, W. (2017) · OPUS - Open Publications of UTS Scholars (University of Technology Sydney) · doi:10.26190/unsworks/27329
Arbetsorganisation och ledarskap, MAMF15
Al-Adhami, A., Albayati, E., Andreasson, F., Berg, W. J., Antonsson, P., Doyle, S., Falk, J., Green, S., Hirschfeld, S., Höjbert, E., et al. (2018) · Lund University Publications Student Papers (Lund University)
Övergången till aktivitetsbaserade kontor - ett hot mot gruppidentiteten?
Lövrup, K., Wiman, S., & Åhlin, J. (2018) · Lund University Publications Student Papers (Lund University)
Svendsen, J. G., & Sørheim, R. F. (2019) · NVA (Nasjonalt vitenarkiv)
Abbes, M. (2019) · Research Repository (Delft University of Technology)
Ödlund, K. (2019) · Gothenburg University Publications Electronic Archive (Gothenburg University)
Office landscaping effects in the public sector: where you sit matters
Pollard, C. (2019) · UVic’s Research and Learning Repository (University of Victoria)
Modern Ways of Working: Comparing Results of Two Pilot Studies
Kalve, I., & Capotescu, S. (2020) · ... International Riga Technical University Conference "Scientific Conference on Economics and Entrepreneurship" SCEE'... proceedings/RTU ... International Scientific Conference on Economics and Enterpreneurship SCEE'... proceedings · doi:10.7250/scee.2019.005
Health and Office Architecture
Forooraghi, M. (2020) · Chalmers Research (Chalmers University of Technology)
Forskning på aktivitetsbaserte arbeidsplasskonsepter
Skogland, M. A. C. (2021) · Stat & Styring · doi:10.18261/issn0809-750x-2021-01-10
Metadata
- Authors
- Brunia, S., De Been, I., & van der Voordt, T. J. M.
- Venue
- Journal of Corporate Real Estate
- Publisher
- Emerald
- Published
- 2016-04-04
- Volume
- 18
- Issue
- 1
- Pages
- 30-47
- ISSN
- 1463-001X (ISSN-L)
- OpenAlex
- W2294970302
- Cited by
- 192
- References
- 38
- Citations by year
- 2026: 9 · 2025: 11 · 2024: 19 · 2023: 16 · 2022: 40 · 2021: 27 · 2020: 21 · 2019: 25 · 2018: 15 · 2017: 9
- FWCI
- 25.73
- Type
- journal article
- Language
- en
- Open access
- green
- resolver.tudelft.nl
- Licence
- other-oa
- www.emerald.com/insight/site-policies (tdm)
- Locations
- Journal of Corporate Real Estate (publishedVersion)
- Research Repository (Delft University of Technology) (submittedVersion)
- Data Archiving and Networked Services (DANS) (submittedVersion, other-oa)
- Topics
- Physical Sciences › Engineering › Architecture › Facilities and Workplace Management
- Social Sciences › Education › Educational Environments and Student Outcomes
- Social Sciences › Business, Management and Accounting › Organizational Behavior and Human Resource Management › Corporate Management and Leadership
- Keywords
- activity-based workspaces, flexible work environments, job satisfaction, office interior design, spatial configuration, implementation process, success factors, employee privacy, thermal comfort, ergonomic furniture, open-plan offices
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.