Digital twin-based progress monitoring management model through reality capture to extended reality technologies (DRX)
Open accessThe DOI matches its Crossref record; 88 of the 88 references it cites were found in a registry or an index.
Abstract
Purpose: The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality (RC-to-XR). Design/methodology/approach: IDEF0 data modeling method has been designed to establish an integration of reality capturing technologies by using BIM, DTs and XR for automated construction progress monitoring. Structural equation modeling (SEM) method has been used to test the proposed hypotheses and develop the skill model to examine the reliability, validity and contribution of the framework to understand the DRX model's effectiveness if implemented in real practice. Findings: The research findings validate the positive impact and importance of utilizing technology integration in a logical framework such as DRX, which provides trustable, real-time, transparent and digital construction progress monitoring. Practical implications: DRX system captures accurate, real-time and comprehensive data at construction stage, analyses data and information precisely and quickly, visualizes information and reports in a real scale environment, facilitates information flows and communication, learns from itself, historical data and accessible online data to predict future actions, provides semantic and digitalize construction information with analytical capabilities and optimizes decision-making process. Originality/value: The research presents a framework of an automated construction progress monitoring system that integrates BIM, various reality capturing technologies, DT and XR technologies (VR, AR and MR), arraying the steps on how these technologies work collaboratively to create, capture, generate, analyze, manage and visualize construction progress data, information and reports.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Towards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
Digital Twins: The Convergence of Multimedia Technologies
El Saddik, A. (2018) · IEEE MultiMedia · doi:10.1109/mmul.2018.023121167 · Cited by 817
Applications of wireless sensor networks for urban areas: A survey
Rashid, B., & Rehmani, M. H. (2016) · Journal of Network and Computer Applications · doi:10.1016/j.jnca.2015.09.008 · Cited by 731
Digital Twin as a Service (DTaaS) in Industry 4.0: An Architecture Reference Model
Aheleroff, S., Xu, X., Zhong, R. Y., & Lu, Y. (2021) · Advanced Engineering Informatics · doi:10.1016/j.aei.2020.101225 · Cited by 658
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
Digital Twin: Vision, Benefits, Boundaries, and Creation for Buildings
Khajavi, S. H., Motlagh, N. H., Jaribion, A., Werner, L. C., & Holmstrom, J. (2019) · IEEE Access · doi:10.1109/access.2019.2946515 · Cited by 597
Bosché, F., Ahmed, M., Turkan, Y., Haas, C. T., & Haas, R. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.05.014 · Cited by 550
A BIM-data mining integrated digital twin framework for advanced project management
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103564 · Cited by 518
From BIM to extended reality in AEC industry
Alizadehsalehi, S., Hadavi, A., & Huang, J. C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103254 · Cited by 469
Self-citationDeng, M., Menassa, C. C., & Kamat, V. R. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.005 · Cited by 422
Cited by
Tao, F., Xiao, B., Qi, Q., Cheng, J., & Ji, P. (2022) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2022.06.015 · Cited by 1,255
Digital twin: benefits, use cases, challenges, and opportunities
Attaran, M., & Celik, B. G. (2023) · Decision Analytics Journal · doi:10.1016/j.dajour.2023.100165 · Cited by 704
Yin, Y., Zheng, P., Li, C., & Wang, L. (2023) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2022.102515 · Cited by 271
Safikhani, S., Keller, S., Schweiger, G., & Pirker, J. (2022) · International Journal of Digital Earth · doi:10.1080/17538947.2022.2038291 · Cited by 176
An Adapted Model of Cognitive Digital Twins for Building Lifecycle Management
Yitmen, I., Alizadehsalehi, S., Akıner, İ., & Akıner, M. E. (2021) · Applied Sciences · doi:10.3390/app11094276 · Cited by 165
Self-citationBIM and Digital Twin for Developing Convergence Technologies as Future of Digital Construction
Sepasgozar, S., Khan, A., Smith, K., Romero, J., Shen, X., Shirowzhan, S., Li, H., & Tahmasebinia, F. (2023) · Buildings · doi:10.3390/buildings13020441 · Cited by 162
“Sepehr et al. [77] emphasized the crucial significance of technology integration of BIM, XR, and DRX for construction progress monitoring based on DT. Sepasgozar [14] implemented the integration utilization of VR, AR, IoT, and DT, in education use for students to acquire knowledge of running…”
BackgroundInfluential
Metadata
- Authors
- Alizadehsalehi, S., & Yitmen, I.
- Venue
- Smart and Sustainable Built Environment
- Publisher
- Emerald
- Published
- 2021-04-30
- Volume
- 12
- Issue
- 1
- Pages
- 200-236
- ISSN
- 2046-6099 (ISSN-L)
- 2046-6102
- OpenAlex
- W3157108221
- Cited by
- 227
- References
- 88
- FWCI
- 16.37
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.